Council planning record

Removal of existing pond outlet pipe and replacement with a new outlet pipe 0.5m lower to increase flood storage; installation of sheet piling to reinforce existing embankment; creation of a new access track on top of existing embankment; creation of temporary access track for construction off Queens Road

The Ursuline High School, Queens Road, Brentwood, CM14 4EX

Decision MadeReference: CC/BRW/62/21Essex County Council

Last published check: 28 Sept 2026, 10:32. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee / Delegated Decision Date

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source
  5. Consultation Start

    Published milestoneCouncil source
  6. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Made
Application type
Full Planning Application CC
Received
4 Jun 2021
Validated
30 Jul 2021
Determination deadline
Not published
Local authority
Essex County Council

Application overview

Removal of existing pond outlet pipe and replacement with a new outlet pipe 0.5m lower to increase flood storage; installation of sheet piling to reinforce existing embankment; creation of a new access track on top of existing embankment; creation of temporary access track for construction off Queens Road

Proposal details

Reference
CC/BRW/62/21
Agent
Mr David Chapman

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Ursuline High School, Queens Road, Brentwood, CM14 4EX

This record has no verified map location.

Documents 35 of 35

DocumentPublishedAction
Decision NoticeDecision Notice1 Nov 2021View
Delegated ReportDelegated Report1 Nov 2021View
Application Form - Without Personal DataApplication Form - Without Personal Data7 Jun 2021View
Drainage documentationDrainage documentation7 Jun 2021View
Desk StudyDesk Study7 Jun 2021View
A summary of the attachments in the proposalA summary of the attachments in the proposal7 Jun 2021View
How the fee was calculatedHow the fee was calculated7 Jun 2021View
Heritage StatementHeritage Statement30 Jul 2021View
BRENT D Arb Impact Assessment and Method Statement.pdfBRENT D Arb Impact Assessment and Method Statement.pdf30 Jul 2021View
Tree schedule final.pdfTree schedule final.pdf30 Jul 2021View
BRE Tree Removals Plan-A0 L2.pdfBRE Tree Removals Plan-A0 L2.pdf30 Jul 2021View
BRE Tree Protection Plan-A0 L.pdfBRE Tree Protection Plan-A0 L.pdf30 Jul 2021View
Landscape_Plan.pdfLandscape_Plan.pdf30 Jul 2021View
BRENT-D Planning Statement Final V4.0.pdfBRENT-D Planning Statement Final V4.0.pdf30 Jul 2021View
BRENT-D Flood Risk Assessment Final V0.3.pdfBRENT-D Flood Risk Assessment Final V0.3.pdf30 Jul 2021View
Archaeological AssessmentArchaeological Assessment30 Jul 2021View
Site Location PlanSite Location Plan30 Jul 2021View
Ecological Impact AssessmentEcological Impact Assessment9 Aug 2021View
Site Notice 8th SeptemberSite Notice 8th September25 Aug 2021View
Temporary traffic and pedestrian arrangements 1 of 3Temporary traffic and pedestrian arrangements 1 of 310 Sept 2021View
Temporary traffic and pedestrian arrangements 2 of 3Temporary traffic and pedestrian arrangements 2 of 310 Sept 2021View
Temprorary traffic and pedestrian arrangements 3 of 3Temprorary traffic and pedestrian arrangements 3 of 310 Sept 2021View
EA ChecklistEA Checklist8 Oct 2021View
EA ChecklistEA Checklist28 Oct 2021View
Access and Site Set UpAccess and Site Set Up7 Jun 2021View
Cross Sections and Long SectionsCross Sections and Long Sections7 Jun 2021View
Vegetation Removal PlanVegetation Removal Plan7 Jun 2021View
Option 1 1.33% AEP Event Flood ExtentOption 1 1.33% AEP Event Flood Extent7 Jun 2021View
Do Nothing 1.33% AEP Event Flood ExtentDo Nothing 1.33% AEP Event Flood Extent7 Jun 2021View
Works PlanWorks Plan7 Jun 2021View
Site NoticeSite Notice4 Aug 2021View
Place Sevices Consultation Response (Attachment)Place Sevices Consultation Response (Attachment)1 Sept 2021View
Place Sevices Consultation Response (Email)Place Sevices Consultation Response (Email)1 Sept 2021View
Strategic DevelopmentStrategic Development1 Oct 2021View
Sport EnglandSport England14 Oct 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.