The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • 103/001B Proposed Canopy House Elevations April 2023 • 103/002A Proposed Canopy (Detail) July 2023 • 103/003B Site Plan May 2023 • 103/004 Glass Canopy Details January 2024 • Site Location Plan dated 27/12/2023 • I12PRTHGWNMTWRGFBCC.09D - Received 15/08/2024 • 103 – Porth Gwyn, Tan-y-bwlch, Blaenau Ffestiniog. LL41 3YU – Heritage Impact Statement – Revision B – 16 August 2024 – proposed external lighting omitted. • Wake, K., November 2023, Porth Gwyn Lodge, Maentwrog: Update Bat Survey, Reference EE.3726.23.KW, Enfys Ecology Ltd. • Marshalls Fairstone Sawn Sandstone Setts in Autumn Brown – Paving (Received 26/02/2024) • Porth Gwyn, Tan y Bwlch – Biodiversity Plan (Received 16/09/24) • Green Infrastructure Statement and Biodiversity Enhancement Scheme (Received 16/09/24)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 103/001B Proposed Canopy House Elevations April 2023 • 103/002A Proposed Canopy (detail) July 2023 • 103/003B Site Plan May 2023 • 103/004 Glass Canopy Details January 2024 • Site Location Plan - Dyddiedig 27/12/2023 • I12PRTHGWNMTWRGFBCC.09D - Derbynwyd 15/08/2024 • 103 – Porth Gwyn, Tan-y-bwlch, Blaenau Ffestiniog. LL41 3YU – Heritage Impact Statement – Revision B – 16 August 2024 – proposed external lighting omitted. • Wake, K., November 2023, Porth Gwyn Lodge, Maentwrog: Update Bat Survey, Reference EE.3726.23.KW, Enfys Ecology Ltd. • Marshalls Fairstone Sawn Sandstone Setts in Autumn Brown – Paving (Derbynwydd 26/02/2024) • Porth Gwyn, Tan y Bwlch – Biodiversity Plan (Derbynwyd 16/09/24) • Green Infrastructure Statement and Biodiversity Enhancement Scheme (Derbynwyd 16/09/24)
The biodiversity enhancement and mitigation methods outlined in Section 6 of the submitted ‘Wake, K., November 2023, Porth Gwyn Lodge, Maentwrog: Update Bat Survey, Reference EE.3726.23.KW, Enfys Ecology Ltd.’ report shall be followed and implemented in full within 3 months of the substantial completion of the development. This includes the Bat Mitigation and Enhancement measures shown in Figures 6.2 and 6.3 of the Report.
Dilynir y dulliau lliniaru a gwella bioamrywiaeth a amlinellwyd yn Adran 6 o adroddiad 'Wake, K., November 2023, Porth Gwyn Lodge, Maentwrog: Update Bat Survey, Reference EE.3726.23.KW, Enfys Ecology Ltd.' a gweithredu'n llawn o fewn 3 mis i gwblhau'r datblygiad yn sylweddol. Mae hyn yn cynnwys y mesurau Lliniaru a Gwella Ystlumod a ddangosir yn Ffigurau 6.2 a 6.3 yr Adroddiad.
The biodiversity enhancement measures shown on the ‘Porth Gwyn, Tan y Bwlch - Biodiversity Plan’ shall take place within 3 months of the substantial completion of the development hereby permitted.
Bydd y mesurau gwella bioamrywiaeth a ddangosir ar y ‘Porth Gwyn, Tan y Bwlch - Biodiversity Plan’ yn digwydd o fewn 3 mis i gwblhau’r datblygiad a ganiateir drwy hyn yn sylweddol
The external paving shall be of ‘Autumn bronze sandstone setts’ material or an appropriate alternative, details of which shall be provided and approved in writing by means of a formal application to the Local Planning Authority. The details hereby approved shall be retained thereafter
Rhaid i’r palmant allanol fod o ddeunydd ‘Autumn bronze sandstone setts’, fel y manylir arno yn Amod 2 uchod, neu ddewis arall priodol, a rhaid darparu a chymeradwyo’r manylion yn ysgrifenedig trwy gais ffurfiol i’r Awdurdod Cynllunio Lleol. Bydd y manylion a ganiateir drwy hyn yn cael eu cadw wedi hynny
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure the protection of bats and their breeding and nesting spaces as protected under the Conservation of Habitats and Species regulations 2017 (as amended) and comply with Development Policy 2 of the adopted Eryri Local Development Plan and Planning Policy Wales
Sicrhau bod ystlumod a’u mannau magu a nythu yn cael eu gwarchod fel y’u gwarchodir o dan Reoliadau Gwarchod Cynefinoedd a Rhywogaethau 2017 (fel y’i diwygiwyd) a chydymffurfio â Pholisi Datblygu 2 o Gynllun Datblygu Lleol Eryri mabwysiedig a Pholisi Cynllunio Cymru
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri mabwysiedig a pharagraff 6.4.5 Polisi Cynllunio Cymru
To protect the character and appearance of the building and its setting in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular Policies A, Ff, 1, 6, and 7
Gwarchod cymeriad ac edrychiad yr adeilad a'i osodiad yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn arbennig Polisïau A, Ff, 1, 6, a 7
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.