Use of 0.69 hectares of land to the north of Hovefields Court, Basildon, Essex, SS13 1EB for commercial/industrial and household waste transfer station for waste recovery activities comprising of the importation, deposit, sorting, storage, transfer and distribution of up to 70,000 tonnes per annum of commercial, industrial and household waste materials within a building, and 5,000 tonnes per annum of asbestos bearing waste in a separate section of the site in sealed locked containers, and decontamination unit, with sealed drainage and dust suppression unit (306m2) and the erection of associated buildings and offices (2690m2) HGV and empty skip storage, weighbridge, car park, fuel tank, lockable storage containers and improvements to site surface
Land to the North of Hovefields Court, Hovefields Avenue, Basildon, Essex, SS13 1EB
Use of 0.69 hectares of land to the north of Hovefields Court, Basildon, Essex, SS13 1EB for commercial/industrial and household waste transfer station for waste recovery activities comprising of the importation, deposit, sorting, storage, transfer and distribution of up to 70,000 tonnes per annum of commercial, industrial and household waste materials within a building, and 5,000 tonnes per annum of asbestos bearing waste in a separate section of the site in sealed locked containers, and decontamination unit, with sealed drainage and dust suppression unit (306m2) and the erection of associated buildings and offices (2690m2) HGV and empty skip storage, weighbridge, car park, fuel tank, lockable storage containers and improvements to site surface
Reference
ESS/31/15/BAS/20/1
Agent
Mr Gary East
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.