Continuation of development permitted by ESS/61/17/BAS without compliance with condition 2 and 3 (timescale's for cessation of use and completion of restoration) to allow retention of the transformer/substation room and no.4 storage tanks. ESS/61/17/BAS was a variation of ESS/21/11/BAS which was for “The retention of the substation/transformer room, centrifuge building, control room and laboratory and 4 storage tanks. The change of use of the centrifuge building to a storeroom, change of use of the control room to a mess room for the compost operators and the change of use of the laboratory as a support facility for the nearby leachate treatment plant."
Pitsea Landfill, Pitsea Hall Lane, Pitsea, Essex, SS16 4UH
Continuation of development permitted by ESS/61/17/BAS without compliance with condition 2 and 3 (timescale's for cessation of use and completion of restoration) to allow retention of the transformer/substation room and no.4 storage tanks. ESS/61/17/BAS was a variation of ESS/21/11/BAS which was for “The retention of the substation/transformer room, centrifuge building, control room and laboratory and 4 storage tanks. The change of use of the centrifuge building to a storeroom, change of use of the control room to a mess room for the compost operators and the change of use of the laboratory as a support facility for the nearby leachate treatment plant."
Reference
ESS/123/22/BAS
Agent
Mr James Cook
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.