Council planning record

Continuation of excavation of sand and restoration of land to agricultural use, including deposit of inert waste permitted by planning permission ref ESS/44/08/UTT without compliance with: • condition 3 (cessation dates for development and restoration) to allow extended period for development until 31 December 2025 and restoration by 31 December 2026 (an additional 12 years); • condition 4 (removal of infrastructure) to allow retention of infrastructure until 30 June 2026; • condition 17 (soil movement) to allow soil movements between March and October; and • condition 28 (traffic movements) to remove the limitation of no more than an average of 50 lorry movements (25 in, 25 out) in any one day. (NB The timescales have been revised by condition. Cessation required by 30 April 2022 with restoration by 30 September 2023)

Widdington Pit, Hollow Road, Widdington, CB11 3SL

Decision MadeReference: ESS/34/13/UTT/11/1Essex County Council

Last published check: 30 Sept 2026, 18:48. Check the council record for more recent changes.

Application location

Widdington Pit, Hollow Road, Widdington, CB11 3SL

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
11 Jul 2014
Validated
11 Jul 2014
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Continuation of excavation of sand and restoration of land to agricultural use, including deposit of inert waste permitted by planning permission ref ESS/44/08/UTT without compliance with: • condition 3 (cessation dates for development and restoration) to allow extended period for development until 31 December 2025 and restoration by 31 December 2026 (an additional 12 years); • condition 4 (removal of infrastructure) to allow retention of infrastructure until 30 June 2026; • condition 17 (soil movement) to allow soil movements between March and October; and • condition 28 (traffic movements) to remove the limitation of no more than an average of 50 lorry movements (25 in, 25 out) in any one day. (NB The timescales have been revised by condition. Cessation required by 30 April 2022 with restoration by 30 September 2023)

Proposal details

Reference
ESS/34/13/UTT/11/1
Agent
Miss Georgina Leach

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 3 of 3

DocumentPublishedAction
Decision LetterDecision Letter22 Jul 2014View
Noise Monitoring Report (Redacted)Noise Monitoring Report (Redacted)17 Nov 2014View
Application Form (Redacted)Application Form (Redacted)17 Nov 2014View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.