Council planning record

Continuation of Integrated Waste Management Facility1 permitted by ESS/34/15/BTE without compliance with conditions 2 (application details), 14 (stack [chimney] design and cladding), 17 (Combined Heat & Power Plant Management Plan) and 56 (maximum stack height) to amend details resulting from the increase in stack height. Note 1: The Integrated Waste Management Facility comprises Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.

Land at Rivenhall Airfield, Coggeshall Road (A120), Braintree CO5 9DF

Decision MadeReference: ESS/37/17/BTEEssex County Council

Last published check: 29 Sept 2026, 09:11. Check the council record for more recent changes.

Application location

Land at Rivenhall Airfield, Coggeshall Road (A120), Braintree CO5 9DF

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Removal/Variation of Condition ESS EIA
Received
20 Jul 2017
Validated
20 Jul 2017
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Continuation of Integrated Waste Management Facility1 permitted by ESS/34/15/BTE without compliance with conditions 2 (application details), 14 (stack [chimney] design and cladding), 17 (Combined Heat & Power Plant Management Plan) and 56 (maximum stack height) to amend details resulting from the increase in stack height. Note 1: The Integrated Waste Management Facility comprises Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.

Proposal details

Reference
ESS/37/17/BTE
Agent
Holmes and Hills LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 481 of 481

DocumentPublishedAction
Decision NoticeDecision Notice20 May 2019View
Reg 24 StatementReg 24 Statement20 May 2019View
Committee Report ESS/37/17/BTE & ESS/36/17/BTE April 2019Committee Report ESS/37/17/BTE & ESS/36/17/BTE April 201917 Apr 2019View
Committee Report - Appx A Inspectors Report Rivenhall Airfield Braintree March 2010Committee Report - Appx A Inspectors Report Rivenhall Airfield Braintree March 201017 Apr 2019View
Committee Report - Appx B SoS Decision Letter March 2010Committee Report - Appx B SoS Decision Letter March 201017 Apr 2019View
Committee Report - Appx C Decision Notice ESS/34/15/BTECommittee Report - Appx C Decision Notice ESS/34/15/BTE17 Apr 2019View
Committee Report - Appx D Glossary of AbbreviationsCommittee Report - Appx D Glossary of Abbreviations17 Apr 2019View
Committee Report - Appx E EIA AppraisalCommittee Report - Appx E EIA Appraisal17 Apr 2019View
Committee Report - Appx F Summary of RespresentationsCommittee Report - Appx F Summary of Respresentations17 Apr 2019View
Committee Report - Appx G ESS/34/15/BTE Committee Report Feb 2016Committee Report - Appx G ESS/34/15/BTE Committee Report Feb 201617 Apr 2019View
Committee Report - Appx H Advice Note on Stack Heights and throughoutCommittee Report - Appx H Advice Note on Stack Heights and throughout17 Apr 2019View
Committee Report - Appx I Braintree District Local Plan Review - consistency exerciseCommittee Report - Appx I Braintree District Local Plan Review - consistency exercise17 Apr 2019View
Committee Report - Appx J Advice Note on CHP viability at 200,000tpaCommittee Report - Appx J Advice Note on CHP viability at 200,000tpa17 Apr 2019View
Committee Report - Appx K Habitats Regulation Assessment - Screening Opinion 28 March 2019Committee Report - Appx K Habitats Regulation Assessment - Screening Opinion 28 March 201917 Apr 2019View
Committee Report - Appx L Extract from WLP Site IWMF2 Development PrinciplesCommittee Report - Appx L Extract from WLP Site IWMF2 Development Principles17 Apr 2019View
Addendum D&R Committee 26/04/19Addendum D&R Committee 26/04/1926 Apr 2019View
Committee Minutes, April 2019 - UnapprovedCommittee Minutes, April 2019 - Unapproved20 May 2019View
DELEGATED REPORT ESS3617BTE ESS3717BTE.docDELEGATED REPORT ESS3617BTE ESS3717BTE.doc20 May 2019View
App_Form S73 Application Form_30.06.17.pdfApp_Form S73 Application Form_30.06.17.pdf21 Jul 2017View
Letter to Essex County Council - IWMF Stack Applications - 2017-06-30 - A.0(1).pdfLetter to Essex County Council - IWMF Stack Applications - 2017-06-30 - A.0(1).pdf21 Jul 2017View
IWMF Section 73 Document and Electronic File List A.3(1).pdfIWMF Section 73 Document and Electronic File List A.3(1).pdf20 Jul 2017View
S73_B - Planning Application Supporting Statement A.1.pdfS73_B - Planning Application Supporting Statement A.1.pdf21 Jul 2017View
S73_B Appendix PASS A-1_ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdfS73_B Appendix PASS A-1_ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdf21 Jul 2017View
S73_B Appendix PASS A-2_Decision_Notice_ESS3415BTE Final-Planning Permission & Conditions.pdfS73_B Appendix PASS A-2_Decision_Notice_ESS3415BTE Final-Planning Permission & Conditions.pdf21 Jul 2017View
S73_B Appendix PASS A-3_ESS3415BTE11 - Decision Letter_ECC 14 March 2016 - Implementation.pdfS73_B Appendix PASS A-3_ESS3415BTE11 - Decision Letter_ECC 14 March 2016 - Implementation.pdf21 Jul 2017View
S73_B PASS FIG 1-1A Land Ownership and Proposed Site Plan.pdfS73_B PASS FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
S73_B PASS Drawing 20-01-21 IWMF Stack 10km ZTV.pdfS73_B PASS Drawing 20-01-21 IWMF Stack 10km ZTV.pdf21 Jul 2017View
S73_B PASS Drawing 20-01-22 IWMF Stack 3km ZTV.pdfS73_B PASS Drawing 20-01-22 IWMF Stack 3km ZTV.pdf21 Jul 2017View
S73_B PASS Drawing C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2.PDFS73_B PASS Drawing C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2.PDF21 Jul 2017View
S73_B PASS Drawing C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2.PDFS73_B PASS Drawing C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2.PDF21 Jul 2017View
S73_B PASS Drawing C23.3_142064-DC-GA-C-111A Drainage Construction Details.pdfS73_B PASS Drawing C23.3_142064-DC-GA-C-111A Drainage Construction Details.pdf21 Jul 2017View
S73_P DAS Design & Access Statement 2017 - A.1.pdfS73_P DAS Design & Access Statement 2017 - A.1.pdf21 Jul 2017View
S73_Q - Biodiversity_Toolkit_Validation_Checklist Section 73.pdfS73_Q - Biodiversity_Toolkit_Validation_Checklist Section 73.pdf21 Jul 2017View
S73_Q Biodiversity_Toolkit_ Signature Full Section 73.pdfS73_Q Biodiversity_Toolkit_ Signature Full Section 73.pdf21 Jul 2017View
C17 - Variation to Condition 17 - A.1.pdfC17 - Variation to Condition 17 - A.1.pdf21 Jul 2017View
C17.1[A] S1552-0700-0008RSF CHP Management Plan for Plume Abatement_v10.pdfC17.1[A] S1552-0700-0008RSF CHP Management Plan for Plume Abatement_v10.pdf21 Jul 2017View
C17.2[A] S1552-0700-0013RSF Plume Visibility Analysis_v8.pdfC17.2[A] S1552-0700-0013RSF Plume Visibility Analysis_v8.pdf21 Jul 2017View
C17 - Electronic File List A.1.pdfC17 - Electronic File List A.1.pdf21 Jul 2017View
C14.3 [A] ALUCOBOND reflect data sheet.pdfC14.3 [A] ALUCOBOND reflect data sheet.pdf21 Jul 2017View
C14.4 [A] ALUCOBOND_Cleaning and Maintenance_new.pdfC14.4 [A] ALUCOBOND_Cleaning and Maintenance_new.pdf21 Jul 2017View
C14.5 [A] High Safe Solutions WT 1000 Mobile Crane Specification.pdfC14.5 [A] High Safe Solutions WT 1000 Mobile Crane Specification.pdf21 Jul 2017View
C14.6 [A] Rivenhall IWMF - proposed increase in stack height.pdfC14.6 [A] Rivenhall IWMF - proposed increase in stack height.pdf21 Jul 2017View
C14 - Electronic File List A.1.pdfC14 - Electronic File List A.1.pdf21 Jul 2017View
C14 - Variation to Condition 2017 - A.1.pdfC14 - Variation to Condition 2017 - A.1.pdf21 Jul 2017View
C14.1 [A] LA01B_Chimney stack top cladding details plan & elevations.pdfC14.1 [A] LA01B_Chimney stack top cladding details plan & elevations.pdf21 Jul 2017View
C14.2 [A] LA02B_Chimney stack top cladding details fixing details.pdfC14.2 [A] LA02B_Chimney stack top cladding details fixing details.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-9A Simplified Process Flow.pdfC2 Appendix 2A_FIG 1-9A Simplified Process Flow.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-10A Integrated Process Flow.pdfC2 Appendix 2A_FIG 1-10A Integrated Process Flow.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-3B Site Plan Layout - Jan_16.pdfC2 Appendix 2A_FIG 3-3B Site Plan Layout - Jan_16.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-8E Building and Process Cross Section.pdfC2 Appendix 2A_FIG 3-8E Building and Process Cross Section.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-12E Bldg & Process Layout X Sections.pdfC2 Appendix 2A_FIG 3-12E Bldg & Process Layout X Sections.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-14B Upper Lagoon and Wetland Shelf.pdfC2 Appendix 2A_FIG 3-14B Upper Lagoon and Wetland Shelf.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-16 Services Plan.pdfC2 Appendix 2A_FIG 3-16 Services Plan.pdf21 Jul 2017View
C2 Appendix 2A_FIG 3-19D General Arrangement & Front Elevation.pdfC2 Appendix 2A_FIG 3-19D General Arrangement & Front Elevation.pdf21 Jul 2017View
C2 Appendix 2A_FIG 8-6A Landscape Mitigation Measures.pdfC2 Appendix 2A_FIG 8-6A Landscape Mitigation Measures.pdf21 Jul 2017View
C2 Appendix 2A_FIG 19-2C Tree Survey Plan.pdfC2 Appendix 2A_FIG 19-2C Tree Survey Plan.pdf21 Jul 2017View
C2 Appendix 2A_FIG 19-3C Tree Constraints Plan.pdfC2 Appendix 2A_FIG 19-3C Tree Constraints Plan.pdf21 Jul 2017View
C2 Appendix 2A_FIG 19-5A Base Plan Woodhouse Farm.pdfC2 Appendix 2A_FIG 19-5A Base Plan Woodhouse Farm.pdf21 Jul 2017View
C2 Appendix 2A_IT569-SK06A Proposed Improvements to Site Access Road Junction with Church Road.pdfC2 Appendix 2A_IT569-SK06A Proposed Improvements to Site Access Road Junction with Church Road.pdf21 Jul 2017View
C2 Appendix 2A_ITI569-SK07A Proposed Improvements to Site Access Road Junction with Ash Lane.pdfC2 Appendix 2A_ITI569-SK07A Proposed Improvements to Site Access Road Junction with Ash Lane.pdf21 Jul 2017View
C2 Appendix 2A_Rivenhall IWMF Roof Layout Plan RP01.pdfC2 Appendix 2A_Rivenhall IWMF Roof Layout Plan RP01.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-1A Land Ownership and Proposed Site Plan.pdfC2 Appendix 2B_FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-2B Proposed Planning Application Area.pdfC2 Appendix 2B_FIG 1-2B Proposed Planning Application Area.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-5C Typical Arrangement and Architectural Features.pdfC2 Appendix 2B_FIG 1-5C Typical Arrangement and Architectural Features.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdfC2 Appendix 2B_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-9A Simplified Process Flow.pdfC2 Appendix 2B_FIG 1-9A Simplified Process Flow.pdf21 Jul 2017View
C2 Appendix 2B_FIG 1-10A Integrated Process Flow.pdfC2 Appendix 2B_FIG 1-10A Integrated Process Flow.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-3B Site Plan Layout - Jan_16.pdfC2 Appendix 2B_FIG 3-3B Site Plan Layout - Jan_16.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-8F Building and Process Cross Sections.pdfC2 Appendix 2B_FIG 3-8F Building and Process Cross Sections.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-12F Building and Process Layout and Cross Sections.pdfC2 Appendix 2B_FIG 3-12F Building and Process Layout and Cross Sections.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-14B Upper Lagoon and Wetland Shelf.pdfC2 Appendix 2B_FIG 3-14B Upper Lagoon and Wetland Shelf.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-16A Services Plan.pdfC2 Appendix 2B_FIG 3-16A Services Plan.pdf21 Jul 2017View
C2 Appendix 2B_FIG 3-19E General Arrangement & Front Elevation.pdfC2 Appendix 2B_FIG 3-19E General Arrangement & Front Elevation.pdf21 Jul 2017View
C2 Appendix 2B_Fig 8-6B Landscape Mitigation Measures.PDFC2 Appendix 2B_Fig 8-6B Landscape Mitigation Measures.PDF21 Jul 2017View
C2 Appendix 2B_FIG 19-2D Tree Survey.pdfC2 Appendix 2B_FIG 19-2D Tree Survey.pdf21 Jul 2017View
C2 Appendix 2B_FIG 19-3D Tree Constraints Plan.pdfC2 Appendix 2B_FIG 19-3D Tree Constraints Plan.pdf21 Jul 2017View
C2 Appendix 2B_FIG 19-5A Base Plan Woodhouse Farm.pdfC2 Appendix 2B_FIG 19-5A Base Plan Woodhouse Farm.pdf21 Jul 2017View
C2 Appendix 2B_IT569_S278_03D Proposed Improvements to Site Access Road Junction with Church Road.PDFC2 Appendix 2B_IT569_S278_03D Proposed Improvements to Site Access Road Junction with Church Road.PDF21 Jul 2017View
C2 Appendix 2B_IT569_S278_04D Proposed Improvements to Site Access Road Junction with Ash Lane.PDFC2 Appendix 2B_IT569_S278_04D Proposed Improvements to Site Access Road Junction with Ash Lane.PDF21 Jul 2017View
C2 Appendix 2B_Rivenhall IWMF Roof Layout Plan RP01.pdfC2 Appendix 2B_Rivenhall IWMF Roof Layout Plan RP01.pdf21 Jul 2017View
C2 - Electronic File List A.1.pdfC2 - Electronic File List A.1.pdf21 Jul 2017View
C2 - Variation to Condition 2017 - A.1.pdfC2 - Variation to Condition 2017 - A.1.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-1A Land Ownership and Proposed Site Plan.pdfC2 Appendix 2A_FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-2B Proposed Planning Application Area.pdfC2 Appendix 2A_FIG 1-2B Proposed Planning Application Area.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-5B Typical Arrangement & Architectural Features.pdfC2 Appendix 2A_FIG 1-5B Typical Arrangement & Architectural Features.pdf21 Jul 2017View
C2 Appendix 2A_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdfC2 Appendix 2A_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdf21 Jul 2017View
Environment checklistEnvironment checklist25 Jul 2017View
S73_H7.1 Appendix 7A IWMF Ecological Monitoring Report 2016.pdfS73_H7.1 Appendix 7A IWMF Ecological Monitoring Report 2016.pdf26 Jul 2017View
S73_H7.1 Appendix 7B C53.1_IWMF Condition 53 Ecological Report.pdf(1).pdfS73_H7.1 Appendix 7B C53.1_IWMF Condition 53 Ecological Report.pdf(1).pdf26 Jul 2017View
S73_H7.1 Appendix 7E Services Route Ecological Assessment 2015.pdfS73_H7.1 Appendix 7E Services Route Ecological Assessment 2015.pdf26 Jul 2017View
S73_H7.1 Appendix 7B C53.1_IWMF Condition 53 Ecological Report.pdfS73_H7.1 Appendix 7B C53.1_IWMF Condition 53 Ecological Report.pdf26 Jul 2017View
S73_H7.1 Appendix 7C C54.1 IWMF Habitat Mangement Plan - July 2015.pdfS73_H7.1 Appendix 7C C54.1 IWMF Habitat Mangement Plan - July 2015.pdf26 Jul 2017View
Rivenhall Variation of condition 14Rivenhall Variation of condition 141 May 2018View
IWMF MRF MBT Recyclate Recovery CHPIWMF MRF MBT Recyclate Recovery CHP1 May 2018View
25-4-19 Email from Herbert Smith Freehills25-4-19 Email from Herbert Smith Freehills16 May 2019View
25-4-19 Email from Herbert Smith Freehills25-4-19 Email from Herbert Smith Freehills16 May 2019View
S73_C1 IWMF Addendum ES Executive Summary 2017 - A.0.pdfS73_C1 IWMF Addendum ES Executive Summary 2017 - A.0.pdf21 Jul 2017View
S73_C2 Chapter 2 Introduction 2017 - A.2.pdfS73_C2 Chapter 2 Introduction 2017 - A.2.pdf21 Jul 2017View
S73_C2 FIG 1-1A Land Ownership and Proposed Site Plan.pdfS73_C2 FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
S73_C2.1 Appendix 2A ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdfS73_C2.1 Appendix 2A ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdf21 Jul 2017View
S73_C2.2 Appendix 2A Decision_Notice_ESS3415BTE Final-Planning Permission & Conditions.pdfS73_C2.2 Appendix 2A Decision_Notice_ESS3415BTE Final-Planning Permission & Conditions.pdf21 Jul 2017View
S73_C2.3 Appendix 2A Decision Letter_ECC 14 March 2016 - Implementation.pdfS73_C2.3 Appendix 2A Decision Letter_ECC 14 March 2016 - Implementation.pdf21 Jul 2017View
S73_D3 Chapter 3 Updated Environmental Statement 2017 - A.1.pdfS73_D3 Chapter 3 Updated Environmental Statement 2017 - A.1.pdf21 Jul 2017View
S73_D3.1 Appendix 3A Description of Development - A.1.pdfS73_D3.1 Appendix 3A Description of Development - A.1.pdf21 Jul 2017View
S73_D3.2 Appendix 3A FIG 1-1A Land Ownership and Proposed Site Plan.pdfS73_D3.2 Appendix 3A FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
S73_D3.3 Appendix 3A C25.4 Dwg 213033-150= As-Built Borehole Locations.pdfS73_D3.3 Appendix 3A C25.4 Dwg 213033-150= As-Built Borehole Locations.pdf21 Jul 2017View
S73_D3.4 Appendix 3A C22.3_142064-DC-GA-C-111A Drainage Construction Details.pdfS73_D3.4 Appendix 3A C22.3_142064-DC-GA-C-111A Drainage Construction Details.pdf21 Jul 2017View
S73_D3.5 Appendix 3A Drawing 007-3 New Field Lagoon Sections.pdfS73_D3.5 Appendix 3A Drawing 007-3 New Field Lagoon Sections.pdf21 Jul 2017View
S73_D3.6 Appendix 3A C59.7_732.1_10A HDA D3 Tree Protection Fencing.pdfS73_D3.6 Appendix 3A C59.7_732.1_10A HDA D3 Tree Protection Fencing.pdf21 Jul 2017View
S73_D3.7 Appendix 3A C59.6_732.1_08A HDA D1 Rabbit Proof Fence Detail.pdfS73_D3.7 Appendix 3A C59.6_732.1_08A HDA D1 Rabbit Proof Fence Detail.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-1A Land Ownership and Proposed Site Plan.pdfS73_D3.8 Appendix 3B_FIG 1-1A Land Ownership and Proposed Site Plan.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-2B Proposed Planning Application Area.pdfS73_D3.8 Appendix 3B_FIG 1-2B Proposed Planning Application Area.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-5B Typical Arrangement & Architectural Features.pdfS73_D3.8 Appendix 3B_FIG 1-5B Typical Arrangement & Architectural Features.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdfS73_D3.8 Appendix 3B_FIG 1-8 Schematic Arrangement of Woodhouse Farm.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-9A Simplified Process Flow.pdfS73_D3.8 Appendix 3B_FIG 1-9A Simplified Process Flow.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 1-10A Integrated Process Flow.pdfS73_D3.8 Appendix 3B_FIG 1-10A Integrated Process Flow.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-3B Site Plan Layout - Jan_16.pdfS73_D3.8 Appendix 3B_FIG 3-3B Site Plan Layout - Jan_16.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-8E Building and Process Cross Section.pdfS73_D3.8 Appendix 3B_FIG 3-8E Building and Process Cross Section.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-12E Bldg & Process Layout X Sections.pdfS73_D3.8 Appendix 3B_FIG 3-12E Bldg & Process Layout X Sections.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-14B Upper Lagoon and Wetland Shelf.pdfS73_D3.8 Appendix 3B_FIG 3-14B Upper Lagoon and Wetland Shelf.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-16 Services Plan.pdfS73_D3.8 Appendix 3B_FIG 3-16 Services Plan.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 3-19D General Arrangement & Front Elevation.pdfS73_D3.8 Appendix 3B_FIG 3-19D General Arrangement & Front Elevation.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 8-6A Landscape Mitigation Measures.pdfS73_D3.8 Appendix 3B_FIG 8-6A Landscape Mitigation Measures.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 19-2C Tree Survey Plan.pdfS73_D3.8 Appendix 3B_FIG 19-2C Tree Survey Plan.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 19-3C Tree Constraints Plan.pdfS73_D3.8 Appendix 3B_FIG 19-3C Tree Constraints Plan.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_FIG 19-5A Base Plan Woodhouse Farm.pdfS73_D3.8 Appendix 3B_FIG 19-5A Base Plan Woodhouse Farm.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_IT569-SK06A Proposed Improvements to Site Access Road Junction with Church Road.pdfS73_D3.8 Appendix 3B_IT569-SK06A Proposed Improvements to Site Access Road Junction with Church Road.pdf21 Jul 2017View
S73_D3.8 Appendix 3B_ITI569-SK07A Proposed Improvements to Site Access Road Junction with Ash Lane.pdfS73_D3.8 Appendix 3B_ITI569-SK07A Proposed Improvements to Site Access Road Junction with Ash Lane.pdf21 Jul 2017View
Appendix 3B - IWMF RP 01 Roof Layout PlanAppendix 3B - IWMF RP 01 Roof Layout Plan21 Jul 2017View
Appendix 3C - FIG 1-1A Land Ownership and Proposed Site PlanAppendix 3C - FIG 1-1A Land Ownership and Proposed Site Plan21 Jul 2017View
Appendix 3C - FIG 1-2B Proposed Planning Application AreaAppendix 3C - FIG 1-2B Proposed Planning Application Area21 Jul 2017View
Appendix 3C - FIG 1-5C Typical Arrangement and Architectural FeaturesAppendix 3C - FIG 1-5C Typical Arrangement and Architectural Features21 Jul 2017View
Appendix 3C - FIG 1-8 Schematic Arrangement of Woodhouse FarmAppendix 3C - FIG 1-8 Schematic Arrangement of Woodhouse Farm21 Jul 2017View
Appendix 3C - FIG 1-9A Simplified Process FlowAppendix 3C - FIG 1-9A Simplified Process Flow21 Jul 2017View
Appendix 3C - FIG 1-10A Integrated Process FlowAppendix 3C - FIG 1-10A Integrated Process Flow21 Jul 2017View
Appendix 3C - FIG 3-3B Site Plan LayoutAppendix 3C - FIG 3-3B Site Plan Layout21 Jul 2017View
Appendix 3C - FIG 3-8F Building and Process Cross SectionsAppendix 3C - FIG 3-8F Building and Process Cross Sections21 Jul 2017View
Appendix 3C - FIG 3-12F Building and Process Layout and Cross SectionsAppendix 3C - FIG 3-12F Building and Process Layout and Cross Sections21 Jul 2017View
Appendix 3C - FIG 3-14B Upper Lagoon and Wetland ShelfAppendix 3C - FIG 3-14B Upper Lagoon and Wetland Shelf21 Jul 2017View
Appendix 3C - FIG 3-16A Services PlanAppendix 3C - FIG 3-16A Services Plan21 Jul 2017View
Appendix 3C - FIG 3-19E General Arrangement & Front ElevationAppendix 3C - FIG 3-19E General Arrangement & Front Elevation21 Jul 2017View
Appendix 3C - FIG 8-6B Landscape Mitigation MeasuresAppendix 3C - FIG 8-6B Landscape Mitigation Measures21 Jul 2017View
Appendix 3C - FIG 19-2D Tree SurveyAppendix 3C - FIG 19-2D Tree Survey21 Jul 2017View
Appendix 3C - FIG 19-3D Tree Constraints PlanAppendix 3C - FIG 19-3D Tree Constraints Plan21 Jul 2017View
Appendix 3C - FIG 19-5A Base Plan Woodhouse FarmAppendix 3C - FIG 19-5A Base Plan Woodhouse Farm21 Jul 2017View
Appendix 3C - IT569_S278_03B Proposed Improvements to Site Access Road Junction with Church RoadAppendix 3C - IT569_S278_03B Proposed Improvements to Site Access Road Junction with Church Road21 Jul 2017View
Appendix 3C - IT569_S278_ 04D Proposed Improvements to Site Access Road Junction with Ash LaneAppendix 3C - IT569_S278_ 04D Proposed Improvements to Site Access Road Junction with Ash Lane21 Jul 2017View
Appendix 3C - IWMF RP 01 Roof Layout PlanAppendix 3C - IWMF RP 01 Roof Layout Plan21 Jul 2017View
S73_E4 Chapter 4 Description of Foreseeable Developments 2017 - A.1.pdfS73_E4 Chapter 4 Description of Foreseeable Developments 2017 - A.1.pdf21 Jul 2017View
Appendix 4A - Electricity Cable Installation StatementAppendix 4A - Electricity Cable Installation Statement21 Jul 2017View
Appendix 4A - JJ0143-Cable Route-901-Location PlanAppendix 4A - JJ0143-Cable Route-901-Location Plan21 Jul 2017View
Appendix 4A - JJ0143-Cable Route-902-Braintree 132kV SubstationAppendix 4A - JJ0143-Cable Route-902-Braintree 132kV Substation21 Jul 2017View
Appendix 4A - JJ0143-Cable Route-903-Lanham GreenAppendix 4A - JJ0143-Cable Route-903-Lanham Green21 Jul 2017View
Appendix 4A - JJ0143-Cable Route-904-Lapdog Green & Perrry GreenAppendix 4A - JJ0143-Cable Route-904-Lapdog Green & Perrry Green21 Jul 2017View
Appendix 4A - JJ0143-Cable Route-905-CHP Access RoadAppendix 4A - JJ0143-Cable Route-905-CHP Access Road21 Jul 2017View
Appendix 4B - Cog_2 Environmental Supporting Statement Coggeshall AbstractionAppendix 4B - Cog_2 Environmental Supporting Statement Coggeshall Abstraction21 Jul 2017View
Appendix 4B - Cog_3 Environmental Supporting Statement Appendix A - Gazetteer of Cultural HeritageAppendix 4B - Cog_3 Environmental Supporting Statement Appendix A - Gazetteer of Cultural Heritage21 Jul 2017View
Appendix 4B - Cog_7 IT569 -M-03A TransportAppendix 4B - Cog_7 IT569 -M-03A Transport21 Jul 2017View
Appendix 4B - Cog_499-12-3 Ecology Water Pipeline Route to Existing Abstraction PointAppendix 4B - Cog_499-12-3 Ecology Water Pipeline Route to Existing Abstraction Point21 Jul 2017View
Appendix 4B - Drg 101 - Proposed Rising Main General ArrangementAppendix 4B - Drg 101 - Proposed Rising Main General Arrangement21 Jul 2017View
Appendix 4B - Drg 102 - Proposed Rising MainAppendix 4B - Drg 102 - Proposed Rising Main21 Jul 2017View
Appendix 4B - Drg 103 - Longsection Though Rising MainAppendix 4B - Drg 103 - Longsection Though Rising Main21 Jul 2017View
Appendix 4B - Drg 104 - Rising Main DetailsAppendix 4B - Drg 104 - Rising Main Details21 Jul 2017View
Appendix 4B - Drg 105 - Proposed Abstraction pointAppendix 4B - Drg 105 - Proposed Abstraction point21 Jul 2017View
Appendix 4B - Drg 106 - Proposed Abstraction point Pumping Station DetailAppendix 4B - Drg 106 - Proposed Abstraction point Pumping Station Detail21 Jul 2017View
Appendix 4B - Drg 107 - New Field Lagoon SectionsAppendix 4B - Drg 107 - New Field Lagoon Sections21 Jul 2017View
Appendix 4B - Drg 108 - New Field Lagoon Storm Water ManagementAppendix 4B - Drg 108 - New Field Lagoon Storm Water Management21 Jul 2017View
Appendix 4B - Drg 109 - New Field Lagoon intake and Outlet DetailsAppendix 4B - Drg 109 - New Field Lagoon intake and Outlet Details21 Jul 2017View
Appendix 4B - Drg 110 - Sheepcotes Lagoon SectionsAppendix 4B - Drg 110 - Sheepcotes Lagoon Sections21 Jul 2017View
Appendix 4B - Drg 111 - Sheepcotes Lagoon Intake and Outlet DetailsAppendix 4B - Drg 111 - Sheepcotes Lagoon Intake and Outlet Details21 Jul 2017View
Appendix 4B - Drg 112 - Indicative Lagoon Embankment and Spillway DesignAppendix 4B - Drg 112 - Indicative Lagoon Embankment and Spillway Design21 Jul 2017View
Appendix 4B - Drg 113 - Land Ownership & Planning Application BoundaryAppendix 4B - Drg 113 - Land Ownership & Planning Application Boundary21 Jul 2017View
Appendix 4B - Figure 1 - LocationAppendix 4B - Figure 1 - Location21 Jul 2017View
Appendix 4B - Figure 2 - Areas of Previous Works (Bradwell Quarry)Appendix 4B - Figure 2 - Areas of Previous Works (Bradwell Quarry)21 Jul 2017View
Appendix 4B - Figure 3 - Heritage AssetsAppendix 4B - Figure 3 - Heritage Assets21 Jul 2017View
Appendix 4B - Figure 4 - Public Rights of WayAppendix 4B - Figure 4 - Public Rights of Way21 Jul 2017View
Appendix 4B - Figure 5 - Heritage Assets - CropmarksAppendix 4B - Figure 5 - Heritage Assets - Cropmarks21 Jul 2017View
Appendix 4B - Figure 6 - Extract from the 1st Edition Ordnance SurveyAppendix 4B - Figure 6 - Extract from the 1st Edition Ordnance Survey21 Jul 2017View
Appendix 4B - Figure 7 - Extract from the 2nd Edition Ordnance SurveyAppendix 4B - Figure 7 - Extract from the 2nd Edition Ordnance Survey21 Jul 2017View
Appendix 4B - Figure 8 - Extract from the Ordnance SurveyAppendix 4B - Figure 8 - Extract from the Ordnance Survey21 Jul 2017View
S73_E4.2 Appendix 4B_Figure 9 - Summary of impacts arising from the works. Water Connections.pdfS73_E4.2 Appendix 4B_Figure 9 - Summary of impacts arising from the works. Water Connections.pdf21 Jul 2017View
S73_E4.2 Appendix 4B_Figure 10 - IWMF Consent Area.pdfS73_E4.2 Appendix 4B_Figure 10 - IWMF Consent Area.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-1-Letter to ECC -New Field Stockpile - 26_Jan_2016 - A.3.pdfS73_E4.3 Appendix 4C-1-Letter to ECC -New Field Stockpile - 26_Jan_2016 - A.3.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-2-1 EXTENSION OF QUARRYING OPERATIONS.pdfS73_E4.3 Appendix 4C-2-1 EXTENSION OF QUARRYING OPERATIONS.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-3-3 RESTORATION PROPOSALS.pdfS73_E4.3 Appendix 4C-3-3 RESTORATION PROPOSALS.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-4-3-5 Geological Map.pdfS73_E4.3 Appendix 4C-4-3-5 Geological Map.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-5-3-7 Phasing & Extraction Plan.pdfS73_E4.3 Appendix 4C-5-3-7 Phasing & Extraction Plan.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-6-3-I Revised Restoration New Field Stockpile and Lagoon.pdfS73_E4.3 Appendix 4C-6-3-I Revised Restoration New Field Stockpile and Lagoon.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-7-3-J Revised Restoration IWMF & Bradwell Quarry.pdfS73_E4.3 Appendix 4C-7-3-J Revised Restoration IWMF & Bradwell Quarry.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-8-20-01-04_Rev-F_Construction Phase - New Field Stockpile and Lagoon.pdfS73_E4.3 Appendix 4C-8-20-01-04_Rev-F_Construction Phase - New Field Stockpile and Lagoon.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-9-20-01-07_REV-B_Integrated Phasing Sequence and Restoration.pdfS73_E4.3 Appendix 4C-9-20-01-07_REV-B_Integrated Phasing Sequence and Restoration.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-10-20-01-10_REV-A_Long Sections.pdfS73_E4.3 Appendix 4C-10-20-01-10_REV-A_Long Sections.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-11-AE Sequencing Master.pdfS73_E4.3 Appendix 4C-11-AE Sequencing Master.pdf21 Jul 2017View
S73_E4.3 Appendix 4C-12-GA-PA-00 rev A Site R Phasing Summary.pdfS73_E4.3 Appendix 4C-12-GA-PA-00 rev A Site R Phasing Summary.pdf21 Jul 2017View
S73_E4.3 Appendix 4CA-1-Landscape & Visual Appraisal - New Field Stockpile & Sheepcotes Lagoon.PDFS73_E4.3 Appendix 4CA-1-Landscape & Visual Appraisal - New Field Stockpile & Sheepcotes Lagoon.PDF21 Jul 2017View
S73_E4.3 Appendix 4CA-2-Drg 01 Regional Landscape Character Areas and Planning Designations.pdfS73_E4.3 Appendix 4CA-2-Drg 01 Regional Landscape Character Areas and Planning Designations.pdf21 Jul 2017View
S73_E4.3 Appendix 4CA-3-Drg 02 Local Landscape Character Areas.pdfS73_E4.3 Appendix 4CA-3-Drg 02 Local Landscape Character Areas.pdf21 Jul 2017View
S73_E4.3 Appendix 4CA-4-Drg 03 Public Rights of Way.pdfS73_E4.3 Appendix 4CA-4-Drg 03 Public Rights of Way.pdf21 Jul 2017View
S73_E4.3 Appendix 4CA-5-Drg 05 TPO.PDFS73_E4.3 Appendix 4CA-5-Drg 05 TPO.PDF21 Jul 2017View
S73_E4.3 Appendix 4CA-6-Drg 06 ZTV.PDFS73_E4.3 Appendix 4CA-6-Drg 06 ZTV.PDF21 Jul 2017View
S73_E4.3 Appendix 4CA-7Photograph Sheets 1 to 17.PDFS73_E4.3 Appendix 4CA-7Photograph Sheets 1 to 17.PDF21 Jul 2017View
S73_E4.3 Appendix 4CB-1-Acoustic Assessment - New Field Stockpile & Sheepcotes Lagoon.pdfS73_E4.3 Appendix 4CB-1-Acoustic Assessment - New Field Stockpile & Sheepcotes Lagoon.pdf21 Jul 2017View
S73_F5 Chapter 5 Land Use & Contaminated Land 2017 - A.1.pdfS73_F5 Chapter 5 Land Use & Contaminated Land 2017 - A.1.pdf21 Jul 2017View
S73_G6.1 Chapter 6.1 Surface Water and Flood Risk 2017 - A.1.pdfS73_G6.1 Chapter 6.1 Surface Water and Flood Risk 2017 - A.1.pdf21 Jul 2017View
S73_G6.1 Drawing 007-3 New Field Lagoon Sections.pdfS73_G6.1 Drawing 007-3 New Field Lagoon Sections.pdf21 Jul 2017View
S73_G6.1.1 Appendix 6-1A C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2.PDFS73_G6.1.1 Appendix 6-1A C23.1[A]_142064-DC-GA-C-108G Drainage Layout 1 of 2.PDF21 Jul 2017View
S73_G6.1.1 Appendix 6-1A C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2.PDFS73_G6.1.1 Appendix 6-1A C23.2[A]_142064-DC-GA-C-109G Drainage Layout 2 of 2.PDF21 Jul 2017View
S73_G6.1.1 Appendix 6-1A C23.3_142064-DC-GA-C-111A Drainage Construction Details.pdfS73_G6.1.1 Appendix 6-1A C23.3_142064-DC-GA-C-111A Drainage Construction Details.pdf21 Jul 2017View
S73_G6.1.2 Appendix 6-1B FRA SLR Rivenhall_Stack Height Variation.pdfS73_G6.1.2 Appendix 6-1B FRA SLR Rivenhall_Stack Height Variation.pdf21 Jul 2017View
S73_G6.2 Chapter 6.2 Water Resourses Hydrogeology & Groundwater 2017 - A.2.pdfS73_G6.2 Chapter 6.2 Water Resourses Hydrogeology & Groundwater 2017 - A.2.pdf21 Jul 2017View
S73_G6.2.1 C25.4 Dwg 213033-150 As-Built Borehole Locations.pdfS73_G6.2.1 C25.4 Dwg 213033-150 As-Built Borehole Locations.pdf21 Jul 2017View
S73_G6.2.2 C22.3_142064-DC-GA-C-111A Drainage Construction Details.pdfS73_G6.2.2 C22.3_142064-DC-GA-C-111A Drainage Construction Details.pdf21 Jul 2017View
S73_G6.2.3.1 - Appendix 6-2A emails Honace_ Application ESS-34-15-BTE Land at Rivenhall Airfield-11 Feb 16 at 09.19 &13.59.pdfS73_G6.2.3.1 - Appendix 6-2A emails Honace_ Application ESS-34-15-BTE Land at Rivenhall Airfield-11 Feb 16 at 09.19 &13.59.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.2_213033-SOD-24 Proposed IWMF Groundwater Borehole Monitoring Points.pdfS73_G6.2.3.1 Appendix 6-2A C24.2_213033-SOD-24 Proposed IWMF Groundwater Borehole Monitoring Points.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.3_DWg 6-4 Groundwater Monitoring Points.pdfS73_G6.2.3.1 Appendix 6-2A C24.3_DWg 6-4 Groundwater Monitoring Points.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.4_Dwg 13 GROUNDWATER MONITORING POINTS.pdfS73_G6.2.3.1 Appendix 6-2A C24.4_Dwg 13 GROUNDWATER MONITORING POINTS.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.5_Dwg 213033-150= As-Built Borehole Locations.pdfS73_G6.2.3.1 Appendix 6-2A C24.5_Dwg 213033-150= As-Built Borehole Locations.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.6_Appendix A - Groundwater Monitoring-CC Ground Investigations.pdfS73_G6.2.3.1 Appendix 6-2A C24.6_Appendix A - Groundwater Monitoring-CC Ground Investigations.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.7_Key to Exploratory Logs & Rotary Borehole Logs for BH10, 11 and 19.pdfS73_G6.2.3.1 Appendix 6-2A C24.7_Key to Exploratory Logs & Rotary Borehole Logs for BH10, 11 and 19.pdf21 Jul 2017View
S73_G6.2.3.1 Appendix 6-2A C24.8_142064-DC-GA-C-111A Drainage Construction Details.pdfS73_G6.2.3.1 Appendix 6-2A C24.8_142064-DC-GA-C-111A Drainage Construction Details.pdf21 Jul 2017View
S73_H7 Chapter 7 Ecological Impact & Risk Assessment 2017 -A.2.pdfS73_H7 Chapter 7 Ecological Impact & Risk Assessment 2017 -A.2.pdf21 Jul 2017View
S73_H7.1 Appendix 7D 499.17 IWMF Stacks, Birds and Bats.pdfS73_H7.1 Appendix 7D 499.17 IWMF Stacks, Birds and Bats.pdf21 Jul 2017View
S73_I8 Chapter 8 Landscape Assessment 2017 - A.1.pdfS73_I8 Chapter 8 Landscape Assessment 2017 - A.1.pdf21 Jul 2017View
S73_I8.1 Appendix 8A Addendum Landscape Visual Impact Assessment [Including Appendix B].pdfS73_I8.1 Appendix 8A Addendum Landscape Visual Impact Assessment [Including Appendix B].pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV [FOR PRINTING PURPOSES ONLY].pdfS73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV [FOR PRINTING PURPOSES ONLY].pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV.pdfS73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV.pdfS73_I8.2 Appendix 8A Addendum Appendix A - Drawing 20-01-21 IWMF Stack 10km ZTV.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.2[A]_732.1_02G SL1 Soft Landscape Proposals Sheet 1 of 5.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.2[A]_732.1_02G SL1 Soft Landscape Proposals Sheet 1 of 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.3[A]_732.1_03G SL2 Soft Landscape Proposals Sheet 2 of 5.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.3[A]_732.1_03G SL2 Soft Landscape Proposals Sheet 2 of 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.4[A]_732.1_04G SL3 Soft Landscape Proposals Sheet 3 of 5.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.4[A]_732.1_04G SL3 Soft Landscape Proposals Sheet 3 of 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.5[A]_732.1_05G SL4 Soft Landscape Proposals Sheet 4 of 5.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.5[A]_732.1_05G SL4 Soft Landscape Proposals Sheet 4 of 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.6[A]_732.1_06G SL5 Soft Landscape Proposals Sheet 5 of 5.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.6[A]_732.1_06G SL5 Soft Landscape Proposals Sheet 5 of 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix C C57.7_732.1_09 HDA D2 Standard Tree Pit Detail.pdfS73_I8.2 Appendix 8A Addendum Appendix C C57.7_732.1_09 HDA D2 Standard Tree Pit Detail.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_30C_Viewpoint Woodhouse.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_30C_Viewpoint Woodhouse.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_32C_Viewpoint 1.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_32C_Viewpoint 1.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_34C_Viewpoint 2.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_34C_Viewpoint 2.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_36C_Viewpoint 3.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_36C_Viewpoint 3.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_40C_Viewpoint 4.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_40C_Viewpoint 4.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_40C_Viewpoint 5.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_40C_Viewpoint 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_42C_Viewpoint 6.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_42C_Viewpoint 6.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_44C_Viewpoint 7.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_44C_Viewpoint 7.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_46C_Viewpoint 8.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_46C_Viewpoint 8.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_48B Photomontage Location Points [FOR PRINTING PURPOSES ONLY].pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_48B Photomontage Location Points [FOR PRINTING PURPOSES ONLY].pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_48B Photomontage Location Points.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_48B Photomontage Location Points.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_49E_Kelvedon Viewpoints 9 10 and 11.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_49E_Kelvedon Viewpoints 9 10 and 11.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_52A_Viewpoints 14 15 16.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_52A_Viewpoints 14 15 16.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_52A_Viewpoints 14 15 16.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_52A_Viewpoints 14 15 16.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_53A_Viewpoints 17 18 19.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_53A_Viewpoints 17 18 19.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_54A_Viewpoints 20 21 22.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_54A_Viewpoints 20 21 22.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_55AViewpoints 23 24 25.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_55AViewpoints 23 24 25.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_56A_Viewpoints 26 27 28.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_56A_Viewpoints 26 27 28.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_57A_ Viewpoints 29 30 and 31 Pantlings Lane.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_57A_ Viewpoints 29 30 and 31 Pantlings Lane.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_58B_Viewpoint Woodhouse Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_58B_Viewpoint Woodhouse Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_59_Viewpoint 1 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_59_Viewpoint 1 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_60_Viewpoint 2 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_60_Viewpoint 2 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_61_Viewpoint 3 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_61_Viewpoint 3 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_62_Viewpoint 4 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_62_Viewpoint 4 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_63_Viewpoint 5 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_63_Viewpoint 5 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_64_Viewpoint 6 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_64_Viewpoint 6 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_65_Viewpoint 7 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_65_Viewpoint 7 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix D 732.1_66A_Viewpoint 8 Sunny.pdfS73_I8.2 Appendix 8A Addendum Appendix D 732.1_66A_Viewpoint 8 Sunny.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 1.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 1.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 2.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 2.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 3.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 3.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 4.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 4.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 5.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 6.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 6.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 7.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 1 photomontage no 7.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 1.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 1.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 2.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 2.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 3.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 3.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 4.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 4.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 5.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 5.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 6.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 6.pdf21 Jul 2017View
S73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 7.pdfS73_I8.2 Appendix 8A Addendum Appendix E 07514690074 Year 15 photomontage no 7.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.1_LA01A_Stack_Cladding_GA_A1.pdfS73_I8.3 Appendix 8B C14.1_LA01A_Stack_Cladding_GA_A1.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.2_LA01A_Stack_Cladding_GA_A3.pdfS73_I8.3 Appendix 8B C14.2_LA01A_Stack_Cladding_GA_A3.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.3_LA02A_Cladding_Details_A1.pdfS73_I8.3 Appendix 8B C14.3_LA02A_Cladding_Details_A1.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.4_LA02A_Cladding_Details_A3.pdfS73_I8.3 Appendix 8B C14.4_LA02A_Cladding_Details_A3.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.5_ALUCOBOND reflect data sheet.pdfS73_I8.3 Appendix 8B C14.5_ALUCOBOND reflect data sheet.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.6_ALUCOBOND_Cleaning and Maintenance_new.pdfS73_I8.3 Appendix 8B C14.6_ALUCOBOND_Cleaning and Maintenance_new.pdf21 Jul 2017View
S73_I8.3 Appendix 8B C14.7_Genie SX-180.pdfS73_I8.3 Appendix 8B C14.7_Genie SX-180.pdf21 Jul 2017View
S73_I8.4 Appendix 8C C18.1 Green Roof Statement.pdfS73_I8.4 Appendix 8C C18.1 Green Roof Statement.pdf21 Jul 2017View
S73_I8.4 Appendix 8C C18.2 Sedum Sample Booklet.pdfS73_I8.4 Appendix 8C C18.2 Sedum Sample Booklet.pdf21 Jul 2017View
S73_I8.5 Appendix 8D C15.1 - Cladding Design & Finishes Statement.pdfS73_I8.5 Appendix 8D C15.1 - Cladding Design & Finishes Statement.pdf21 Jul 2017View
S73_I8.5 Appendix 8D C15.2 - Cladding 213033-130B Building Elevations.pdfS73_I8.5 Appendix 8D C15.2 - Cladding 213033-130B Building Elevations.pdf21 Jul 2017View
S73_I8.5 Appendix 8D C15.3 - Colorcoat Prisma UK Colourcard_040313.pdfS73_I8.5 Appendix 8D C15.3 - Colorcoat Prisma UK Colourcard_040313.pdf21 Jul 2017View
S73_I8.5 Appendix 8D C15.4 - Cooks - Titan 1 door data sheet- 2014.pdfS73_I8.5 Appendix 8D C15.4 - Cooks - Titan 1 door data sheet- 2014.pdf21 Jul 2017View
S73_I8.6 Appendix 8E Pell FRischmann LIghting Statement.pdfS73_I8.6 Appendix 8E Pell FRischmann LIghting Statement.pdf21 Jul 2017View
S73_I8.6 Appendix 8F Rivenhall Grid Connection LVA.pdfS73_I8.6 Appendix 8F Rivenhall Grid Connection LVA.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 01.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 01.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 02.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 02.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 03.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 03.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 04.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 04.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 05.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 05.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 06.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 06.pdf21 Jul 2017View
S73_I8.6 Appendix 8F_IWMF HDA CC 07.pdfS73_I8.6 Appendix 8F_IWMF HDA CC 07.pdf21 Jul 2017View
S73_J9 Chapter 9 Cultural Heritage 2017- A.1.pdfS73_J9 Chapter 9 Cultural Heritage 2017- A.1.pdf21 Jul 2017View
S73_J9.1 Appendix 9A C10.1 - Rivenhall IWMF Project Design for Archaeological Monitoring & Recording.pdfS73_J9.1 Appendix 9A C10.1 - Rivenhall IWMF Project Design for Archaeological Monitoring & Recording.pdf21 Jul 2017View
S73_J9.1 Appendix 9A C10.2 - 8293 Fig 2 Archaeological Mitigation Strategy.pdfS73_J9.1 Appendix 9A C10.2 - 8293 Fig 2 Archaeological Mitigation Strategy.pdf21 Jul 2017View
S73_J9.2 Appendix 9B ASE Rivenhall IWMF Watching Brief Recording 2017_v2.pdfS73_J9.2 Appendix 9B ASE Rivenhall IWMF Watching Brief Recording 2017_v2.pdf21 Jul 2017View
S73_J9.3 Appendix 9C C11.1_Condition 11 - T2 Hanger Report.pdfS73_J9.3 Appendix 9C C11.1_Condition 11 - T2 Hanger Report.pdf21 Jul 2017View
S73_J9.4 Appendix 9D_C64.1 ECC Brief for Historic Building Recording_ESS.41.14.BTE Woodhouse Farm Kelvedon.pdfS73_J9.4 Appendix 9D_C64.1 ECC Brief for Historic Building Recording_ESS.41.14.BTE Woodhouse Farm Kelvedon.pdf21 Jul 2017View
S73_J9.4 Appendix 9D_C64.2 Historic Building Recording_8293 - Rivenhall IWMF - Woodhouse Farm HBR WSI.pdfS73_J9.4 Appendix 9D_C64.2 Historic Building Recording_8293 - Rivenhall IWMF - Woodhouse Farm HBR WSI.pdf21 Jul 2017View
S73_J9.4 Appendix 9D_C64.3 Building Locations Map 8293 WSI Fig 2 BR.pdfS73_J9.4 Appendix 9D_C64.3 Building Locations Map 8293 WSI Fig 2 BR.pdf21 Jul 2017View
S73_J9.5 Appendix 9E-1 Braintree District Council - LBC Validation Letter.pdfS73_J9.5 Appendix 9E-1 Braintree District Council - LBC Validation Letter.pdf21 Jul 2017View
S73_J9.5 Appendix 9E-1 Woodhouse Farm Heritage Statement - Part 1 of 2.pdfS73_J9.5 Appendix 9E-1 Woodhouse Farm Heritage Statement - Part 1 of 2.pdf21 Jul 2017View
S73_J9.5 Appendix 9E-1 Woodhouse Farm Heritage Statement - Part 2 of 2.pdfS73_J9.5 Appendix 9E-1 Woodhouse Farm Heritage Statement - Part 2 of 2.pdf21 Jul 2017View
S73_J9.5 Appendix 9E-2_Woodhouse Farm Bakehouse Assessment & Strategy Repairs-2017-01-03.pdfS73_J9.5 Appendix 9E-2_Woodhouse Farm Bakehouse Assessment & Strategy Repairs-2017-01-03.pdf21 Jul 2017View
S73_J9.6 Appendix 9F - 20-01-22 IWMF Stack 3km ZTV 35m and 58m.pdfS73_J9.6 Appendix 9F - 20-01-22 IWMF Stack 3km ZTV 35m and 58m.pdf21 Jul 2017View
S73_J9.6 Appendix 9G-1 Heritage Statement.pdfS73_J9.6 Appendix 9G-1 Heritage Statement.pdf21 Jul 2017View
S73_J9.6 Appendix 9G-2 Heritage Statement - Appendices.pdfS73_J9.6 Appendix 9G-2 Heritage Statement - Appendices.pdf21 Jul 2017View
S73_J9.6 Appendix 9G-3 Heritage Statement - Illustrations.pdfS73_J9.6 Appendix 9G-3 Heritage Statement - Illustrations.pdf21 Jul 2017View
S73_K10 Chapter 10 Transport Assessment 2017 - A.1.pdfS73_K10 Chapter 10 Transport Assessment 2017 - A.1.pdf21 Jul 2017View
S73_K10.1 Appendix 10A Intermodal Transport Statement ES 2015.pdfS73_K10.1 Appendix 10A Intermodal Transport Statement ES 2015.pdf21 Jul 2017View
S73_K10.1 Appendix 10A Intermodal Transport Statement ES 2017.pdfS73_K10.1 Appendix 10A Intermodal Transport Statement ES 2017.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C6.8_IT569_PAA_08 Drainage.pdfS73_K10.2 Appendix 10B C6.8_IT569_PAA_08 Drainage.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C6.9_IT569_PAA_09.pdfS73_K10.2 Appendix 10B C6.9_IT569_PAA_09.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C62.1_Footpath Crossing Typical Detail IT569_S278_01_Rev_F.pdfS73_K10.2 Appendix 10B C62.1_Footpath Crossing Typical Detail IT569_S278_01_Rev_F.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C62.2 Vole & Otter Crossing_IT569_S278_02Rev_C.pdfS73_K10.2 Appendix 10B C62.2 Vole & Otter Crossing_IT569_S278_02Rev_C.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C63.1 Church Rd Junction IT569_S278_03Rev_C.pdfS73_K10.2 Appendix 10B C63.1 Church Rd Junction IT569_S278_03Rev_C.pdf21 Jul 2017View
S73_K10.2 Appendix 10B C63.2 Ash Lane Junction IT569_S278_04RevC.pdfS73_K10.2 Appendix 10B C63.2 Ash Lane Junction IT569_S278_04RevC.pdf21 Jul 2017View
S73_L11&15 Chapters 11 & 15 AQIA & HHRA 2017 - A.1.pdfS73_L11&15 Chapters 11 & 15 AQIA & HHRA 2017 - A.1.pdf21 Jul 2017View
S73_L11&15.1 Appendix 11A S1552-0700-0014RSF Significance of Air Quality Effects_v5.pdfS73_L11&15.1 Appendix 11A S1552-0700-0014RSF Significance of Air Quality Effects_v5.pdf21 Jul 2017View
S73_L11&15.1 Appendix 11B S1552-0700-0011RSF Dispersion Modelling Assessessment_v8.pdfS73_L11&15.1 Appendix 11B S1552-0700-0011RSF Dispersion Modelling Assessessment_v8.pdf21 Jul 2017View
S73_L11&15.1 Appendix 11C S1552-0700-0010RSF Human Health Risk Assessment_v8.pdfS73_L11&15.1 Appendix 11C S1552-0700-0010RSF Human Health Risk Assessment_v8.pdf21 Jul 2017View
S73_L11&15.1 Appendix 11D S1552-0700-0008RSF CHP Management Plan for Plume Abatement_v10.pdfS73_L11&15.1 Appendix 11D S1552-0700-0008RSF CHP Management Plan for Plume Abatement_v10.pdf21 Jul 2017View
S73_L11&15.1 Appendix 11E S1552-0700-0013RSF Plume Visibility Analysis_v8.pdfS73_L11&15.1 Appendix 11E S1552-0700-0013RSF Plume Visibility Analysis_v8.pdf21 Jul 2017View
S73_M12 Chapter 12 Noise 2017 - A.1.pdfS73_M12 Chapter 12 Noise 2017 - A.1.pdf21 Jul 2017View
S73_M12.1 Appendix 12A Noise Assessment [Environmental Permit] 2017.pdfS73_M12.1 Appendix 12A Noise Assessment [Environmental Permit] 2017.pdf21 Jul 2017View
S73_M12.2 Appendix 12B Noise Assessment Addendum 2015.pdfS73_M12.2 Appendix 12B Noise Assessment Addendum 2015.pdf21 Jul 2017View
S73_N13 Chapter 13 Social and Community Issues 2017 - A.1.pdfS73_N13 Chapter 13 Social and Community Issues 2017 - A.1.pdf21 Jul 2017View
S73_O14 Chapter 14 Nuisances 2017 - A.1.pdfS73_O14 Chapter 14 Nuisances 2017 - A.1.pdf21 Jul 2017View
S73_O14.1 Appendix 14A C51a.1 Dust Minimisation Scheme Statement.pdfS73_O14.1 Appendix 14A C51a.1 Dust Minimisation Scheme Statement.pdf21 Jul 2017View
S73_O14.1 Appendix 14A C51a.2 Construction Information Sheet No 36 (Revision 2).pdfS73_O14.1 Appendix 14A C51a.2 Construction Information Sheet No 36 (Revision 2).pdf21 Jul 2017View
S73_O14.2 Appendix 14B C52a.1 Odour Minimisation Scheme Statement.pdfS73_O14.2 Appendix 14B C52a.1 Odour Minimisation Scheme Statement.pdf21 Jul 2017View
S73_O14.3 Appendix 14C S1552-0720-0005TMK Rivenhall IWMF Odour Management v6.pdfS73_O14.3 Appendix 14C S1552-0720-0005TMK Rivenhall IWMF Odour Management v6.pdf21 Jul 2017View
S73_O14.4 Appendix 14D S1552-0730-0002EH Pest Management Plan v3 Final.pdfS73_O14.4 Appendix 14D S1552-0730-0002EH Pest Management Plan v3 Final.pdf21 Jul 2017View
S73_O14.5 Appendix 14E C43.1_Construction Lighting.pdfS73_O14.5 Appendix 14E C43.1_Construction Lighting.pdf21 Jul 2017View
S73_O14.5 Appendix 14E C43.2_Lighting scheme_P18536R2a.pdfS73_O14.5 Appendix 14E C43.2_Lighting scheme_P18536R2a.pdf21 Jul 2017View
S73_O14.5 Appendix 14E C43.3_Hilclare Rio_Data Sheet.pdfS73_O14.5 Appendix 14E C43.3_Hilclare Rio_Data Sheet.pdf21 Jul 2017View
S73_O14.5 Appendix 14E C43.4_Hilclare Amigo_Data Sheet.pdfS73_O14.5 Appendix 14E C43.4_Hilclare Amigo_Data Sheet.pdf21 Jul 2017View
S73_O14.6 Appendix 14F Pell Frischmann LIghting Statement.pdfS73_O14.6 Appendix 14F Pell Frischmann LIghting Statement.pdf21 Jul 2017View
S73_0 Electronic File List A.3.pdfS73_0 Electronic File List A.3.pdf21 Jul 2017View
S73_A Non-Technical Summary 2017 - A.2.pdfS73_A Non-Technical Summary 2017 - A.2.pdf21 Jul 2017View
EIA Scoping Opinion Decision - ESS/24/17/BTE/SPOEIA Scoping Opinion Decision - ESS/24/17/BTE/SPO21 Jul 2017View
EIA Screening Opinion Decision - ESS/24/17/BTE/SOEIA Screening Opinion Decision - ESS/24/17/BTE/SO21 Jul 2017View
732.1_38C_Viewpoint 4.pdf732.1_38C_Viewpoint 4.pdf12 Feb 2018View
732.1_40C_Viewpoint 5.pdf732.1_40C_Viewpoint 5.pdf12 Feb 2018View
732.1_42C_Viewpoint 6.pdf732.1_42C_Viewpoint 6.pdf12 Feb 2018View
732.1_44C_Viewpoint 7.pdf732.1_44C_Viewpoint 7.pdf12 Feb 2018View
732.1_46C_Viewpoint 8.pdf732.1_46C_Viewpoint 8.pdf12 Feb 2018View
732.1_49E_Kelvedon VP 9 10 and 11.pdf732.1_49E_Kelvedon VP 9 10 and 11.pdf12 Feb 2018View
732.1_50E_Kelvedon VP 12a 12b and 13.pdf732.1_50E_Kelvedon VP 12a 12b and 13.pdf12 Feb 2018View
732.1_52A_VP 14 15 16.pdf732.1_52A_VP 14 15 16.pdf12 Feb 2018View
732.1_53A_VP 17 18 19.pdf732.1_53A_VP 17 18 19.pdf12 Feb 2018View
732.1_54A_VP 20 21 22.pdf732.1_54A_VP 20 21 22.pdf12 Feb 2018View
732.1_55A_VP 23 24 25.pdf732.1_55A_VP 23 24 25.pdf12 Feb 2018View
732.1_56A_VP 26 27 28.pdf732.1_56A_VP 26 27 28.pdf12 Feb 2018View
732.1_57A_ VP 29 30 31 Pantlings Lane.pdf732.1_57A_ VP 29 30 31 Pantlings Lane.pdf12 Feb 2018View
732.1_58B_VP Woodhouse Sunny.pdf732.1_58B_VP Woodhouse Sunny.pdf12 Feb 2018View
732.1_59_VP 1 Sunny.pdf732.1_59_VP 1 Sunny.pdf12 Feb 2018View
732.1_60_VP 2 Sunny.pdf732.1_60_VP 2 Sunny.pdf12 Feb 2018View
732.1_61_VP 3 Sunny.pdf732.1_61_VP 3 Sunny.pdf12 Feb 2018View
732.1_62_VP 4 Sunny.pdf732.1_62_VP 4 Sunny.pdf12 Feb 2018View
732.1_63_VP 5 Sunny.pdf732.1_63_VP 5 Sunny.pdf12 Feb 2018View
732.1_64_VP 6 Sunny.pdf732.1_64_VP 6 Sunny.pdf12 Feb 2018View
732.1_65_VP 7 Sunny.pdf732.1_65_VP 7 Sunny.pdf12 Feb 2018View
732.1_66A_VP 8 Sunny.pdf732.1_66A_VP 8 Sunny.pdf12 Feb 2018View
732.1_67A Receptors and Photomontage Locations_s.pdf732.1_67A Receptors and Photomontage Locations_s.pdf12 Feb 2018View
732.1_68A Viewpoint Woodhouse comparison.pdf732.1_68A Viewpoint Woodhouse comparison.pdf12 Feb 2018View
732.1_69 Viewpoint 1 comparison.pdf732.1_69 Viewpoint 1 comparison.pdf12 Feb 2018View
732.1_70 Viewpoint 2 comparison.pdf732.1_70 Viewpoint 2 comparison.pdf12 Feb 2018View
732.1_71 Viewpoint 3 comparison.pdf732.1_71 Viewpoint 3 comparison.pdf12 Feb 2018View
732.1_72 Viewpoint 4 comparison.pdf732.1_72 Viewpoint 4 comparison.pdf12 Feb 2018View
732.1_73 Viewpoint 5 comparison.pdf732.1_73 Viewpoint 5 comparison.pdf12 Feb 2018View
732.1_74 Viewpoint 6 comparison.pdf732.1_74 Viewpoint 6 comparison.pdf12 Feb 2018View
732.1_75 Viewpoint 7 comparison.pdf732.1_75 Viewpoint 7 comparison.pdf12 Feb 2018View
732.1_76 Viewpoint 8 comparison.pdf732.1_76 Viewpoint 8 comparison.pdf12 Feb 2018View
732.1_77 Viewpoint 9 comparison.pdf732.1_77 Viewpoint 9 comparison.pdf12 Feb 2018View
732.1_78 Viewpoint 10 comparison.pdf732.1_78 Viewpoint 10 comparison.pdf12 Feb 2018View
732.1_79 Viewpoint 12a comparison.pdf732.1_79 Viewpoint 12a comparison.pdf12 Feb 2018View
732.1_80 Viewpoint 13 comparison.pdf732.1_80 Viewpoint 13 comparison.pdf12 Feb 2018View
732.1_81 Viewpoint 14 comparison.pdf732.1_81 Viewpoint 14 comparison.pdf12 Feb 2018View
732.1_82 Viewpoint 17 comparison.pdf732.1_82 Viewpoint 17 comparison.pdf12 Feb 2018View
732.1_83 Viewpoint 20 comparison.pdf732.1_83 Viewpoint 20 comparison.pdf12 Feb 2018View
732.1_84 Viewpoint 21 comparison.pdf732.1_84 Viewpoint 21 comparison.pdf12 Feb 2018View
732.1_85 Viewpoint 23 comparison.pdf732.1_85 Viewpoint 23 comparison.pdf12 Feb 2018View
732.1_86 Viewpoint 27 comparison.pdf732.1_86 Viewpoint 27 comparison.pdf12 Feb 2018View
732.1_87 Viewpoint 28 comparison.pdf732.1_87 Viewpoint 28 comparison.pdf12 Feb 2018View
732.1_88 Viewpoint 30 comparison.pdf732.1_88 Viewpoint 30 comparison.pdf12 Feb 2018View
732.1_89 Viewpoint 31 comparison.pdf732.1_89 Viewpoint 31 comparison.pdf12 Feb 2018View
732.1_90 Woodhouse Sunny comparison.pdf732.1_90 Woodhouse Sunny comparison.pdf12 Feb 2018View
732.1_91 Viewpoint 1 Sunny comparison.pdf732.1_91 Viewpoint 1 Sunny comparison.pdf12 Feb 2018View
732.1_92 Viewpoint 2 Sunny comparison.pdf732.1_92 Viewpoint 2 Sunny comparison.pdf12 Feb 2018View
732.1_93 Viewpoint 3 Sunny comparison.pdf732.1_93 Viewpoint 3 Sunny comparison.pdf12 Feb 2018View
732.1_94 Viewpoint 4 Sunny comparison.pdf732.1_94 Viewpoint 4 Sunny comparison.pdf12 Feb 2018View
732.1_95 Viewpoint 5 sunny day (vers 2).pdf732.1_95 Viewpoint 5 sunny day (vers 2).pdf12 Feb 2018View
732.1_96 Viewpoint 6 Sunny comparison.pdf732.1_96 Viewpoint 6 Sunny comparison.pdf12 Feb 2018View
732.1_97 Viewpoint 7 Sunny comparison.pdf732.1_97 Viewpoint 7 Sunny comparison.pdf12 Feb 2018View
732.1_98 Viewpoint 8 Sunny comparison.pdf732.1_98 Viewpoint 8 Sunny comparison.pdf12 Feb 2018View
732.1_99 Viewpoints 32 33 34.pdf732.1_99 Viewpoints 32 33 34.pdf12 Feb 2018View
732.1_100 Viewpoints 35 36 37.pdf732.1_100 Viewpoints 35 36 37.pdf12 Feb 2018View
732.1_101 Viewpoint 38 39 40.pdf732.1_101 Viewpoint 38 39 40.pdf12 Feb 2018View
9133A- Solar Glint and Glare Study [Final 2018-01-05].pdf9133A- Solar Glint and Glare Study [Final 2018-01-05].pdf12 Feb 2018View
Rivenhall Add'm LVA App A Dwg 20-01-21 IWMF Stack 10km ZTV.PDFRivenhall Add'm LVA App A Dwg 20-01-21 IWMF Stack 10km ZTV.PDF12 Feb 2018View
Rivenhall Add'm LVA App A Dwg 20-01-22 IWMF Stack 3km ZTV.PDFRivenhall Add'm LVA App A Dwg 20-01-22 IWMF Stack 3km ZTV.PDF12 Feb 2018View
Rivenhall Add'm LVA App B1 v1 reflective clad egs.pdfRivenhall Add'm LVA App B1 v1 reflective clad egs.pdf12 Feb 2018View
Rivenhall Add'm LVA App B2 Examples of Other Stacks.pdfRivenhall Add'm LVA App B2 Examples of Other Stacks.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_02G HDA SL1 Planting 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_02G HDA SL1 Planting 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_03G HDA SL2 Planting 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_03G HDA SL2 Planting 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_04G HDA SL3 Planting 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_04G HDA SL3 Planting 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_05G HDA SL4 Planting 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_05G HDA SL4 Planting 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_06G HDA SL5 Planting 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_06G HDA SL5 Planting 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_07B HDA SA1 Site Access 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_07B HDA SA1 Site Access 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_08A HDA D1 Rabbit Prf Fence 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_08A HDA D1 Rabbit Prf Fence 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_09 HDA D2 Tree Pit 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_09 HDA D2 Tree Pit 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App C 732.1_10A HDA D3 Tree Prot Fence 2018 01 22.pdfRivenhall Add'm LVA App C 732.1_10A HDA D3 Tree Prot Fence 2018 01 22.pdf12 Feb 2018View
Rivenhall Add'm LVA App E 732.1 102 Silver End Conservation area_s.pdfRivenhall Add'm LVA App E 732.1 102 Silver End Conservation area_s.pdf12 Feb 2018View
Rivenhall Add'm LVA App E 732.1 103 Coggeshall Conservation Area_s.pdfRivenhall Add'm LVA App E 732.1 103 Coggeshall Conservation Area_s.pdf12 Feb 2018View
Rivenhall Add'm LVA App F Aug 2008 ES montages.pdfRivenhall Add'm LVA App F Aug 2008 ES montages.pdf12 Feb 2018View
Rivenhall Add'm LVA App G HDA Photomontage Methodology.pdfRivenhall Add'm LVA App G HDA Photomontage Methodology.pdf12 Feb 2018View
Rivenhall Add'm LVA App H LBC Decision Notice Braintree District Council.pdfRivenhall Add'm LVA App H LBC Decision Notice Braintree District Council.pdf12 Feb 2018View
732.1 01 Rivenhall Revised LVIA Stack Height Addendum.pdf732.1 01 Rivenhall Revised LVIA Stack Height Addendum.pdf12 Feb 2018View
732.1 48D Photo Location Points.pdf732.1 48D Photo Location Points.pdf12 Feb 2018View
732.1_30C_Viewpoint Woodhouse.pdf732.1_30C_Viewpoint Woodhouse.pdf12 Feb 2018View
732.1_32C_Viewpoint 1.pdf732.1_32C_Viewpoint 1.pdf12 Feb 2018View
732.1_34C_Viewpoint 2.pdf732.1_34C_Viewpoint 2.pdf12 Feb 2018View
732.1_36C_Viewpoint 3.pdf732.1_36C_Viewpoint 3.pdf12 Feb 2018View
S1552-0700-0022SMO Stack Height and ThrouhputS1552-0700-0022SMO Stack Height and Throuhput7 Mar 2018View
Update on the Need for the IWMF 2018-03-06Update on the Need for the IWMF 2018-03-067 Mar 2018View
Oct 2018 Applicant response to PAIN (Parsihes Aginsist INcineration) ReportOct 2018 Applicant response to PAIN (Parsihes Aginsist INcineration) Report26 Oct 2018View
Oct 2018 Agent LetterOct 2018 Agent Letter29 Oct 2018View
Oct 2018 Applicant response to Landscape Partnership ReportOct 2018 Applicant response to Landscape Partnership Report29 Oct 2018View
Oct 2018 Applicant response to Essex Waste Need Assessment ReviewOct 2018 Applicant response to Essex Waste Need Assessment Review1 Nov 2018View
Additional Information - Site NoticeAdditional Information - Site Notice8 Nov 2018View
Additional Information - EA ChecklistAdditional Information - EA Checklist8 Nov 2018View
26 Feb 2019 IWMF Clarifications & Additional Information 2019-02 A.026 Feb 2019 IWMF Clarifications & Additional Information 2019-02 A.01 Mar 2019View
28 Feb 2019 BPP Consulting on behalf od ECC Rivenhall - Critical Review of Additional Information28 Feb 2019 BPP Consulting on behalf od ECC Rivenhall - Critical Review of Additional Information1 Mar 2019View
26 Feb 2019 Drawing DW2019-361 IWMF Site Survey26 Feb 2019 Drawing DW2019-361 IWMF Site Survey1 Mar 2019View
26 Feb 2019 Drawing DW2019-172-1 Bradwell Quarry Survey26 Feb 2019 Drawing DW2019-172-1 Bradwell Quarry Survey1 Mar 2019View
26 Feb 2019 Drawing A5-9 Higher Level Restoration Profile K26 Feb 2019 Drawing A5-9 Higher Level Restoration Profile K1 Mar 2019View
Appendix 1 – Part 1 of 4 - Applicant’s Exhibition BoardsAppendix 1 – Part 1 of 4 - Applicant’s Exhibition Boards4 Mar 2019View
Appendix 1 – Part 2 of 4 - Applicant’s Exhibition BoardsAppendix 1 – Part 2 of 4 - Applicant’s Exhibition Boards4 Mar 2019View
Appendix 1 – Part 3 of 4 - Applicant’s Exhibition BoardsAppendix 1 – Part 3 of 4 - Applicant’s Exhibition Boards4 Mar 2019View
Appendix 1 – Part 4 of 4 Applicants/Indaver Slide PresentationAppendix 1 – Part 4 of 4 Applicants/Indaver Slide Presentation4 Mar 2019View
Holmes & Hills LetterHolmes & Hills Letter27 Mar 2019View
05/04/19 letter from Holmes & Hill05/04/19 letter from Holmes & Hill15 Apr 2019View
Residual Waste in London & South East - Essex DataResidual Waste in London & South East - Essex Data15 Apr 2019View
Tolvik Full Report 2018 - Residual Waste in London & South EastTolvik Full Report 2018 - Residual Waste in London & South East15 Apr 2019View
15/04/19 letter from Herbert Smith Freehills LLP15/04/19 letter from Herbert Smith Freehills LLP16 Apr 2019View
15/04/19 Marks Hall Arboretum Assessment15/04/19 Marks Hall Arboretum Assessment16 Apr 2019View
Indaver 24/04/19 IWMF Electromagnetic Field Radiation StudyIndaver 24/04/19 IWMF Electromagnetic Field Radiation Study25 Apr 2019View
Marks Hall Air Quality AssessmentMarks Hall Air Quality Assessment15 Apr 2019View
Site NoticeSite Notice21 Jul 2017View
Site NoticeSite Notice23 Apr 2019View
Natural England 10th August 2017 response to consultationNatural England 10th August 2017 response to consultation10 Aug 2017View
Historic England 16/08/17 response to consultationHistoric England 16/08/17 response to consultation17 Aug 2017View
Noise, AQ and Lighting Response_220817Noise, AQ and Lighting Response_22081723 Aug 2017View
EA ResponseEA Response30 Aug 2017View
Coggeshall Parish CouncilCoggeshall Parish Council1 Sept 2017View
Strategic DevelopmentStrategic Development4 Sept 2017View
Braintree District ResponseBraintree District Response5 Sept 2017View
Cressing Parish ResponseCressing Parish Response19 Sept 2017View
Kelvedon Parish ResponseKelvedon Parish Response26 Feb 2018View
Riven Hall ParishRiven Hall Parish7 Mar 2018View
PAIN Report - April 2018PAIN Report - April 20186 Nov 2018View
Natural England ResponseNatural England Response20 Nov 2018View
Historic England ResponseHistoric England Response21 Nov 2018View
Highways EnglandHighways England3 Dec 2018View
Place Services ResponsePlace Services Response7 Jan 2019View
Coggeshall Parish ResponseCoggeshall Parish Response8 Jan 2019View
Braintree District CouncilBraintree District Council2 Apr 2019View
Braintree District Council 25/04/19 response to consultationBraintree District Council 25/04/19 response to consultation26 Apr 2019View
Natural England ResponseNatural England Response29 Apr 2019View
Feering Parish ResponseFeering Parish Response3 May 2019View
Highways EnglandHighways England7 May 2019View
Jacobs air qualityJacobs air quality8 May 2019View
Historic England ResponseHistoric England Response8 May 2019View
Jacobs ResponseJacobs Response10 May 2019View
Highways Strategic Development 17/05/19 consultation responseHighways Strategic Development 17/05/19 consultation response17 May 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refused
Decision Notice S73_B Appendix PASS A-1_ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdf S73_B Appendix PASS A-3_ESS3415BTE11 - Decision Letter_ECC 14 March 2016 - Implementation.pdf S73_C2.1 Appendix 2A ESS3415BTE - Decision Letter_ECC 26 Feb 2016.pdf S73_C2.3 Appendix 2A Decision Letter_ECC 14 March 2016 - Implementation.pdf EIA Scoping Opinion Decision - ESS/24/17/BTE/SPO EIA Screening Opinion Decision - ESS/24/17/BTE/SO Rivenhall Add'm LVA App H LBC Decision Notice Braintree District Council.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.