Council planning record

Outline planning application with all matters reserved (except for access) for the construction of a Carbon Capture, Usage and Storage Plant, a Heat Offtake Plant, an electrical switch room and electricity cables, associated external pipelines and cables, and landscaping works.

Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DF

Awaiting Sec of StateReference: ESS/24/25/BTEEssex County Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Consultation Start

    Published milestoneCouncil source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source

Application summary

Status
Awaiting Sec of State
Application type
Outline App (reserved matters) ESS
Received
12 Mar 2025
Validated
1 Apr 2025
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Outline planning application with all matters reserved (except for access) for the construction of a Carbon Capture, Usage and Storage Plant, a Heat Offtake Plant, an electrical switch room and electricity cables, associated external pipelines and cables, and landscaping works.

Proposal details

Reference
ESS/24/25/BTE
Agent
Mr Alex MacGregor

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DF

This record has no verified map location.

Documents 166 of 166

DocumentPublishedAction
Committee Report ESS/23/25/BTE & ESS/24/25/BTE September 2026Committee Report ESS/23/25/BTE & ESS/24/25/BTE September 202618 Sept 2026View
Draft Committee AddendumDraft Committee Addendum23 Sept 2026View
Application FormApplication Form9 Apr 2025View
EA ChecklistEA Checklist2 Apr 2025View
Scoping Opinion ESS/51/24/BTE/SPOScoping Opinion ESS/51/24/BTE/SPO2 Apr 2025View
Cover Letter re revised submission March 2026Cover Letter re revised submission March 202616 Apr 2026View
Revised Planning Statement - Design and Access Statement March 2026Revised Planning Statement - Design and Access Statement March 202616 Apr 2026View
ECC as Waste Planning Authority Note re Consultation Responses and CorrespondenceECC as Waste Planning Authority Note re Consultation Responses and Correspondence28 Apr 2026View
Delay in acknowledging representationsDelay in acknowledging representations5 May 2026View
VAA-WA-58020017_0.0 Site Location PlanVAA-WA-58020017_0.0 Site Location Plan20 Mar 2025View
VAA-WA-58020018_0.0 Maximum Footprint Parameter PlanVAA-WA-58020018_0.0 Maximum Footprint Parameter Plan20 Mar 2025View
Environmental Statement (ES) Non Technical SummaryEnvironmental Statement (ES) Non Technical Summary13 Mar 2025View
ES Vol 1 Chapter 0 - Table of Contents, Glossary and AbbreviationsES Vol 1 Chapter 0 - Table of Contents, Glossary and Abbreviations13 Mar 2025View
ES Vol 1 Chapter 1 - IntroductionES Vol 1 Chapter 1 - Introduction13 Mar 2025View
ES Vol 1 Chapter 2 - Sites and SettingES Vol 1 Chapter 2 - Sites and Setting13 Mar 2025View
ES Vol 1 Chapter 3 - EIA MethodologyES Vol 1 Chapter 3 - EIA Methodology13 Mar 2025View
ES Vol 1 Chapter 4 - AlternativesES Vol 1 Chapter 4 - Alternatives13 Mar 2025View
ES Vol 1 Chapter 5 - Devleopment of EIA DevelopmentES Vol 1 Chapter 5 - Devleopment of EIA Development13 Mar 2025View
ES Vol 1 Chapter 6 - Construction and DecommissioningES Vol 1 Chapter 6 - Construction and Decommissioning13 Mar 2025View
ES Vol 1 Chapter 7 - Land Use and Contaminated LandES Vol 1 Chapter 7 - Land Use and Contaminated Land13 Mar 2025View
ES Vol 1 Chapter 8 - Groundwater, Surface Water and Flood RiskES Vol 1 Chapter 8 - Groundwater, Surface Water and Flood Risk13 Mar 2025View
ES Vol 1 Chapter 9 - BiodiversityES Vol 1 Chapter 9 - Biodiversity13 Mar 2025View
ES Vol 1 Chapter 10 - Archaeology and Cultural HeritageES Vol 1 Chapter 10 - Archaeology and Cultural Heritage13 Mar 2025View
ES Vol 1 Chapter 11 - Air QualityES Vol 1 Chapter 11 - Air Quality13 Mar 2025View
ES Vol 1 Chapter 12 - Noise and VibrationES Vol 1 Chapter 12 - Noise and Vibration13 Mar 2025View
ES Vol 1 Chapter 13 - Travel and TransportES Vol 1 Chapter 13 - Travel and Transport13 Mar 2025View
ES Vol 1 Chapter 14 - Climate Change and Greenhouse GasesES Vol 1 Chapter 14 - Climate Change and Greenhouse Gases13 Mar 2025View
ES Vol 1 Chapter 15 - Socio Economics and CommunityES Vol 1 Chapter 15 - Socio Economics and Community13 Mar 2025View
ES Vol 1 Chapter 16 - Human HealthES Vol 1 Chapter 16 - Human Health13 Mar 2025View
ES Vol 1 Chapter 17 - Effect InteractionsES Vol 1 Chapter 17 - Effect Interactions13 Mar 2025View
ES Vol 1 Chapter 18 - SummaryES Vol 1 Chapter 18 - Summary13 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 1ES Vol 2 Landscape and Visual Impact Assessment Part 113 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 2ES Vol 2 Landscape and Visual Impact Assessment Part 213 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 3ES Vol 2 Landscape and Visual Impact Assessment Part 313 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 4ES Vol 2 Landscape and Visual Impact Assessment Part 413 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 5ES Vol 2 Landscape and Visual Impact Assessment Part 513 Mar 2025View
ES Vol 2 Landscape and Visual Impact Assessment Part 6ES Vol 2 Landscape and Visual Impact Assessment Part 613 Mar 2025View
ES Vol 3 Table of ContentsES Vol 3 Table of Contents13 Mar 2025View
ES Vol 3 Appendix 1.1 Summary of Consented SchemeES Vol 3 Appendix 1.1 Summary of Consented Scheme13 Mar 2025View
ES Vol 3 Appendix 1.2 Decision Notice ESS/39/23/BTEES Vol 3 Appendix 1.2 Decision Notice ESS/39/23/BTE13 Mar 2025View
ES Vol 3 Appendix 3.1 Location of Specified information in the ESES Vol 3 Appendix 3.1 Location of Specified information in the ES13 Mar 2025View
ES Vol 3 Appendix 3.2 Scoping ReportES Vol 3 Appendix 3.2 Scoping Report13 Mar 2025View
ES Vol 3 Appendix 3.3 EIA Scoping OpinionES Vol 3 Appendix 3.3 EIA Scoping Opinion13 Mar 2025View
ES Vol 3 Appendix 3.4 ECC Scoping Correspondence_RedactedES Vol 3 Appendix 3.4 ECC Scoping Correspondence_Redacted9 Apr 2025View
ES Vol 3 Appendix 3.5 Cumulative SchemesES Vol 3 Appendix 3.5 Cumulative Schemes13 Mar 2025View
ES Vol 3 Appendix 3.6 General EIA Assessment CriteriaES Vol 3 Appendix 3.6 General EIA Assessment Criteria13 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 1ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 113 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 2ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 213 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 3ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 313 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 4ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 413 Mar 2025View
ES Vol 3 Appemdix 5.1 relevant Detailed Drawings Part 5ES Vol 3 Appemdix 5.1 relevant Detailed Drawings Part 520 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 6ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 613 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 7ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 713 Mar 2025View
ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 8ES Vol 3 Appendix 5.1 Relevent Detailed Drawings Part 813 Mar 2025View
ES Vol 3 Appendix 5.2 Schedule of amended conditions S73ES Vol 3 Appendix 5.2 Schedule of amended conditions S7328 Mar 2025View
ES Vol 3 Appendix 5.3 Parameter PlansES Vol 3 Appendix 5.3 Parameter Plans13 Mar 2025View
ES Vol 3 Appendix 5.5 Schedule Of Proposed Outline Application Planning ConditionsES Vol 3 Appendix 5.5 Schedule Of Proposed Outline Application Planning Conditions13 Mar 2025View
ES Vol 3 Appendix 5.6 Major Accidents and Disasters Tech NoteES Vol 3 Appendix 5.6 Major Accidents and Disasters Tech Note13 Mar 2025View
ES Vol 3 Appendix 6.1 Outline CEMPES Vol 3 Appendix 6.1 Outline CEMP13 Mar 2025View
ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 1ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 113 Mar 2025View
ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 2ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 213 Mar 2025View
ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 3ES Vol 3 Appendix 7.1 Preliminary Land Quality Risk Assessment Part 313 Mar 2025View
Es Vol 3 Appendix 8.1 Flood Risk AssessmentEs Vol 3 Appendix 8.1 Flood Risk Assessment13 Mar 2025View
ES Vol 3 Appendix 8.2 Surface Water DrainageES Vol 3 Appendix 8.2 Surface Water Drainage13 Mar 2025View
ES Vol 3 Appendix 8.3 Water Framework Directive ScreeningES Vol 3 Appendix 8.3 Water Framework Directive Screening13 Mar 2025View
ES Vol 3 Appendix 8.4 Environment Agency Permits RegisterES Vol 3 Appendix 8.4 Environment Agency Permits Register13 Mar 2025View
ES Vol 3 Appendix 8.5 Water Management Report Part1_RedactedES Vol 3 Appendix 8.5 Water Management Report Part1_Redacted9 Apr 2025View
ES Vol 3 Appendix 8.5 Water Management Report Part 2ES Vol 3 Appendix 8.5 Water Management Report Part 213 Mar 2025View
ES Vol 3 Appendix 8.5 Water Management Report Part3_RedactedES Vol 3 Appendix 8.5 Water Management Report Part3_Redacted9 Apr 2025View
ES Vol 3 Appendix 8.5 Water Management Report Part 4ES Vol 3 Appendix 8.5 Water Management Report Part 413 Mar 2025View
ES Vol 3 Appendix 9.1 Legislation and GuidanceES Vol 3 Appendix 9.1 Legislation and Guidance13 Mar 2025View
ES Vol 3 Appendix 9.2 Ecological Baseline Report_RedactedES Vol 3 Appendix 9.2 Ecological Baseline Report_Redacted9 Apr 2025View
ES Vol 3 Appendix 9.3 PhotographsES Vol 3 Appendix 9.3 Photographs13 Mar 2025View
ES Vol 3 Appendix 9.4 BNG AssessmentES Vol 3 Appendix 9.4 BNG Assessment13 Mar 2025View
ES Vol 3 Appendix 9.4 BNG Metric Current baselineES Vol 3 Appendix 9.4 BNG Metric Current baseline13 Mar 2025View
ES Vol 3 Appendix 9.4 BNG Metric Future baselineES Vol 3 Appendix 9.4 BNG Metric Future baseline13 Mar 2025View
ES Vol 3 Appendix 10.1 2006 Archaeological Field EvaluationES Vol 3 Appendix 10.1 2006 Archaeological Field Evaluation13 Mar 2025View
ES Vol 3 Appendix 10.2 2014 Project Design and Archaeological MonitoringES Vol 3 Appendix 10.2 2014 Project Design and Archaeological Monitoring13 Mar 2025View
ES Vol 3 Appendix 10.3 2017 Archaeological Monitoring Watching BriefES Vol 3 Appendix 10.3 2017 Archaeological Monitoring Watching Brief13 Mar 2025View
ES Vol 3 Appendix 10.4 2021 Historic Buildings Recording of Woodhouse Farm and its BuildingsES Vol 3 Appendix 10.4 2021 Historic Buildings Recording of Woodhouse Farm and its Buildings13 Mar 2025View
ES Vol 3 Appendix 10.5 2022 Archaeological Strip Map and Sample ExcavationES Vol 3 Appendix 10.5 2022 Archaeological Strip Map and Sample Excavation13 Mar 2025View
ES Vol 3 Appendix 10.6 2022 Archaeological Monitoring and Watching BriefES Vol 3 Appendix 10.6 2022 Archaeological Monitoring and Watching Brief13 Mar 2025View
ES Vol 3 Appendix 10.7 2023 Archaeological Monitoring and Watching BriefES Vol 3 Appendix 10.7 2023 Archaeological Monitoring and Watching Brief13 Mar 2025View
ES Vol 3 Appendix 11.1 Air Quality Legislation Policy GuidanceES Vol 3 Appendix 11.1 Air Quality Legislation Policy Guidance13 Mar 2025View
ES Vol 3 Appendix 11.2 Construction Phase Assessment Methodology_RedactedES Vol 3 Appendix 11.2 Construction Phase Assessment Methodology_Redacted9 Apr 2025View
ES Vol 3 Appendix 11.3 Current Baseline Air Quality_RedactedES Vol 3 Appendix 11.3 Current Baseline Air Quality_Redacted9 Apr 2025View
ES Vol 3 Appendix 11.4 Dispersion Modelling AssessmentES Vol 3 Appendix 11.4 Dispersion Modelling Assessment13 Mar 2025View
ES Vol 3 Appendix 11.5 Dioxin Pathway Intake AssessmentES Vol 3 Appendix 11.5 Dioxin Pathway Intake Assessment13 Mar 2025View
ES Vol 3 Appendix 12.1 Guidance and StandardsES Vol 3 Appendix 12.1 Guidance and Standards13 Mar 2025View
ES Vol 3 Appendix 12.2 Source Noise LevelsES Vol 3 Appendix 12.2 Source Noise Levels13 Mar 2025View
ES Vol 3 Appendix 12.3 Noise Survey Details_RedactedES Vol 3 Appendix 12.3 Noise Survey Details_Redacted9 Apr 2025View
ES Vol 3 Appendix 13.1 Legislation And GuidanceES Vol 3 Appendix 13.1 Legislation And Guidance13 Mar 2025View
ES Vol 3 Appendix 13.2 Transport AssessmentPart1_RedactedES Vol 3 Appendix 13.2 Transport AssessmentPart1_Redacted9 Apr 2025View
ES Vol 3 Appendix 13.2 Transport AssessmentPart2_RedactedES Vol 3 Appendix 13.2 Transport AssessmentPart2_Redacted9 Apr 2025View
ES Vol 3 Appendix 13.2 Transport AssessmentPart3_RedactedES Vol 3 Appendix 13.2 Transport AssessmentPart3_Redacted9 Apr 2025View
ES Vol 3 Appendix 14.1 Legislation Planning Policy and Guidance_RedactedES Vol 3 Appendix 14.1 Legislation Planning Policy and Guidance_Redacted9 Apr 2025View
ES Vol 3 Appendix 14.2 Climate baseline report_RedactedES Vol 3 Appendix 14.2 Climate baseline report_Redacted9 Apr 2025View
ES Vol 3 Appendix 14.3 Climate Resilience Assessment_RedactedES Vol 3 Appendix 14.3 Climate Resilience Assessment_Redacted9 Apr 2025View
ES Vol 3 Appendix 14.4 GHG Emissions AssessmentsES Vol 3 Appendix 14.4 GHG Emissions Assessments13 Mar 2025View
ES Vol 3 Appendix 17.1 ICCI Technical NoteES Vol 3 Appendix 17.1 ICCI Technical Note13 Mar 2025View
Applicants response to Consultation CommentsApplicants response to Consultation Comments2 Jul 2026View
Agent Response to JacobsAgent Response to Jacobs10 Sept 2026View
VAA-WA-58020033_1.0 Simplified Process Flow -Not for ApprovalVAA-WA-58020033_1.0 Simplified Process Flow -Not for Approval31 Mar 2026View
AA-WA-58020019_2.0 Maximum Height Parameter ElevationsAA-WA-58020019_2.0 Maximum Height Parameter Elevations21 Aug 2026View
ES Vol 3 Appendix 5.4 Development SpecificationES Vol 3 Appendix 5.4 Development Specification31 Mar 2026View
ES AddendumES Addendum16 Apr 2026View
ES Appendix 1 Part 1ES Appendix 1 Part 116 Apr 2026View
ES Appendix 1 Part 2ES Appendix 1 Part 216 Apr 2026View
ES Appendix 1 Part 3ES Appendix 1 Part 39 Apr 2026View
ES Appendix 1 Part 4ES Appendix 1 Part 416 Apr 2026View
ES Appendix 1 Part 5ES Appendix 1 Part 516 Apr 2026View
ES Appendix 1 Part 6ES Appendix 1 Part 69 Apr 2026View
ES Appendix 1 Part 7ES Appendix 1 Part 79 Apr 2026View
ES Appendix 1 Part 8ES Appendix 1 Part 89 Apr 2026View
ES Appendix 1 Part 9ES Appendix 1 Part 99 Apr 2026View
ES Appendix 1 Part 10ES Appendix 1 Part 1016 Apr 2026View
ES Appendix 1 Part 11ES Appendix 1 Part 1116 Apr 2026View
ES Appendix 1 Part 12ES Appendix 1 Part 1216 Apr 2026View
ES Appendix 1 Part 13ES Appendix 1 Part 1316 Apr 2026View
ES Appendix 1 Part 14ES Appendix 1 Part 1416 Apr 2026View
ES Appendix 1 Part 15ES Appendix 1 Part 1516 Apr 2026View
ES Appendix 1 Part 16ES Appendix 1 Part 1616 Apr 2026View
Planning Design and Access Statement with appendiciesPlanning Design and Access Statement with appendicies28 Mar 2025View
VAA-WA-58020019_0.0 Maximum Height Parameter ElevationsVAA-WA-58020019_0.0 Maximum Height Parameter Elevations20 Mar 2025View
VAA-WA-58020033_0.0 Simplified Process Flow - Not for approvalVAA-WA-58020033_0.0 Simplified Process Flow - Not for approval20 Mar 2025View
VAA-WA-58020019_1.0 Maximum Height Parameter ElevationsVAA-WA-58020019_1.0 Maximum Height Parameter Elevations31 Mar 2026View
ES Vol 3 Appendix 5.4 Development SpecificationES Vol 3 Appendix 5.4 Development Specification13 Mar 2025View
Site NoticeSite Notice4 Apr 2025View
Additional Information Site NoticeAdditional Information Site Notice15 Apr 2026View
Natural England Consultation ResponseNatural England Consultation Response25 Apr 2025View
National HighwaysNational Highways1 May 2025View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response13 May 2025View
SUPERSEDED - Ringway Jacobs (Air Quality) Consultation ResponseSUPERSEDED - Ringway Jacobs (Air Quality) Consultation Response14 May 2025View
Bradwell with Pattiswick Parish Council Consultation ResponseBradwell with Pattiswick Parish Council Consultation Response22 May 2025View
Coggeshall Parish Council Consultation ResponseCoggeshall Parish Council Consultation Response27 May 2025View
Cllr Ross Playle Consultation ResponseCllr Ross Playle Consultation Response3 Jun 2025View
Ringway Jacobs (Lighting) Consultation ResponseRingway Jacobs (Lighting) Consultation Response6 Jun 2025View
ECC - Public Health Consultation ResponseECC - Public Health Consultation Response9 Jun 2025View
EA response to S73/Variation application ESS/23/25/BTEEA response to S73/Variation application ESS/23/25/BTE18 Jun 2025View
EA response to Outline application to Carbon Capture Use and Storage plant with Heat Offtake.EA response to Outline application to Carbon Capture Use and Storage plant with Heat Offtake.18 Jun 2025View
EA response to Non Material Amendment ESS/39/23/BTE/NMA13EA response to Non Material Amendment ESS/39/23/BTE/NMA1318 Jun 2025View
Place ServicesPlace Services18 Jul 2025View
National Highways Consultation ResponseNational Highways Consultation Response22 Jul 2025View
Anglian Water Consultation ResponseAnglian Water Consultation Response31 Oct 2025View
Active Travel England Consultation ResponseActive Travel England Consultation Response24 Apr 2026View
Natural England Consultation ResponseNatural England Consultation Response27 Apr 2026View
Natural England Consultation ResponseNatural England Consultation Response29 Apr 2026View
Environment AgencyEnvironment Agency6 May 2026View
Ringway Jacobs (Air Quality) Consultation ResponseRingway Jacobs (Air Quality) Consultation Response12 May 2026View
Comments - George Nicholls Kelvedon & Feering Heritage SocietyComments - George Nicholls Kelvedon & Feering Heritage Society12 May 2026View
Bradwell with Pattiswick Parish Council Add Info Consultation ResponseBradwell with Pattiswick Parish Council Add Info Consultation Response15 May 2026View
National Highways Consultation ResponseNational Highways Consultation Response15 May 2026View
Anglian Water Consultation ResponseAnglian Water Consultation Response15 May 2026View
Kelvedon Parish ResponseKelvedon Parish Response18 May 2026View
Ringway Jacobs (Lighting) Consultation ResponseRingway Jacobs (Lighting) Consultation Response18 May 2026View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response19 May 2026View
Cllr Thorogood ResponseCllr Thorogood Response20 May 2026View
Environment Agency Consultation ResponseEnvironment Agency Consultation Response22 May 2026View
Place Services Consultation ResponsePlace Services Consultation Response26 May 2026View
SuDs Team Consultation ResponseSuDs Team Consultation Response26 May 2026View
Feering Parish ResponseFeering Parish Response27 May 2026View
Highways - Strategic Development Consultation ResponseHighways - Strategic Development Consultation Response29 May 2026View
Braintree Distict ResponseBraintree Distict Response7 Jul 2026View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response22 Jul 2026View
Ringway Jacobs (Noise) Consultation ResponseRingway Jacobs (Noise) Consultation Response21 Aug 2026View
Jacobs ResponseJacobs Response10 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Referred to Secretary of State
ES Vol 3 Appendix 1.2 Decision Notice ESS/39/23/BTE
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.