The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Location Plan – Dated June 2025 • Elevations as Existing (Drawing No. 25-10-PL03) – Dated June 2025 • Elevations as Proposed – (Drawing No. 25-10-PL07 Rev A) – Dated June 2025 • Ground Floor Plan as Exisitng (Drawing No. 25-10-PL01) – Dated June 2025 • First Floor Plan As Existing (Drawing No. 25-10-PL02) – Dated June 2025 • Ground Floor Plan As Proposed (Drawing No. 25-10-PL05) – Dated June 2025 • First Floor Plan As Proposed (Drawing No. 25-10-PL06) – Dated June 2025 • Green Infrastructure Statement – Received on the 17th of June 2025 • Preliminary Bat Roost Assessment and Bat Survey Report (Version 93600 R1 Rev1) – Dated October 2025 • Bat and Bird Survey Elevations (Drawing No. 25-10-PL10)
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Location Plan – Dyddiedig Mehefin 2025 • Elevations as Existing (Drawing No. 25-10-PL03) – Dyddiedig Mehefin 2025 • Elevations as Proposed – (Drawing No. 25-10-PL07 Rev A) – Dyddiedig Mehefin 2025 • Ground Floor Plan as Exisitng (Drawing No. 25-10-PL01) – Dyddiedig Mehefin 2025 • First Floor Plan As Existing (Drawing No. 25-10-PL02) – Dyddiedig Mehefin 2025 • Ground Floor Plan As Proposed (Drawing No. 25-10-PL05) – Dyddiedig Mehefin 2025 • First Floor Plan As Proposed (Drawing No. 25-10-PL06) – Dyddiedig Mehefin 2025 • Green Infrastructure Statement – Derbynwyd 17 Mehefin 2025 • Preliminary Bat Roost Assessment and Bat Survey Report (Version 93600 R1 Rev1) – Dyddiedig Hydref 2025 • Bat and Bird Survey Elevations (Drawing No. 25-10-PL10)
The biodiversity enhancement measures contained in the Green Infrastructure Statement (Received on the 17th of June 2025) and shown on the Bat and Bird Survey Elevations (Drawing No. 25-10-PL10) shall be implemented within 3 months following the substantial completion of the development hereby permitted and retained thereafter
Rhaid gweithredu'r mesurau gwella bioamrywiaeth sydd wedi'u cynnwys yn y 'Green Infrastructure Statement' (Derbyniwyd 17 Mehefin 2025) ac a ddangosir ar y 'Bat and Bird Survey Elevations (Drawing No. 25-10-PL10)' o fewn 3 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'u cadw wedi hynny.
The mitigation measures set out in Section 6 of the Preliminary Bat Roost Assessment and Bat Survey Report (Version 93600 R1 Rev1) shall be fully implemented and adhered to at all times during the construction phase and thereafter
Rhaid gweithredu'n llawn y mesurau lliniaru a nodir yn Adran 6 o'r 'Preliminary Bat Roost Assessment and Bat Survey Report (Version 93600 R1 Rev1)' a'u dilyn bob amser yn ystod y cyfnod adeiladu ac wedi hynny
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.