ApprovedCouncil status: Decision Made

Details pursuant to condition 10 (Archaeological recording) of ESS/34/15/BTE. ESS/34/15/BTE was for "Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing - temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping - bunding & planting), 59 (trees, shrubs and hedgerows - retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points - lining and signing"

Rivenhall Airfield Coggeshall Road (A120) Braintree CO5 9DF

Essex County CouncilReference ESS/34/15/BTE/10/1Submission of Details CC/ESS

Last published check: 29 Oct 2026, 04:04. Check the council record for more recent changes.

Status and dates

Last published check: 29 Oct 2026, 04:04 (UK)

  1. DoneReceived10 Aug 2021
  2. DoneValidated10 Aug 2021
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted22 Jun 2022

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Consultation Start

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of Details CC/ESS
Documents
15 published

Proposal

Details pursuant to condition 10 (Archaeological recording) of ESS/34/15/BTE. ESS/34/15/BTE was for "Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of the Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24, (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing - temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping - bunding & planting), 59 (trees, shrubs and hedgerows - retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points - lining and signing"

Reference
ESS/34/15/BTE/10/1
Agent
Mr Jon Brier

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Agent DecisionAgent Decision22 Jun 2022View
  • SOD Report ApprovalSOD Report Approval22 Jun 2022View
  • Application Form - Without Personal DataApplication Form - Without Personal Data10 Aug 2021View
  • A summary of the attachments in the proposalA summary of the attachments in the proposal10 Aug 2021View
  • Decision Notice ESS/34/15/BTEDecision Notice ESS/34/15/BTE2 Sept 2021View
  • Covering LetterCovering Letter2 Sept 2021View
  • Archaeological Monitoring & Recording ASE rep 2017059 Rivenhall IWMF WB_v2Archaeological Monitoring & Recording ASE rep 2017059 Rivenhall IWMF WB_v22 Sept 2021View
  • Site Plan - Area of investigation (other areas having been previously investigated as part of prioir mineral workings)Site Plan - Area of investigation (other areas having been previously investigated as part of prioir mineral workings)10 Aug 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Agent Decision Decision Notice ESS/34/15/BTE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.