Details pursuant to Condition 22 (CEMP) of planning permission ref no: ESS/105/21/TEN that was for the “Continuation of construction of an irrigation reservoir without compliance with Condition 3 (Approved Details) of Planning Permission ESS/24/15/TEN that was for "Construction of an irrigation reservoir involving the excavation, processing and removal of sand, gravel and soils, engineering works and ancillary buildings" to now provide for retrospective revisions to the location and design of the peripheral environmental bund, aggregate processing plant, mineral stockpile and storage areas, the site entrance, the internal access road and site water management and the addition of a mobile soil screening plant.
Details pursuant to Condition 22 (CEMP) of planning permission ref no: ESS/105/21/TEN that was for the “Continuation of construction of an irrigation reservoir without compliance with Condition 3 (Approved Details) of Planning Permission ESS/24/15/TEN that was for "Construction of an irrigation reservoir involving the excavation, processing and removal of sand, gravel and soils, engineering works and ancillary buildings" to now provide for retrospective revisions to the location and design of the peripheral environmental bund, aggregate processing plant, mineral stockpile and storage areas, the site entrance, the internal access road and site water management and the addition of a mobile soil screening plant.
Reference
ESS/105/21/TEN/22/3
Agent
Mr S Chaffe
Sign in to view all collected council fields and recorded changes.
2024.09.23 Elmstead Hall Ecology - compliance visit 29.8.2024 FINAL2024.09.23 Elmstead Hall Ecology - compliance visit 29.8.2024 FINAL24 Sept 2024View
2024.09.23 Application for Approval of Conditions reserved by Condition2024.09.23 Application for Approval of Conditions reserved by Condition24 Sept 2024View
2024.09.23 Application Letter SIGNED2024.09.23 Application Letter SIGNED24 Sept 2024View
Place Services ResponsePlace Services Response24 Oct 2024View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.