Council planning record

Details pursuant to condition 25 (Clearence of contaminated materials) of ESS/34/15/BTE. ESS/34/15BTE for Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing - temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping - bunding & planting), 59 (trees, shrubs and hedgerows - retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points - lining and signing)

Woodhouse Farm, Woodhouse Lane, KELVEDON, CO5 9DF

Decision MadeReference: ESS/34/15/BTE/25/1Essex County Council

Last published check: 29 Sept 2026, 20:08. Check the council record for more recent changes.

Application location

Woodhouse Farm, Woodhouse Lane, KELVEDON, CO5 9DF

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
21 Dec 2016
Validated
23 Dec 2016
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Details pursuant to condition 25 (Clearence of contaminated materials) of ESS/34/15/BTE. ESS/34/15BTE for Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing - temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping - bunding & planting), 59 (trees, shrubs and hedgerows - retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points - lining and signing)

Proposal details

Reference
ESS/34/15/BTE/25/1
Agent
Steven Smith

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
Without Personal DataWithout Personal Data16 May 2017View
How the fee was calculatedHow the fee was calculated16 May 2017View
A summary of the attachments in the proposalA summary of the attachments in the proposal16 May 2017View
User Defined AttachmentUser Defined Attachment16 May 2017View
EA ChecklistEA Checklist16 May 2017View
Condition ReportCondition Report22 May 2017View
Decision LetterDecision Letter22 May 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.