ApprovedCouncil status: Decision Made

Condition 24 (Noise Monitoring Survey) of ESS/48/01/COL: that was for “Review of Mineral Planning Permissions and Condition 53 (Noise Monitoring Survey) of ESS/23/14/COL : that was for Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel; extraction of remaining 0.5m tonnes of sand and gravel from Stanway Quarry; processing of remaining 1.5m tonnes of sand and gravel from Bellhouse Quarry to be imported via the existing conveyor link to Stanway Quarry by 31 October 2026 (amended via condition to tie in with the timescales permitted under ref ESS/07/01/COL/REV); retention of the existing sand and gravel processing plant, Dry Silo Mortar Plant, concrete plant, access roads, weighbridge and related infrastructure until 31 October 2026; retention of the existing inert recycling operation and associated mobile plant parking area until 31 December 2037; restoration of FWFF area using existing indigenous soils, clay and soil forming material from within the application site within 7 years of commencement of operations at FWFF; importation of approximately 2.35m cubic metres of inert waste material for the restoration of the central / eastern Stanway Quarry void by 31 December 2037; and implementation of a comprehensive restoration scheme for the application site comprising agricultural land, orchard, woodland, grassland, lakes, habitat creation and informal public access via permissive routes.

Land at Colchester Quarry, Warren lane, Stanway Colchester C03 0NN

Essex County CouncilReference ESS/23/14/COL/53/8Submission of Details CC/ESS

Last published check: 31 Oct 2026, 03:08. Check the council record for more recent changes.

Status and dates

Last published check: 31 Oct 2026, 03:08 (UK)

  1. DoneReceived31 Aug 2018
  2. DoneValidated31 Aug 2018
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted22 Nov 2018

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Consultation Start

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Submission of Details CC/ESS
Documents
5 published

Proposal

Condition 24 (Noise Monitoring Survey) of ESS/48/01/COL: that was for “Review of Mineral Planning Permissions and Condition 53 (Noise Monitoring Survey) of ESS/23/14/COL : that was for Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel; extraction of remaining 0.5m tonnes of sand and gravel from Stanway Quarry; processing of remaining 1.5m tonnes of sand and gravel from Bellhouse Quarry to be imported via the existing conveyor link to Stanway Quarry by 31 October 2026 (amended via condition to tie in with the timescales permitted under ref ESS/07/01/COL/REV); retention of the existing sand and gravel processing plant, Dry Silo Mortar Plant, concrete plant, access roads, weighbridge and related infrastructure until 31 October 2026; retention of the existing inert recycling operation and associated mobile plant parking area until 31 December 2037; restoration of FWFF area using existing indigenous soils, clay and soil forming material from within the application site within 7 years of commencement of operations at FWFF; importation of approximately 2.35m cubic metres of inert waste material for the restoration of the central / eastern Stanway Quarry void by 31 December 2037; and implementation of a comprehensive restoration scheme for the application site comprising agricultural land, orchard, woodland, grassland, lakes, habitat creation and informal public access via permissive routes.

Reference
ESS/23/14/COL/53/8
Agent
Zena Gaskin

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Condition Report (PDF)Condition Report (PDF)22 Nov 2018View
  • Decision Letter (PDF)Decision Letter (PDF)22 Nov 2018View
  • Tarmac Colchester Quarry Monitoring Report Mar 18Tarmac Colchester Quarry Monitoring Report Mar 1831 Aug 2018View
  • Essex CC Condition Approval form ESS.48.01.COL.R Cond 24 NOISEEssex CC Condition Approval form ESS.48.01.COL.R Cond 24 NOISE4 Sept 2018View
  • Essex CC Condition Approval form ESS.23.14.COL Cond 53 NOISEEssex CC Condition Approval form ESS.23.14.COL Cond 53 NOISE4 Sept 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Letter (PDF)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.