Installation of a 1000 kWe environmental flare compound comprising Gas Plant, Generator, storage tanks, transformer, Switch and meter room and associated close boarded and palisade fencing.
Installation of a 1000 kWe environmental flare compound comprising Gas Plant, Generator, storage tanks, transformer, Switch and meter room and associated close boarded and palisade fencing.
Reference
ESS/17/14/TEN
Sign in to view all collected council fields and recorded changes.
File Size: 11722, HREF: , Reference: A summary of the attachments in the proposalFile Size: 11722, HREF: , Reference: A summary of the attachments in the proposal22 Apr 2014View
File Size: 59391, HREF: , Reference: How the fee was calculatedFile Size: 59391, HREF: , Reference: How the fee was calculated22 Apr 2014View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.