The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Wakemans Green Infrastructure Statement – Issued the 13th of February 2026 Site Location Plan (Drawing No: 25309-001 Rev A) – Received the 13th of February 2026 Existing Site Plan (Drawing No: 25309-002 Rev A) Existing Ground Floor Plan (Drawing No: 25293-003 Existing Lower Ground Floor Plan (Drawing No: 25293-004) Existing Elevations 1 (25293-005) Existing Elevations 2 (25293-006) Proposed Ground Floor Plan (Drawing No: 25293-007) Proposed Lower Ground Floor Plan (Drawing No: 25293-008) Proposed Elevations 1 (25293-009) Proposed Elevations 2 (25293-010)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Wakemans Green Infrastructure Statement – Issued the 13th of February 2026 Site Location Plan (Drawing No: 25309-001 Rev A) – Received the 13th of February 2026 Existing Site Plan (Drawing No: 25309-002 Rev A) Existing Ground Floor Plan (Drawing No: 25293-003 Existing Lower Ground Floor Plan (Drawing No: 25293-004) Existing Elevations 1 (25293-005) Existing Elevations 2 (25293-006) Proposed Ground Floor Plan (Drawing No: 25293-007) Proposed Lower Ground Floor Plan (Drawing No: 25293-008) Proposed Elevations 1 (25293-009) Proposed Elevations 2 (25293-010)
Within three months of the commencement of the development, the 2 bat boxes specified in the Green Infrastructure Statement (received 13/02/2026) hereby approved shall be installed on the north facing elevation (as shown on Drawing No: 25293-010). The two bird boxes specified in the Green Infrastructure Satetment shall be installed at least 2m high on the south facing elevation. These biodiversity enhancements shall thereafter be retained for the lifetime of the development and any subsequent replacements shall be of an equivalent specification.
O fewn tri mis i ddechrau'r datblygiad, rhaid gosod y 2 flwch ystlumod a bennir yn y Datganiad Seilwaith Gwyrdd (a dderbyniwyd 13/02/2026) a gymeradwywyd drwy hyn ar y drychiad sy'n wynebu'r gogledd (fel y dangosir ar Lun Rhif: 25293-010). Rhaid gosod y ddau flwch adar a bennir yn y Datganiad Seilwaith Gwyrdd o leiaf 2m o uchder ar y drychiad sy'n wynebu'r de. Rhaid cadw'r gwelliannau bioamrywiaeth hyn wedi hynny am oes y datblygiad a rhaid i unrhyw rai a ailosodir wedi hynny fod o fanyleb gyfwerth.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
I sicrhau gwelliant mewn bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.