Details pursuant to Condition 9 (Noise Monitoring Survey) of Planning permission ESS/06/15/COL for the: Retrospective application for continuation of use of the restored Abbotstone North Landfill Site without compliance with Conditions 2 (Development Details), 3 (Reinstatement Details), 12 (Landscaping Scheme Design), 19 (AoD Levels), and 22 (Aftercare Scheme) attached to planning permission ESS/07/01/COL/REV to allow the retention of amended contours within the Abbotstone North landfill site, along the boundary with the ECC closed landfill and with Public Footpath 15”. Land at Colchester Quarry (Bellhouse), Warren Lane, Colchester, Essex
Bellhouse Quarry and Landfill Site, Warren Lane, STANWAY, CO3 0NN
Details pursuant to Condition 9 (Noise Monitoring Survey) of Planning permission ESS/06/15/COL for the: Retrospective application for continuation of use of the restored Abbotstone North Landfill Site without compliance with Conditions 2 (Development Details), 3 (Reinstatement Details), 12 (Landscaping Scheme Design), 19 (AoD Levels), and 22 (Aftercare Scheme) attached to planning permission ESS/07/01/COL/REV to allow the retention of amended contours within the Abbotstone North landfill site, along the boundary with the ECC closed landfill and with Public Footpath 15”. Land at Colchester Quarry (Bellhouse), Warren Lane, Colchester, Essex
Reference
ESS/06/15/COL/9/1
Agent
Mrs Sarah Holland
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.