The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan received on the 14th of March 2025 Front Elevation – Existing & Proposed received on the 23rd of May 2025 Side Elevation – Existing & Proposed received on the 23rd of May 2025 Site Plan – Existing & Proposed received on the 23rd of May 2025 Green Infrastructure Statement dated the 21st of May 2025 Email Correspondence from the Applicant dated the 9th of July 2025 confirming materials and staining/colour
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan received on the 14th of March 2025 Front Elevation – Existing & Proposed received on the 23rd of May 2025 Side Elevation – Existing & Proposed received on the 23rd of May 2025 Site Plan – Existing & Proposed received on the 23rd of May 2025 Green Infrastructure Statement dated the 21st of May 2025 Email Correspondence from the Applicant dated the 9th of July 2025 confirming materials and staining/colour
Notwithstanding the biodiversity enhancement measures contained in the Green Infrastructure Statement dated the 21st of May 2025, no Rhododendron ponticum is to be planted. The proposed bird box is to be located on a north/northeast facing elevation and the proposed bat box and insect brick is to be located on a south facing elevation. All provisions relating to bats, birds and insects should be of a woodcrete/woodstone construction
Er gwaethaf y mesurau gwella bioamrywiaeth a gynhwysir yn y 'Green Infrastructure Statement dated the 21st of May 2025', ni ddylid plannu Rhododendron ponticum. Mae'r blwch adar arfaethedig i'w leoli ar ddrychiad sy'n wynebu'r gogledd/gogledd-ddwyrain a'r blwch ystlumod a'r fricsen bryfed arfaethedig i'w lleoli ar ddrychiad sy'n wynebu'r de. Dylai pob darpariaeth sy'n ymwneud ag ystlumod, adar a phryfed fod o adeiladwaith concrit pren/carreg bren
Within 6 months from the date of this permission, the biodiversity enhancement measures contained in the Green Infrastructure Statement and referred to in condition 2 & 3 must be implemented in full accordance with these details
O fewn 6 mis i ddyddiad y caniatâd hwn, rhaid gweithredu'r mesurau gwella bioamrywiaeth a gynhwysir yn y 'Green Infrastructure Statement' ac y cyfeirir atynt yn amod 2 a 3 yn unol yn llawn â'r manylion hyn
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To prevent the planting of an invasive species of rhododendron and to secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn atal plannu rhywogaeth ymledol o rododendron a sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.