The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • 291112-1250-Hafod y Nant Location Plan (Received 02/08/24); • 291111-500-Hafod y Nant Site Plan (Received 02/08/24); • 291111-500-Hafod y Nant Site Elevation (Received 02/08/24); • 01 – Proposed Floor Plan – Boiler and Oil Tank (Received 02/08/24); • 02 – Proposed Floor Plan with Polytunnel (Received 02/08/24); • 03 – Proposed Elevations for House and Windows (Received 02/08/24); • 04 – Existing Elevations for House and Windows (Received 02/08/24); • 05 – Polytunnel Elevations (Received 02/08/24); • Hafod y Nant, Parc -Preliminary Ecological Assessment – 10th July 2024; • Longi datasheet Hi-MO6 LR5-54HTB (Received 02/08/24).
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 291112-1250-Hafod y Nant Location Plan (Received 02/08/24); • 291111-500-Hafod y Nant Site Plan (Received 02/08/24); • 291111-500-Hafod y Nant Site Elevation (Received 02/08/24); • 01 – Proposed Floor Plan – Boiler and Oil Tank (Received 02/08/24); • 02 – Proposed Floor Plan with Polytunnel (Received 02/08/24); • 03 – Proposed Elevations for House and Windows (Received 02/08/24); • 04 – Existing Elevations for House and Windows (Received 02/08/24); • 05 – Polytunnel Elevations (Received 02/08/24); • Hafod y Nant, Parc -Preliminary Ecological Assessment – 10th July 2024; • Longi datasheet Hi-MO6 LR5-54HTB (Received 02/08/24).
No surface water from any increase in the roof area of the building / or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
Ni chaniateir i dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol neu'n anuniongyrchol i'r system garthffosiaeth gyhoeddus.
All mitigation measures set out within the submitted and hereby approved ‘Hafod y Nant, Parc - Preliminary Ecological Assessment – 10th July 2024’ shall be adhered to at all times.
Cydymffurfir bob amser â’r holl fesurau lliniaru a nodir yn yr ‘Hafod y Nant, Parc - Preliminary Ecological Assessment – 10th July 2024’ a gyflwynwyd ac a gymeradwyir yma.
If the solar panels and associated equipment become redundant or obsolete, then the solar panels and equipment must be removed within six months of the development ceasing to operate and the site restored to its former condition
Os daw'r paneli solar a'r offer cysylltiedig yn segur neu'n anarferedig, yna rhaid symud y paneli solar a'r offer o fewn chwe mis ar ôl i'r datblygiad roi'r gorau i weithredu ac adfer y safle i'w gyflwr blaenorol.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
Atal gorlwytho hydrolig o'r system garthffosiaeth gyhoeddus, diogelu iechyd a diogelwch trigolion presennol a sicrhau nad yw'r amgylchedd yn cael ei lygru nac yn cael ei niweidio.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig.
To ensure that the visual impact of the proposed development is minimised if the development becomes redundant in accordance with Eryri Local Development Plan Policies and in particular policy
Er mwyn sicrhau bod effaith weledol y datblygiad arfaethedig yn cael ei leihau os daw'r datblygiad yn ddiangen yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig polisi
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.