Council planning record

Non-material amendment to permission ref ESS/22/12/BAS to include: maximisation of light to west elevation of visitor centre; revision of visitor centre roofline and addition of roof plant and screen; removal of separate crane hall lift and replacement with staircase lift; lowering of roof height of the transfer switch room; alteration to layout and orientation of bio hall roof lights; rationalisation of solar panel layout on bio hall roof; additional smoke vents; removal of pedestrian doors from roller shutter doors; adjustment of parapet height on product storage area, reception hall, processing hall and crane hall and change of crane hall roof pitch from single to double pitched; addition of switch room and plant room doors and louvres; additional glass panels and increase in depth of surround to crane hall window; repositioning of ventilation louvres; additional pedestrian door to biostabilisation hall; alterations to water tanks; amendments to the internal pedestrian footway; reduction in lagoon slope angles; and revised internal arrangement of visitor centre.

Land at Courtauld Road, basildon, Essex

Decision MadeReference: ESS/22/12/BAS/NMA6Essex County Council

Last published check: 30 Sept 2026, 20:09. Check the council record for more recent changes.

Application location

Land at Courtauld Road, basildon, Essex

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Non Material Amendment
Received
20 May 2014
Validated
20 May 2014
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Non-material amendment to permission ref ESS/22/12/BAS to include: maximisation of light to west elevation of visitor centre; revision of visitor centre roofline and addition of roof plant and screen; removal of separate crane hall lift and replacement with staircase lift; lowering of roof height of the transfer switch room; alteration to layout and orientation of bio hall roof lights; rationalisation of solar panel layout on bio hall roof; additional smoke vents; removal of pedestrian doors from roller shutter doors; adjustment of parapet height on product storage area, reception hall, processing hall and crane hall and change of crane hall roof pitch from single to double pitched; addition of switch room and plant room doors and louvres; additional glass panels and increase in depth of surround to crane hall window; repositioning of ventilation louvres; additional pedestrian door to biostabilisation hall; alterations to water tanks; amendments to the internal pedestrian footway; reduction in lagoon slope angles; and revised internal arrangement of visitor centre.

Proposal details

Reference
ESS/22/12/BAS/NMA6
Agent
Mr Alistair Hoyle

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 29 of 29

DocumentPublishedAction
SummarySummary22 May 2014View
List of Changes and Revised Drawing NumbersList of Changes and Revised Drawing Numbers22 May 2014View
Fee CalculationFee Calculation22 May 2014View
Figure 1 South East PerspectiveFigure 1 South East Perspective22 May 2014View
Revised Drawing - PLA_002 Rev_CRevised Drawing - PLA_002 Rev_C22 May 2014View
Revised Drawing - PLA_003 Rev_DRevised Drawing - PLA_003 Rev_D22 May 2014View
Revised Drawing - PLA_005 Rev_ERevised Drawing - PLA_005 Rev_E22 May 2014View
Revised Drawing - PLA_006 Rev_DRevised Drawing - PLA_006 Rev_D22 May 2014View
Revised Drawing - PLA_007 Rev_DRevised Drawing - PLA_007 Rev_D22 May 2014View
Revised Drawing - PLA_008 Rev_ERevised Drawing - PLA_008 Rev_E22 May 2014View
Revised Drawing - PLA_009 Rev_DRevised Drawing - PLA_009 Rev_D22 May 2014View
Revised Drawing - PLA_010 Rev_DRevised Drawing - PLA_010 Rev_D22 May 2014View
Revised Drawing - PLA_012 Rev_ARevised Drawing - PLA_012 Rev_A22 May 2014View
Revised Drawing - PLA_013 Rev_ARevised Drawing - PLA_013 Rev_A22 May 2014View
Revised Drawing - PLA_014 Rev_ERevised Drawing - PLA_014 Rev_E22 May 2014View
Revised Drawing - PLA_015 Rev_DRevised Drawing - PLA_015 Rev_D22 May 2014View
Revised Drawing - PLA_016 Rev_CRevised Drawing - PLA_016 Rev_C22 May 2014View
Revised Drawing - PLA_019 Rev_BRevised Drawing - PLA_019 Rev_B22 May 2014View
Revised Drawing - PLA_020 Rev_CRevised Drawing - PLA_020 Rev_C22 May 2014View
Revised Drawing - PLA_021 Rev_CRevised Drawing - PLA_021 Rev_C22 May 2014View
Revised Drawing - PLA_022 Rev_CRevised Drawing - PLA_022 Rev_C22 May 2014View
Revised Drawing - PLA_024 Rev_BRevised Drawing - PLA_024 Rev_B22 May 2014View
Revised Drawing - PLA_025 Rev_ERevised Drawing - PLA_025 Rev_E22 May 2014View
Revised Drawing - PLA_027 Rev_ERevised Drawing - PLA_027 Rev_E22 May 2014View
Revised Drawing - PLA_029 Rev_DRevised Drawing - PLA_029 Rev_D22 May 2014View
Visitor Centre Environmental StrategyVisitor Centre Environmental Strategy22 May 2014View
Information in support of the application - 3/6/14Information in support of the application - 3/6/145 Jun 2014View
Decision LetterDecision Letter5 Jun 2014View
Application FormApplication Form20 Nov 2014View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.