Details pursuant to Condition 8 (Investigation and Risk Assessment) – ESS/118/20/COL: Construction of a new building, operation of a Waste Transfer Station, retention of existing vehicle depot operation and storage area and construction of 2 vehicular access points and dropped kerb, together with ancillary development, including parking spaces, new weighbridges, a fire suppression system, refuelling island, vehicle wash and demolition of existing building.

Daisy House, Haven Road, Colchester, Essex, CO2 8HT

Decision MadeReference: ESS/118/20/COL/8/1Essex County Council

Last published check: 15 Sept 2026, 05:34. Check the council record for more recent changes.

Application location

Daisy House, Haven Road, Colchester, Essex, CO2 8HT

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
21 Aug 2024
Validated
21 Aug 2024
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Details pursuant to Condition 8 (Investigation and Risk Assessment) – ESS/118/20/COL: Construction of a new building, operation of a Waste Transfer Station, retention of existing vehicle depot operation and storage area and construction of 2 vehicular access points and dropped kerb, together with ancillary development, including parking spaces, new weighbridges, a fire suppression system, refuelling island, vehicle wash and demolition of existing building.

Proposal details

Reference
ESS/118/20/COL/8/1
Agent
Belinder Gill

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
ESS/118/20/COL/SO Screening OpinionESS/118/20/COL/SO Screening Opinion30 Aug 2024View
ReportReport17 Feb 2025View
Decision LetterDecision Letter17 Feb 2025View
Application Form - Without Personal DataApplication Form - Without Personal Data21 Aug 2024View
Covering letterCovering letter21 Aug 2024View
Remediation implementation planRemediation implementation plan30 Aug 2024View
Investigation report 1989Investigation report 198930 Aug 2024View
Phase 2 site investigation reportPhase 2 site investigation report30 Aug 2024View
Site investigation bridging reportSite investigation bridging report30 Aug 2024View
Phase 1 Desk Study (Preliminary Investigation Report)Phase 1 Desk Study (Preliminary Investigation Report)30 Aug 2024View
1904-AYE-R-SI-00001 Phase 1 Desk Study Report-optimisedfilesize1904-AYE-R-SI-00001 Phase 1 Desk Study Report-optimisedfilesize8 Oct 2024View
Photo 1 - Colchester - Site set upPhoto 1 - Colchester - Site set up8 Oct 2024View
C57-1904 Haven Road Gas & Groundwater Monitoring RecordC57-1904 Haven Road Gas & Groundwater Monitoring Record8 Oct 2024View
Condition 1 - Letter of commencement notification - Veolia ES (UK) LimitedCondition 1 - Letter of commencement notification - Veolia ES (UK) Limited8 Oct 2024View
Photo 2 Colchester - Removal of surface concrete - fire tank basePhoto 2 Colchester - Removal of surface concrete - fire tank base8 Oct 2024View
Agent EmailAgent Email8 Oct 2024View
Colchester City Council Consultation ResponseColchester City Council Consultation Response13 Sept 2024View
Colchester City CouncilColchester City Council17 Oct 2024View
Colchester City CouncilColchester City Council18 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Start

    Published milestoneCouncil source
  4. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Committee / Delegated Decision Date

    Published milestoneCouncil source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Granted
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.