The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (Received 15/08/2024) Block Plan (Received 18/09/2024) Rear Elevation Proposed South Elevation (Received 26/09/2024) Valiant Technical Information Green Infrastructure Statement (Received 18/09/2024) MCS Planning Standards for Air Source Heat Pumps
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan (Received 15/08/2024) Block Plan (Received 18/09/2024) Rear Elevation Proposed South Elevation (Received 26/09/2024) Valiant Technical Information Green Infrastructure Statement (Received 18/09/2024) MCS Planning Standards for Air Source Heat Pumps
Within 1 month of the first operation of the development hereby approved a nest box (with a 32 mm diameter hole) shall be installed on the northern elevation in accordance with the plans hereby approved.The nest box (with a 32 mm diameter hole) shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development, any replacements shall be of an equivalent specification
O fewn 1 mis o weithrediad cyntaf y datblygiad a ganiateir drwy hyn rhaid gosod blwch nythu (gyda thwll diamedr 32 mm) ar yr edrychiad gogleddol yn unol â'r cynlluniau a ganiateir drwy hyn. Wedi hynny, bydd y blwch nythu (gyda thwll diamedr 32 mm) yn cael ei gynnal a'i gadw yn unol â chyfarwyddiadau'r gwneuthurwr a'i gadw am oes y datblygiad, rhaid i unrhyw rai sy'n cael eu cyfnewid fod o fanyleb gyfatebol
If the development hereby approved becomes redundant or obsolete, then the air source heat pump and all associated external equipment and fixtures must be removed within six months of the development ceasing to operate
Os daw'r datblygiad a ganiateir drwy hyn yn ddiangen neu'n anarferedig, yna rhaid symud y pwmp gwres ffynhonnell aer a'r holl offer a gosodiadau allanol cysylltiedig o fewn chwe mis i'r dyddiad y daw'r datblygiad i ben
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri mabwysiedig
To safeguard the amenities of the area in accordance with Eryri Local Development Plan Policies and in particular Development Policy 1
Diogelu mwynderau'r ardal yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi Datblygu 1
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.