ApprovedCouncil status: Decision Made

Notification in accordance with condition 55 (works in bird nesting season) of ESS/34/15/BTE regarding demolition works at airfield gas training building. ESS/34/15/BTE was for the following “Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing – temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping – bunding & planting), 59 (trees, shrubs and hedgerows – retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points – lining and signing)”

Rivenhall Airfield Coggeshall Road (A120) Braintree CO5 9DF

Essex County CouncilReference ESS/34/15/BTE/55/02Submission of Details CC/ESS

Last published check: 29 Oct 2026, 03:05. Check the council record for more recent changes.

Status and dates

Last published check: 29 Oct 2026, 03:05 (UK)

  1. DoneReceived3 Mar 2022
  2. DoneValidated3 Mar 2022
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted8 Jul 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of Details CC/ESS
Documents
4 published

Proposal

Notification in accordance with condition 55 (works in bird nesting season) of ESS/34/15/BTE regarding demolition works at airfield gas training building. ESS/34/15/BTE was for the following “Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing – temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping – bunding & planting), 59 (trees, shrubs and hedgerows – retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points – lining and signing)”

Reference
ESS/34/15/BTE/55/02
Agent
Mr Jon Brier

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ReportReport8 Jul 2022View
  • Decision LetterDecision Letter8 Jul 2022View
  • Decision Notice - ESS/34/15/BTEDecision Notice - ESS/34/15/BTE23 Dec 2021View
  • Rivenhall IWMF - Condition 55 EmailRivenhall IWMF - Condition 55 Email8 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Letter Decision Notice - ESS/34/15/BTE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.