Council planning record

Continuation of development permitted by ESS/12/20/BTE without compliance with conditions 2, 12, 17, 32, 33, 39, 47, 53, 60 and 62 to allow changes to: the internal haul road; contractors’ compound; water and silt management; areas of biodiversity; and restoration and aftercare schemes. ESS/12/20/BTE was planning permission for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”

Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EP

Resolution made/Awaiting Legal AgreementReference: ESS/31/25/BTEEssex County Council

Last published check: 12 Oct 2026, 20:05. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source

Application summary

Status
Resolution made/Awaiting Legal Agreement
Application type
Removal/Variation of Condition ESS EIA
Received
10 Apr 2025
Validated
23 Apr 2025
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Continuation of development permitted by ESS/12/20/BTE without compliance with conditions 2, 12, 17, 32, 33, 39, 47, 53, 60 and 62 to allow changes to: the internal haul road; contractors’ compound; water and silt management; areas of biodiversity; and restoration and aftercare schemes. ESS/12/20/BTE was planning permission for “Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).”

Proposal details

Reference
ESS/31/25/BTE
Agent
Gareth Wilson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Bradwell Quarry, Church Road, Bradwell, Essex, CM77 8EP

This record has no verified map location.

Documents 169 of 169

DocumentPublishedAction
Committee Report ESS/31/25/BTE April 2026Committee Report ESS/31/25/BTE April 202617 Apr 2026View
Appendix B ESS/31/25/BTEAppendix B ESS/31/25/BTE17 Apr 2026View
Final Addendum April 2026Final Addendum April 202624 Apr 2026View
Committee Minutes April 2026Committee Minutes April 202619 Jun 2026View
D & R Chair agreement for Committee resolution extended to 30 September 2026D & R Chair agreement for Committee resolution extended to 30 September 20261 Jul 2026View
Application FormApplication Form1 May 2025View
ECC Note regarding delay in acknowledgement of representationsECC Note regarding delay in acknowledgement of representations3 Jun 2025View
How the fee was calculatedHow the fee was calculated14 Apr 2025View
Cover LetterCover Letter1 May 2025View
Planning statementPlanning statement2 May 2025View
Haul Road - DR-P-0100-32A revZHaul Road - DR-P-0100-32A revZ14 Apr 2025View
Haul Road with Survey DR-P-0100-032B revRHaul Road with Survey DR-P-0100-032B revR14 Apr 2025View
ES - Non-Technical Summary Part 1ES - Non-Technical Summary Part 11 May 2025View
ES - Non-Technical Summary Part 2ES - Non-Technical Summary Part 214 Apr 2025View
ES- Non-Technical Summary Part 3ES- Non-Technical Summary Part 314 Apr 2025View
ES - Non-Technical Summary Part 4ES - Non-Technical Summary Part 414 Apr 2025View
ES - Vol 1 Main Text and Figure ContentsES - Vol 1 Main Text and Figure Contents2 May 2025View
ES - Chapter 01 IntroductionES - Chapter 01 Introduction14 Apr 2025View
ES - Chapter 02 EIA MethodologyES - Chapter 02 EIA Methodology14 Apr 2025View
ES - Chapter 03 Site and Development DescriptionES - Chapter 03 Site and Development Description2 May 2025View
ES - Chapter 04 AlternativesES - Chapter 04 Alternatives14 Apr 2025View
ES - Chapter 05 ConstructionES - Chapter 05 Construction14 Apr 2025View
ES - Chapter 06 Landscape and Visual EffectsES - Chapter 06 Landscape and Visual Effects14 Apr 2025View
ES - Chapter 07 EcologyES - Chapter 07 Ecology2 May 2025View
ES - Chapter 08 Summary and Residual EffectsES - Chapter 08 Summary and Residual Effects14 Apr 2025View
ES - Figure 1.1 Greenhouse Site Red Line boundaryES - Figure 1.1 Greenhouse Site Red Line boundary14 Apr 2025View
ES - Figure 1.2 Section 73 Site Red Line BoundaryES - Figure 1.2 Section 73 Site Red Line Boundary14 Apr 2025View
ES - Figure 2.1 Cumulative Schemes PlanES - Figure 2.1 Cumulative Schemes Plan14 Apr 2025View
ES - Figure 3.1 Greenhouse Site Location PlanES - Figure 3.1 Greenhouse Site Location Plan14 Apr 2025View
ES - Figure 3.2 Greenhouse Site Context PlanES - Figure 3.2 Greenhouse Site Context Plan14 Apr 2025View
ES - Figure 3.6 Greenhouse Site Layout PlanES - Figure 3.6 Greenhouse Site Layout Plan14 Apr 2025View
ES - Figure 3.7 Silt and Water Management PlanES - Figure 3.7 Silt and Water Management Plan14 Apr 2025View
ES - Figure 3.8 Site Level PlanES - Figure 3.8 Site Level Plan14 Apr 2025View
ES - Figure 3.12 Carbon Capture PlantES - Figure 3.12 Carbon Capture Plant14 Apr 2025View
ES - Figure 3.13 Consented Restoration SchemeES - Figure 3.13 Consented Restoration Scheme14 Apr 2025View
ES - Figure 3.18 PRoW PlanES - Figure 3.18 PRoW Plan14 Apr 2025View
ES - Figure 4.1 Pre App Site Layout PlanES - Figure 4.1 Pre App Site Layout Plan14 Apr 2025View
ES - Figure 5.1 Haul Road Relocation PlanES - Figure 5.1 Haul Road Relocation Plan14 Apr 2025View
ES - Figure 6.1 Site Context PlanES - Figure 6.1 Site Context Plan14 Apr 2025View
ES - Figure 6.2 Topography PlanES - Figure 6.2 Topography Plan14 Apr 2025View
ES - Figure 6.3 Landscape Character PlanES - Figure 6.3 Landscape Character Plan14 Apr 2025View
ES - Figure 6.4 Site Appraisal PlanES - Figure 6.4 Site Appraisal Plan14 Apr 2025View
ES - Figure 6.5 Visual Appraisal PlanES - Figure 6.5 Visual Appraisal Plan14 Apr 2025View
ES - Figure 6.6 Night-time Light Sources PlanES - Figure 6.6 Night-time Light Sources Plan14 Apr 2025View
ES - Figure 6.7 Landscape Strategy Plan DrawingES - Figure 6.7 Landscape Strategy Plan Drawing14 Apr 2025View
ES - Figure 6.8 Cumulative ZTV PlanES - Figure 6.8 Cumulative ZTV Plan14 Apr 2025View
ES - Vol 2 Technical AppendicesES - Vol 2 Technical Appendices2 May 2025View
ES - Appendix 1.1 EIA Screening RequestES - Appendix 1.1 EIA Screening Request14 Apr 2025View
ES - Appendix 1.2 EIA Screening OpinionES - Appendix 1.2 EIA Screening Opinion14 Apr 2025View
ES - Appendix 1.3 Location of Information within the ESES - Appendix 1.3 Location of Information within the ES14 Apr 2025View
ES - Appendix 1.4 Statement of ExpertiseES - Appendix 1.4 Statement of Expertise14 Apr 2025View
ES - Appendix 2.1 EIA Scoping Request Part 1ES - Appendix 2.1 EIA Scoping Request Part 11 May 2025View
ES - Appendix 2.1 EIA Scoping Request Part 2ES - Appendix 2.1 EIA Scoping Request Part 214 Apr 2025View
ES - Appendix 2.2 EIA Scoping OpinionES - Appendix 2.2 EIA Scoping Opinion14 Apr 2025View
ES - Appendix 2.3 Water Resources Technical NoteES - Appendix 2.3 Water Resources Technical Note14 Apr 2025View
ES - Appendix 2.4 Transport EIA Technical NoteES - Appendix 2.4 Transport EIA Technical Note14 Apr 2025View
ES - Appendix 2.5 Noise EIA Technical NoteES - Appendix 2.5 Noise EIA Technical Note2 May 2025View
ES - Appendix 6.1 Planning Policy and Guidance ExtractsES - Appendix 6.1 Planning Policy and Guidance Extracts14 Apr 2025View
ES - Appendix 6.2 Published Evidence ExtractsES - Appendix 6.2 Published Evidence Extracts14 Apr 2025View
ES - Appendix 6.3 LVIA MethodologyES - Appendix 6.3 LVIA Methodology14 Apr 2025View
ES - Appendix 6.4 Site Appraisal Photographs A to OES - Appendix 6.4 Site Appraisal Photographs A to O14 Apr 2025View
ES - Appendix 6.5 Site Context Photographs 1 to 18ES - Appendix 6.5 Site Context Photographs 1 to 1814 Apr 2025View
ES - Appendix 6.6 Assessment of Effects Against Current BaselineES - Appendix 6.6 Assessment of Effects Against Current Baseline14 Apr 2025View
ES - Appendix 6.7 Assessment of Effects Against Future BaselineES - Appendix 6.7 Assessment of Effects Against Future Baseline14 Apr 2025View
ES - Appendix 6.8 Assessment of Cumulative Effects Against Future BaselineES - Appendix 6.8 Assessment of Cumulative Effects Against Future Baseline14 Apr 2025View
ES - Appendix 6.9 Landscape Strategy Plan ReportES - Appendix 6.9 Landscape Strategy Plan Report2 May 2025View
ES - Appendix 6.10 Accurate Visual RepresentationsES - Appendix 6.10 Accurate Visual Representations2 May 2025View
ES - Appendix 7.1 Preliminary Ecological AppraisalES - Appendix 7.1 Preliminary Ecological Appraisal14 Apr 2025View
ES - Appendix 7.2 Protected Species Survey Part 1ES - Appendix 7.2 Protected Species Survey Part 114 Apr 2025View
ES - Appendix 7.2 Protected Species Survey Part 2ES - Appendix 7.2 Protected Species Survey Part 214 Apr 2025View
ES - Appendix 7.3 Habitat Maps Part 1ES - Appendix 7.3 Habitat Maps Part 114 Apr 2025View
ES - Appendix 7.3 Habitat Maps Part 2ES - Appendix 7.3 Habitat Maps Part 214 Apr 2025View
ES - Appendix 7.4 BNG BaselineES - Appendix 7.4 BNG Baseline14 Apr 2025View
ES - Appendix 7.5 BNG Post IntervetionES - Appendix 7.5 BNG Post Intervetion14 Apr 2025View
ES - Appendix 7.6 Barn Preliminary Bat Roost AssessmentES - Appendix 7.6 Barn Preliminary Bat Roost Assessment2 May 2025View
Addendhum Cover LetterAddendhum Cover Letter7 Jan 2026View
MIIA AddendumMIIA Addendum6 Jan 2026View
Acoustic noise barrierAcoustic noise barrier14 Apr 2026View
List of drawings submitted December 2025List of drawings submitted December 20256 Jan 2026View
A7-01 Rev C Application Area and Area in Applicants ControlA7-01 Rev C Application Area and Area in Applicants Control6 Jan 2026View
A7-02 Rev E Existing Quarrying OperationsA7-02 Rev E Existing Quarrying Operations6 Jan 2026View
A7-03 Rev G Existing Site SettingA7-03 Rev G Existing Site Setting6 Jan 2026View
A7-08 Rev G Proposed Haul Road and Crossing DetailsA7-08 Rev G Proposed Haul Road and Crossing Details6 Jan 2026View
A7-09-01 Rev D Site A7 Contractor's CompoundA7-09-01 Rev D Site A7 Contractor's Compound6 Jan 2026View
A7-10B Rev F Phasing and Restoration SequenceA7-10B Rev F Phasing and Restoration Sequence6 Jan 2026View
BW319.24 Site A7 RPA Earth Mound Protection Sectional ElevationBW319.24 Site A7 RPA Earth Mound Protection Sectional Elevation6 Jan 2026View
Email from agent with updated cross-sectionsEmail from agent with updated cross-sections3 Mar 2026View
Location of cross-sections and sections 1, 2 and 3 Drawing No. 108 NoLocation of cross-sections and sections 1, 2 and 3 Drawing No. 108 No27 Feb 2026View
Sections 4 to 7 Drawing no. 109Sections 4 to 7 Drawing no. 10927 Feb 2026View
Location and cross -sections through Site R, A2 and A5 Drawing No. 125Location and cross -sections through Site R, A2 and A5 Drawing No. 12527 Feb 2026View
A7-05 Rev G Public Rights of WayA7-05 Rev G Public Rights of Way12 Mar 2026View
A7-20-01 Rev G 5 Year Aftercare Scheme & Biodiversity ManagementA7-20-01 Rev G 5 Year Aftercare Scheme & Biodiversity Management23 Mar 2026View
A7-07 Rev H Silt and Water ManagementA7-07 Rev H Silt and Water Management15 Apr 2026View
A7-09-03 Rev G Site A7 Haul RoadA7-09-03 Rev G Site A7 Haul Road15 Apr 2026View
A7-13-01 Rev O Restoration Proposals Site Wide MasterplanA7-13-01 Rev O Restoration Proposals Site Wide Masterplan15 Apr 2026View
A7-10A Rev F Phasing and Restoration SequenceA7-10A Rev F Phasing and Restoration Sequence15 Apr 2026View
BW319.25 Earth Mound Protection Plan ViewBW319.25 Earth Mound Protection Plan View15 Apr 2026View
Rivenhall Greenhouses ES Addendum NTS_Part1Rivenhall Greenhouses ES Addendum NTS_Part16 Jan 2026View
Rivenhall Greenhouses ES Addendum NTS_Part2Rivenhall Greenhouses ES Addendum NTS_Part26 Jan 2026View
Rivenhall ES Addendum_Part1Rivenhall ES Addendum_Part16 Jan 2026View
Rivenhall ES Addendum_Part2Rivenhall ES Addendum_Part26 Jan 2026View
Rivenhall ES Addendum_Part3Rivenhall ES Addendum_Part36 Jan 2026View
Rivenhall Greenhouse Braintree - Noise Impact Assessment AddendumRivenhall Greenhouse Braintree - Noise Impact Assessment Addendum6 Jan 2026View
Rivenhall Greenhouse Braintree - Noise Assessment for PlanningRivenhall Greenhouse Braintree - Noise Assessment for Planning6 Jan 2026View
RivenhallGreenhouses-HeritageStatementAddendum-finalRivenhallGreenhouses-HeritageStatementAddendum-final6 Jan 2026View
Mass Balance Report Addendum v1.0Mass Balance Report Addendum v1.06 Jan 2026View
Flood Risk Assessment Addendum v1.0Flood Risk Assessment Addendum v1.06 Jan 2026View
Noise Assessment AddendumNoise Assessment Addendum26 Mar 2026View
A7-01 Rev B LAnd Ownership and Proposed Site PlanA7-01 Rev B LAnd Ownership and Proposed Site Plan14 Apr 2025View
A7-02 Rev E Previously Approved Areas of Extraction with GreenhousesA7-02 Rev E Previously Approved Areas of Extraction with Greenhouses23 Apr 2025View
A7-03 Rev G Existing Site SettingA7-03 Rev G Existing Site Setting23 Apr 2025View
A7-05 Rev E Public Rights of WayA7-05 Rev E Public Rights of Way23 Apr 2025View
A7-07 Rev E Silt and Water ManagementA7-07 Rev E Silt and Water Management14 Apr 2025View
A7-08 Rev F Proposed Haul Road and Crossing DetailsA7-08 Rev F Proposed Haul Road and Crossing Details2 May 2025View
A7-09-01 Rev C Contractors CompoundA7-09-01 Rev C Contractors Compound2 May 2025View
A7-09-03 Rev E Proposed Quarry Haul RoadA7-09-03 Rev E Proposed Quarry Haul Road23 Apr 2025View
A7-10A Rev E Proposed PhasingA7-10A Rev E Proposed Phasing14 Apr 2025View
A7-10B Rev E Proposed PhasingA7-10B Rev E Proposed Phasing14 Apr 2025View
A7-13 -01 Rev L Restoration Proposals - Site Wide MasterplanA7-13 -01 Rev L Restoration Proposals - Site Wide Masterplan14 Apr 2025View
A7-20-01 Rev C 5 Year Aftercare Scheme with IWMFA7-20-01 Rev C 5 Year Aftercare Scheme with IWMF14 Apr 2025View
A7-05 Rev F Public Rights of WayA7-05 Rev F Public Rights of Way6 Jan 2026View
A7-07 Rev F Silt and Water ManagementA7-07 Rev F Silt and Water Management6 Jan 2026View
A7-09-03 Rev E A7 Quarry Haul RoadA7-09-03 Rev E A7 Quarry Haul Road6 Jan 2026View
A7-13-01 Rev M Restoration Proposals Site Wide MasterplanA7-13-01 Rev M Restoration Proposals Site Wide Masterplan6 Jan 2026View
A7-20-01 Rev D 5 Year Aftercare Scheme & Biodiversity ManagementA7-20-01 Rev D 5 Year Aftercare Scheme & Biodiversity Management6 Jan 2026View
A7-13-01 Rev N Restoration Proposals Site Wide MasterplanA7-13-01 Rev N Restoration Proposals Site Wide Masterplan12 Mar 2026View
A7-09-03 Rev F A7 Quarry Haul RoadA7-09-03 Rev F A7 Quarry Haul Road12 Mar 2026View
A7-07 Rev G Silt and Water ManagementA7-07 Rev G Silt and Water Management12 Mar 2026View
A7-20-01 Rev E 5 Year Aftercare Scheme & Biodiversity ManagementA7-20-01 Rev E 5 Year Aftercare Scheme & Biodiversity Management12 Mar 2026View
Site NoticeSite Notice23 Apr 2025View
Additional Information Site NoticeAdditional Information Site Notice22 Dec 2025View
Further Information Site NoticeFurther Information Site Notice17 Mar 2026View
Bradwell with Pattiswick Parish Council Consultation ResponseBradwell with Pattiswick Parish Council Consultation Response22 May 2025View
National Highways Consultation ResponseNational Highways Consultation Response27 May 2025View
Ringway Jacobs (Air Quality) Consultation ResponseRingway Jacobs (Air Quality) Consultation Response27 May 2025View
Feering Parish Council Consultation ResponseFeering Parish Council Consultation Response28 May 2025View
Natural England Consultation ResponseNatural England Consultation Response3 Jun 2025View
George Nicholls - Kelvedon and Feering Heritage Society Consultation ResponseGeorge Nicholls - Kelvedon and Feering Heritage Society Consultation Response3 Jun 2025View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response6 Jun 2025View
Braintree District Council Consultation ResponseBraintree District Council Consultation Response18 Jun 2025View
Active Travel England Consultation ResponseActive Travel England Consultation Response13 Jan 2026View
Natural England Consultation ResponseNatural England Consultation Response21 Jan 2026View
Essex Local Access Forum Consultation ResponseEssex Local Access Forum Consultation Response28 Jan 2026View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response29 Jan 2026View
Ringway Jacobs (Lighting) Consultation ResponseRingway Jacobs (Lighting) Consultation Response29 Jan 2026View
Bradwell with Pattiswick Parish Council Consultation ResponseBradwell with Pattiswick Parish Council Consultation Response30 Jan 2026View
National Highways Consultation ResponseNational Highways Consultation Response2 Feb 2026View
Feering Parish Council Objection - Mrs Lisa Collins 2/3/2026Feering Parish Council Objection - Mrs Lisa Collins 2/3/20263 Feb 2026View
Coggeshall Parish Council Consultation ResponseCoggeshall Parish Council Consultation Response3 Feb 2026View
Coggeshall Parish Council Consultation ResponseCoggeshall Parish Council Consultation Response4 Feb 2026View
Ringway Jacobs (Air Quality) Consultation ResponseRingway Jacobs (Air Quality) Consultation Response3 Feb 2026View
Ringway Jacobs (Lighting) Consultation Response - Further CommentsRingway Jacobs (Lighting) Consultation Response - Further Comments3 Feb 2026View
Anglian WaterAnglian Water9 Feb 2026View
Kelvedon Parish ResponseKelvedon Parish Response9 Feb 2026View
Cllr Paul Thorogod Consultation ResponseCllr Paul Thorogod Consultation Response9 Feb 2026View
Braintree District Council Consultation ResponseBraintree District Council Consultation Response9 Feb 2026View
Environment Agency Consultation ResponseEnvironment Agency Consultation Response10 Feb 2026View
British Horse Society Consultation ResponseBritish Horse Society Consultation Response12 Feb 2026View
Place Servcies Consultation ResponsePlace Servcies Consultation Response16 Feb 2026View
Ringway Jacobs Consultation ResponseRingway Jacobs Consultation Response16 Mar 2026View
Rivenhall Parish Council Consultation ResponseRivenhall Parish Council Consultation Response17 Mar 2026View
Active Travel EnglandActive Travel England20 Mar 2026View
Natural EnglandNatural England27 Mar 2026View
National Highways Consultation ResponseNational Highways Consultation Response8 Apr 2026View
Jacobs - Noise and vibrationJacobs - Noise and vibration9 Apr 2026View
Strategic ResponseStrategic Response15 Apr 2026View
Kelvedon Parish ResponseKelvedon Parish Response20 Apr 2026View
Feering Parish ResponseFeering Parish Response21 Apr 2026View
Place Services Consultation ResponsePlace Services Consultation Response22 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.