Details pursuant to Schedule 7 (Advanced Planting) of Legal agreement associated with ESS/03/18/BTE. ESS/03/18/BTE was for “Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland)”
Bradwell Quarry, Church Road, Bradwell, CM77 8EP, and land east of Sheepcotes Lane
Details pursuant to Schedule 7 (Advanced Planting) of Legal agreement associated with ESS/03/18/BTE. ESS/03/18/BTE was for “Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland)”
Reference
ESS/03/18/BTE/LA1
Agent
Mr Steven Smith
Sign in to view all collected council fields and recorded changes.
Letter to Essex County Council - Site A5 s106 Sch 7 - 2020-02-26_Redacted.pdfLetter to Essex County Council - Site A5 s106 Sch 7 - 2020-02-26_Redacted.pdf6 Mar 2020View
020-01-L2_Bradwell Sites A6 and A7 Visual Apprasial_Redacted.pdf020-01-L2_Bradwell Sites A6 and A7 Visual Apprasial_Redacted.pdf6 Mar 2020View
A7_Site A7 ZTV.pdfA7_Site A7 ZTV.pdf6 Mar 2020View
A6_Site A6 ZTV.pdfA6_Site A6 ZTV.pdf6 Mar 2020View
26-2-20 Agent Email scheme of a scheme of advanced planting for Mineral Local Plan 2014 Reserve Sites A6 and A7.26-2-20 Agent Email scheme of a scheme of advanced planting for Mineral Local Plan 2014 Reserve Sites A6 and A7.6 Mar 2020View
A6_Rev B_Advanced Planting ProposalsA6_Rev B_Advanced Planting Proposals27 Mar 2020View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.