ApprovedCouncil status: Decision Made

Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE (Integrated Waste Management Facility)

Bradwell Quarry, Church Road, Bradwell, CM77 8EP

Essex County CouncilReference ESS/07/16/BTEFull Planning Application ESS

Last published check: 1 Nov 2026, 01:05. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 01:05 (UK)

  1. DoneReceived18 Jan 2016
  2. DoneValidated26 Jan 2016
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted7 Oct 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee / Delegated Decision Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
Application type
Full Planning Application ESS
Documents
38 published

Proposal

Continuation of development permitted by ESS/24/14/BTE without compliance with conditions 2 (application details), 7 (timescales), 38 (sequence of restoration) and 59 (no importation of mineral for processing) to allow amended restoration levels, revised phasing and additional time to complete extraction and restoration until 2021, utilisation of overburden in restoration and processing of mineral both arising from the Integrated Waste Management Facility (if implemented). Planning permission ESS/24/14/BTE being for Extraction of an estimated reserve of 3 million tonnes of sand and gravel (from Sites A3 and A4 as identified Minerals Local Plan) and retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortar plant and water management system, internal haul roads and re-contouring of restoration levels of extraction areas (Sites R and A2) with restoration to a combination of agriculture, woodland, biodiversity, water lagoons and to levels appropriate to safeguard implementation of planning permission ESS/37/08/BTE (Integrated Waste Management Facility)

Reference
ESS/07/16/BTE
Agent
Mr Steven Smith

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision NoticeDecision Notice7 Oct 2016View
  • Committee Report 29 April 2016Committee Report 29 April 201625 Apr 2016View
  • Committee Addendum 29 April 2016Committee Addendum 29 April 20169 May 2016View
  • Committee Minutes 29th April 2016Committee Minutes 29th April 201622 Jun 2016View
  • Application FormApplication Form8 Feb 2016View
  • A summary of the attachments in the proposalA summary of the attachments in the proposal8 Feb 2016View
  • How the fee was calculatedHow the fee was calculated8 Feb 2016View
  • Landscape - Landscape and Visual AppraisalLandscape - Landscape and Visual Appraisal8 Feb 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.