Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel; extraction of remaining 0.5m tonnes of sand and gravel from Stanway Quarry; processing of remaining 1.5m tonnes of sand and gravel from Bellhouse Quarry to be imported via the existing conveyor link to Stanway Quarry by 31 October 2026 (amended via condition to tie in with the timescales permitted under ref ESS/07/01/COL/REV); retention of the existing sand and gravel processing plant, Dry Silo Mortar Plant, concrete plant, access roads, weighbridge and related infrastructure until 31 October 2026; retention of the existing inert recycling operation and associated mobile plant parking area until 31 December 2037; restoration of FWFF area using existing indigenous soils, clay and soil forming material from within the application site within 7 years of commencement of operations at FWFF; importation of approximately 2.35m cubic metres of inert waste material for the restoration of the central / eastern Stanway Quarry void by 31 December 2037; and implementation of a comprehensive restoration scheme for the application site comprising agricultural land, orchard, woodland, grassland, lakes, habitat creation and informal public access via permissive routes

Stanway Quarry and Five Ways Fruit Farm, Warren Lane, Colchester, Stanway, CO3 0NN

Decision MadeReference: ESS/23/14/COL/46/1Essex County Council

Last published check: 30 Sept 2026, 12:00. Check the council record for more recent changes.

Application location

Stanway Quarry and Five Ways Fruit Farm, Warren Lane, Colchester, Stanway, CO3 0NN

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
20 May 2015
Validated
26 May 2015
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel; extraction of remaining 0.5m tonnes of sand and gravel from Stanway Quarry; processing of remaining 1.5m tonnes of sand and gravel from Bellhouse Quarry to be imported via the existing conveyor link to Stanway Quarry by 31 October 2026 (amended via condition to tie in with the timescales permitted under ref ESS/07/01/COL/REV); retention of the existing sand and gravel processing plant, Dry Silo Mortar Plant, concrete plant, access roads, weighbridge and related infrastructure until 31 October 2026; retention of the existing inert recycling operation and associated mobile plant parking area until 31 December 2037; restoration of FWFF area using existing indigenous soils, clay and soil forming material from within the application site within 7 years of commencement of operations at FWFF; importation of approximately 2.35m cubic metres of inert waste material for the restoration of the central / eastern Stanway Quarry void by 31 December 2037; and implementation of a comprehensive restoration scheme for the application site comprising agricultural land, orchard, woodland, grassland, lakes, habitat creation and informal public access via permissive routes

Proposal details

Reference
ESS/23/14/COL/46/1
Agent
Mr Graham Jenkins

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
Application FormApplication Form29 May 2015View
Cover Letter 19 May 2015Cover Letter 19 May 201529 May 2015View
Planning ConditionsPlanning Conditions29 May 2015View
Decision LetterDecision Letter3 Jul 2015View
Discharge of Conditions ReportDischarge of Conditions Report3 Jul 2015View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.