Council planning record

Listed Building Consent for the removal of cement mortar from the stonework of the two main chimney stacks and installation of new cast aluminium ogee profile gutters and round downpipes brackets and connections and replacement of existing plastic soil vent pipes and sink pipes with cast iron pipes

Bron Turnor Mawr, Maentwrog. LL41 3YT

All consultations completeReference: NP5/73/LB181AEryri National Park

Last published check: 3 Oct 2026, 21:17. Check the council record for more recent changes.

Application location

Bron Turnor Mawr, Maentwrog. LL41 3YT

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Listed Building Consent
Received
21 May 2024
Validated
Not published
Determination deadline
15 Jul 2024
Local authority
Eryri National Park

Application overview

Listed Building Consent for the removal of cement mortar from the stonework of the two main chimney stacks and installation of new cast aluminium ogee profile gutters and round downpipes brackets and connections and replacement of existing plastic soil vent pipes and sink pipes with cast iron pipes

Proposal details

Reference
NP5/73/LB181A
Alternative references
PP-13074356
Ward
Trawsfynydd ED
Parish
Maentwrog
Agent
Mr. Peter Jones-Hughes
UPRN
10094365326

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
CNot publishedView
ENot publishedView
DDMNot publishedView
FFNot publishedView
LL21 May 2024View
S - GAPS10 Jun 2024View
Rh.P21 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Bron Turnor Fawr, Tan-y-Bwlch, Blaenau Ffestiniog, LL41 3YT – Location Plan – PJH/MAEN/01/2024 (17 May 2024) Elevations and Roof Plan as Existing and Proposed (9 May 2024) Sections Through Eaves as Existing and Proposed (9 May 2024) Document 1 – Details of Proposed Ecological Boxes for Bron Turnor Fawr, Tan-y-Bwlch – Proposed Bat Box Product Details. Heritage Impact Statement and Design Statement (14 May 2024)
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Bron Turnor Fawr, Tan-y-Bwlch, Blaenau Ffestiniog, LL41 3YT – Location Plan – PJH/MAEN/01/2024 (17 May 2024) Elevations and Roof Plan as Existing and Proposed (9 May 2024) Sections Through Eaves as Existing and Proposed (9 May 2024) Document 1 – Details of Proposed Ecological Boxes for Bron Turnor Fawr, Tan-y-Bwlch – Proposed Bat Box Product Details. Heritage Impact Statement and Design Statement (14 May 2024)
  5. The raking out/ removal of the cement mortar for the purposes of re-pointing shall be carried out by tools held in the hand and not by power-drive tools.
  6. The re-pointing works shall be carried out only in accordance with the agreed re-pointing and lime mortal details provided in ‘Schedule for repointing the chimney stack with lime mortar’ as referenced in Appendix D of the Heritage Impact Statement and Design Statement.
  7. All existing historical fabric shall be retained in situ, except where indicated otherwise on the approved plans and documents.
  8. The removal and replacement of rainwater goods (including their location, materials, and methods of fixing) shall be carried out only in accordance with the hereby agreed rainwater goods details.
  9. No works other than those referred to in the approved plans and documents are to be carried out without the approval of the Local Planning Authority.
  10. The proposed biodiversity enhancement measures included with the application in the form of the installation of a bat and bird box on site shall be implemented within 6 months following completion of development and maintained thereafter.
  11. Bydd cribinio allan / tynnu'r morter sment at ddibenion ailbwyntio yn cael ei wneud gan offer sy'n cael eu dal yn y llaw ac nid gan offer gyrru p"{er.
  12. Bydd y gwaith ail-bwyntio yn cael ei wneud yn unol â'r manylion ail-bwyntio a marw calch y cytunwyd arnynt a ddarperir yn 'Atodlen ar gyfer ailbwyntio'r corn simnai gyda morter calch' fel y cyfeirir ato yn Atodiad D y Datganiad o'r Effaith ar Dreftadaeth a'r Datganiad Dylunio.
  13. Bydd yr holl ffabrig hanesyddol presennol yn cael ei gadw yn ei le, ac eithrio lle nodir yn wahanol ar y cynlluniau a'r dogfennau a gymeradwywyd.
  14. Rhaid symud ac amnewid nwyddau d"{r glaw (gan gynnwys eu lleoliad, deunyddiau, a dulliau gosod) yn unol â'r manylion nwyddau d"{r glaw a gytunir yma yn unig.
  15. Nid oes unrhyw waith heblaw'r rhai y cyfeirir atynt yn y cynlluniau a'r dogfennau a gymeradwywyd i'w wneud heb gymeradwyaeth yr Awdurdod Cynllunio Lleol.
  16. Bydd y mesurau gwella bioamrywiaeth arfaethedig sydd wedi'u cynnwys gyda'r cais ar ffurf gosod blwch ystlumod ac adar ar y safle yn cael eu gweithredu o fewn 6 mis ar ôl cwblhau'r datblygiad a'u cynnal wedi hynny.
  17. To comply with the Planning (Listed Buildings and Conservation Areas) Act 1990.
  18. I gydymffurfioâ a Ddeddf Cynllunio (Adeiladau Rhestredig ac Ardaloedd Cadwraeth) 1990.
  19. To avoid damage to the listed building.
  20. I osgoi niwed i'r adeilad rhestredig.
  21. To safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
  22. I ddiogelu cymeriad ac edrychiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
  23. To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales.
  24. I sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri a fabwysiadwyd a Pholisi Cynllunio Cymru.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.