ApprovedCouncil status: Decision Made

to allow amended wording of condition 2 (applications details) Original Planning permission for: Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.

Rivenhall Airfield Recycling & Composting Facility, Silver End, Braintree, CO5 9DF

Essex County CouncilReference ESS/37/08/BTE/NMA/2Non Material Amendment

Last published check: 2 Nov 2026, 14:03. Check the council record for more recent changes.

Status and dates

Last published check: 2 Nov 2026, 14:03 (UK)

  1. DoneReceived6 Sept 2012
  2. DoneValidated18 Sept 2012
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted25 Oct 2012

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
Application type
Non Material Amendment
Documents
4 published

Proposal

to allow amended wording of condition 2 (applications details) Original Planning permission for: Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.

Reference
ESS/37/08/BTE/NMA/2
Agent
Mr Kevin Toogood

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision LetterDecision Letter18 Aug 2014View
  • Officer ReportOfficer Report18 Aug 2014View
  • Application form & supporting letterApplication form & supporting letter18 Mar 2015View
  • Email 18 September 2012Email 18 September 201218 Mar 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.