Council planning record

Reinstate a garden boundary 20 metres in length to the rear (Southeast), to 2 metres height, using a combination of traditional dry-stone walling to 1 metre, with 1 metre wooden fence fixed above

S"{n-y-Wylan, Llandanwg. LL46 2SB

All consultations completeReference: NP5/66/91BEryri National Park

Last published check: 30 Sept 2026, 18:11. Check the council record for more recent changes.

Application location

S"{n-y-Wylan, Llandanwg. LL46 2SB

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
6 May 2025
Validated
Not published
Determination deadline
30 Jun 2025
Local authority
Eryri National Park

Application overview

Reinstate a garden boundary 20 metres in length to the rear (Southeast), to 2 metres height, using a combination of traditional dry-stone walling to 1 metre, with 1 metre wooden fence fixed above

Proposal details

Reference
NP5/66/91B
Alternative references
PP-13891023
Ward
Harlech a Llanbedr ED
Parish
Llanfair
UPRN
10070345816

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
FF14 Apr 2025View
LL14 Apr 2025View
CS14 Apr 2025View
S - Cyngor Cymuned / Community Council21 May 2025View
S - Ecoleg / Ecology 24.06.253 Jul 2025View
RH.P11 Jul 2025View
C211 Jul 2025View
C111 Jul 2025View
E111 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Dispatch date

    Published milestoneCouncil source
  2. Decision date

    Published milestoneCouncil source
  3. Received date

    Published milestoneCouncil source
  4. Registration date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan Proposed Block Plan Drawing 01/B – Rear – Proposed Elevation South East Green Infrastructure Statement – Received 01/07/25
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan Proposed Block Plan Drawing 01/B – Rear – Proposed Elevation South East Green Infrastructure Statement – Received 01/07/25
  5. Prior to any stonework commencing on the site, a trial stonework panel including pointing not less than 2.00 m² shall be constructed. No building operations in stone shall be carried out on the site unless and until the trial panel has been inspected and approved by means of a formal application to the Local Planning Authority. The stonework of the dwellinghouse/ building / extension shall be built in accordance with the approved sample.
  6. Cyn i unrhyw waith cerrig ddechrau ar y safle, mae'n rhaid adeiladu panel o waith cerrig o nid llai na 2m sgwâr a'i bwyntio. Nid oes unrhyw waith adeiladu mewn cerrig i'w gyflawni ar y safle oni bai a hyd nes bod yr Awdurdod Cynllunio Lleol wedi archwilio a chymeradwyo'r panel drwy gais ffurfiol. Mae'n rhaid adeiladu gwaith cerrig yr estyniad yn unol â'r panel a gymeradwywyd.
  7. The biodiversity enhancement measure detailed in the Green Infrastructure Statement received on 01/07/25 and e-mail received on 08/07/25 shall be implemented within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
  8. Dylid gweithredu'r mesur gwella bioamrywiaeth a nodir yn y Datganiad Seilwaith Gwyrdd a dderbyniwyd ar 01/07/25 a'r e-bost a dderbyniwyd ar 08/07/25 o fewn 3 mis wedi i'r datblygiad a ganiateir drwy hyn gael ei gwblhau a dylid ei gadw felly wedi hynny.
  9. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  10. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  11. To define the permission and for the avoidance of doubt.
  12. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  13. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies A, 1, 6 (and 7 if applicable).
  14. Er mwyn sicrhau fod y datblygiad yn edrych yn foddhaol ac y defnyddir deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn enwedig polisïau A, 1, 6 (a 7 os yn berthnasol).
  15. To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales.
  16. I sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru.
  17. Advisory The removal of the existing hedge/ vegetation removal takes place outside of the nesting season of February – August inclusive.
  18. Cyngor Dylid tynnu'r gwrych/llystyfiant presennol y tu allan i'r tymor nythu o fis Chwefror i fis Awst yn gynwysedig.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.