ApprovedCouncil status: Decision Made

Use of 0.69 hectares of land to the north of Hovefields Court, Basildon, Essex, SS13 1EB for commercial/industrial and household waste transfer station for waste recovery activities comprising of the importation, deposit, sorting, storage, transfer and distribution of up to 70,000 tonnes per annum of commercial, industrial and household waste materials within a building, and 5,000 tonnes per annum of asbestos bearing waste in a separate section of the site in sealed locked containers, and decontamination unit, with sealed drainage and dust suppression unit (306m2) and the erection of associated buildings and offices (2690m2) HGV and empty skip storage, weighbridge, car park, fuel tank, lockable storage containers and improvements to site surface

Land to the North of Hovefields Court, Hovefields Avenue, Basildon, Essex, SS13 1EB

Essex County CouncilReference ESS/31/15/BASFull Planning Application ESS

Last published check: 1 Nov 2026, 04:14. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 04:14 (UK)

  1. DoneReceived24 Jul 2015
  2. DoneValidated27 Jul 2015
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted10 Dec 2015

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
Application type
Full Planning Application ESS
Documents
49 published

Proposal

Use of 0.69 hectares of land to the north of Hovefields Court, Basildon, Essex, SS13 1EB for commercial/industrial and household waste transfer station for waste recovery activities comprising of the importation, deposit, sorting, storage, transfer and distribution of up to 70,000 tonnes per annum of commercial, industrial and household waste materials within a building, and 5,000 tonnes per annum of asbestos bearing waste in a separate section of the site in sealed locked containers, and decontamination unit, with sealed drainage and dust suppression unit (306m2) and the erection of associated buildings and offices (2690m2) HGV and empty skip storage, weighbridge, car park, fuel tank, lockable storage containers and improvements to site surface

Reference
ESS/31/15/BAS
Agent
Mr Gary East

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision NoticeDecision Notice11 Dec 2015View
  • Committee Report 27 November 2015Committee Report 27 November 201520 Nov 2015View
  • Committee Minutes 27 November 2015Committee Minutes 27 November 201515 Dec 2015View
  • Working Plan for Current TLM SiteWorking Plan for Current TLM Site29 Jul 2015View
  • Noise AssessmentNoise Assessment29 Jul 2015View
  • Ecological AppraisalEcological Appraisal29 Jul 2015View
  • Reptile Survey ReportReptile Survey Report29 Jul 2015View
  • Topographic SurveyTopographic Survey29 Jul 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.