Council planning record

Details pursuant to condition 50 (water monitoring) of ESS/07/16/BTE which was for "Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE (Integrated Waste Management Facility)"

Bradwell Quarry, Church Road, Bradwell, CM77 8EP

Decision MadeReference: ESS/07/16/BTE/50/1Essex County Council

Last published check: 29 Sept 2026, 19:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Consultation Start

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Made
Application type
Submission of Details CC/ESS
Received
14 Mar 2017
Validated
17 Mar 2017
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Details pursuant to condition 50 (water monitoring) of ESS/07/16/BTE which was for "Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE (Integrated Waste Management Facility)"

Proposal details

Reference
ESS/07/16/BTE/50/1
Agent
Mr Patrick Wigg

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Bradwell Quarry, Church Road, Bradwell, CM77 8EP

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
Condition ReportCondition Report29 Nov 2017View
Decision LetterDecision Letter29 Nov 2017View
Application FormApplication Form16 Mar 2017View
How the fee was calculatedHow the fee was calculated16 Mar 2017View
A summary of the attachments in the proposalA summary of the attachments in the proposal16 Mar 2017View
Water Level Report 2015 and 2016Water Level Report 2015 and 201616 Mar 2017View
ReportReport31 Mar 2017View
Screening Opinion ESS/03/14/BTE/SOScreening Opinion ESS/03/14/BTE/SO31 Mar 2017View
Scoping Opinion ESS/03/14/BTE/SPOScoping Opinion ESS/03/14/BTE/SPO31 Mar 2017View
Decision Notice ESS/07/16/BTEDecision Notice ESS/07/16/BTE27 Sept 2017View
Approved groundwater monitoring pointsApproved groundwater monitoring points27 Sept 2017View
Approved Groundwater monitoring schemeApproved Groundwater monitoring scheme27 Sept 2017View
Email from applicant with respect to approved water monitoring schemeEmail from applicant with respect to approved water monitoring scheme27 Sept 2017View
Fw Bradwell Quarry condition 50 groundwater levels and water qualityFw Bradwell Quarry condition 50 groundwater levels and water quality27 Nov 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Decision Letter Decision Notice ESS/07/16/BTE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.