Details pursuant to Condition 60 – Written Scheme of Investigation for Palaeolithic Archaeology – ESS/17/18/TEN: Extraction of 3.8 million tonnes of sand and gravel as an easterly extension to the existing Wivenhoe Quarry, erection of sand and gravel processing plant and ancillary facilities, new vehicular access onto the B1027 Brightlingsea Road, and restoration to agriculture and low-level water-based nature conservation habitats, lowland meadow, woodland planting and hedgerow enhancement using approximately 1.2 million cubic metres of imported inert waste material.
Land to the south of Colchester Main Road Alresford Nr Colchester C07 8DB
Details pursuant to Condition 60 – Written Scheme of Investigation for Palaeolithic Archaeology – ESS/17/18/TEN: Extraction of 3.8 million tonnes of sand and gravel as an easterly extension to the existing Wivenhoe Quarry, erection of sand and gravel processing plant and ancillary facilities, new vehicular access onto the B1027 Brightlingsea Road, and restoration to agriculture and low-level water-based nature conservation habitats, lowland meadow, woodland planting and hedgerow enhancement using approximately 1.2 million cubic metres of imported inert waste material.
Reference
ESS/17/18/TEN/60/2
Agent
Mr Dan Walker
Sign in to view all collected council fields and recorded changes.
Application Form - Without Personal DataApplication Form - Without Personal Data16 Jun 2022View
How the fee was calculatedHow the fee was calculated16 Jun 2022View
A summary of the attachments in the proposalA summary of the attachments in the proposal16 Jun 2022View
Written Scheme of Investigation re potential palaeolithic archaeologyWritten Scheme of Investigation re potential palaeolithic archaeology15 Jul 2022View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.