Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Trinity Road Primary School, Trinity Road, Chelmsford, CM2 6HS
Last published check: 28 Sept 2026, 10:30. Check the council record for more recent changes.
Trinity Road Primary School, Trinity Road, Chelmsford, CM2 6HS
This record has no verified map location.
The demolition of an existing HORSA building and the erection of a single storey standalone building comprising of 2no. classrooms, kitchen, multi use hall and associated ancillary accommodation to accommodate an additional 105 pupils (2FE Primary School). The provision of a new reception canopy, new cycle/scooter parking and associated works. The provision of an new pedestrian access gate from Trinity Road
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Decision NoticeDecision Notice | 27 Oct 2021 | View |
| DELEGATED REPORT_CC-CHL-76-21.docDELEGATED REPORT_CC-CHL-76-21.doc | 27 Oct 2021 | View |
| Application Form - Without Personal DataApplication Form - Without Personal Data | 5 Aug 2021 | View |
| Flood risk assessmentFlood risk assessment | 5 Aug 2021 | View |
| School Travel PlanSchool Travel Plan | 5 Aug 2021 | View |
| Land contamination assessment Phase 1Land contamination assessment Phase 1 | 5 Aug 2021 | View |
| Landscape Softworks Performance SpecificationLandscape Softworks Performance Specification | 5 Aug 2021 | View |
| Landscape Management PlanLandscape Management Plan | 5 Aug 2021 | View |
| Proposed Internal lightingProposed Internal lighting | 5 Aug 2021 | View |
| Transport StatementTransport Statement | 5 Aug 2021 | View |
| Essex Biodiversity ChecklistEssex Biodiversity Checklist | 5 Aug 2021 | View |
| A summary of the attachments in the proposalA summary of the attachments in the proposal | 5 Aug 2021 | View |
| Environmental Noise SurveyEnvironmental Noise Survey | 18 Aug 2021 | View |
| Acoustic Consultancy ReportAcoustic Consultancy Report | 18 Aug 2021 | View |
| Archaeological Desk-Based AssessmentArchaeological Desk-Based Assessment | 18 Aug 2021 | View |
| Preliminary Ecological AssessmentPreliminary Ecological Assessment | 18 Aug 2021 | View |
| Land contamination assessment Phase 2Land contamination assessment Phase 2 | 18 Aug 2021 | View |
| Biodiversity Net Gain ReportBiodiversity Net Gain Report | 18 Aug 2021 | View |
| Arboricultural SurveyArboricultural Survey | 18 Aug 2021 | View |
| Arboricultural Method StatementArboricultural Method Statement | 18 Aug 2021 | View |
| Arboricultural Impact AssessmentArboricultural Impact Assessment | 18 Aug 2021 | View |
| Planning StatementPlanning Statement | 18 Aug 2021 | View |
| Drainage Strategy ReportDrainage Strategy Report | 18 Aug 2021 | View |
| BB103 Existing & Proposed AnalysisBB103 Existing & Proposed Analysis | 5 Aug 2021 | View |
| Indicative External Lighting LayoutIndicative External Lighting Layout | 5 Aug 2021 | View |
| Indicative External Service LayoutIndicative External Service Layout | 5 Aug 2021 | View |
| Surface Water Drainage Overland Flow RoutesSurface Water Drainage Overland Flow Routes | 5 Aug 2021 | View |
| Surface Water Drainage Contribution AreaSSurface Water Drainage Contribution AreaS | 5 Aug 2021 | View |
| Existing DrainageExisting Drainage | 5 Aug 2021 | View |
| Building General ArrangementBuilding General Arrangement | 5 Aug 2021 | View |
| MUGA General ArrangementMUGA General Arrangement | 5 Aug 2021 | View |
| Vehicle Swept Path Fire TenderVehicle Swept Path Fire Tender | 5 Aug 2021 | View |
| General Arrangement Location PLanGeneral Arrangement Location PLan | 5 Aug 2021 | View |
| Proposed Phasing and Access PlanProposed Phasing and Access Plan | 5 Aug 2021 | View |
| Existing Site PlanExisting Site Plan | 5 Aug 2021 | View |
| Existing Site SectionExisting Site Section | 5 Aug 2021 | View |
| Existing Elevations - Main School BuildingExisting Elevations - Main School Building | 5 Aug 2021 | View |
| Existing Elevations - HORSAExisting Elevations - HORSA | 5 Aug 2021 | View |
| Proposed Roof PlanProposed Roof Plan | 5 Aug 2021 | View |
| Proposed GA SectionsProposed GA Sections | 5 Aug 2021 | View |
| The Location PlanThe Location Plan | 10 Aug 2021 | View |
| Proposed Lighting LayoutProposed Lighting Layout | 8 Sept 2021 | View |
| General arrangement SHeet 1 of 2General arrangement SHeet 1 of 2 | 8 Sept 2021 | View |
| Surfacel Water Drainage StrategySurfacel Water Drainage Strategy | 8 Sept 2021 | View |
| Design & Access StatementDesign & Access Statement | 8 Sept 2021 | View |
| Email from the Agent dated 06/10/2021 containing addiotnal information/documentationEmail from the Agent dated 06/10/2021 containing addiotnal information/documentation | 6 Oct 2021 | View |
| Trinity Street View Sketch - Planning AmendmentTrinity Street View Sketch - Planning Amendment | 6 Oct 2021 | View |
| Conservation Hertiage Statement 02Conservation Hertiage Statement 02 | 6 Oct 2021 | View |
| Floor PlanFloor Plan | 8 Sept 2021 | View |
| Proposed Site SectionProposed Site Section | 8 Sept 2021 | View |
| Proposed Site PlanProposed Site Plan | 8 Sept 2021 | View |
| Proposed ElevationsProposed Elevations | 8 Sept 2021 | View |
| Contours and levelsContours and levels | 8 Sept 2021 | View |
| Foul Water Drainage StrategyFoul Water Drainage Strategy | 8 Sept 2021 | View |
| Foul and Surface Water Drainage OverlayFoul and Surface Water Drainage Overlay | 8 Sept 2021 | View |
| Landscape ProposalLandscape Proposal | 8 Sept 2021 | View |
| Extended Landscape ProposalExtended Landscape Proposal | 8 Sept 2021 | View |
| Elevation Analysis Pitch RoofElevation Analysis Pitch Roof | 6 Oct 2021 | View |
| SUPERSEDED - The location planSUPERSEDED - The location plan | 5 Aug 2021 | View |
| Site NoticeSite Notice | 11 Aug 2021 | View |
| Cllr Mike Mackrory - ECC Springfield - Consultation ResponseCllr Mike Mackrory - ECC Springfield - Consultation Response | 23 Aug 2021 | View |
| Sport England ResponseSport England Response | 26 Aug 2021 | View |
| Essex Fire & Rescue - South EastEssex Fire & Rescue - South East | 2 Sept 2021 | View |
| Chelmsford City CouncilChelmsford City Council | 9 Sept 2021 | View |
| Place Services Consultation Response (Email)Place Services Consultation Response (Email) | 15 Sept 2021 | View |
| Place Services Consultation Response (Attachment)Place Services Consultation Response (Attachment) | 15 Sept 2021 | View |
| Not for Web - Highways - Strategic Development Consultation Response (Email)Not for Web - Highways - Strategic Development Consultation Response (Email) | 29 Sept 2021 | View |
| Highways - Strategic Development Consultation Response (Attachment)Highways - Strategic Development Consultation Response (Attachment) | 29 Sept 2021 | View |
| Place ServicesPlace Services | 26 Oct 2021 | View |
| Place ServicesPlace Services | 26 Oct 2021 | View |
| SUDs ResponseSUDs Response | 3 Dec 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.