Council planning record

Erection of pitched roof rear porch extension

Maes Teg, Cae Garw, Llanfair. LL46 2RL

All consultations completeReference: NP5/66/245CEryri National Park

Last published check: 3 Oct 2026, 14:51. Check the council record for more recent changes.

Application location

Maes Teg, Cae Garw, Llanfair. LL46 2RL

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
8 Jul 2026
Validated
Not published
Determination deadline
1 Sept 2026
Local authority
Eryri National Park

Application overview

Erection of pitched roof rear porch extension

Proposal details

Reference
NP5/66/245C
Ward
Harlech a Llanbedr ED
Parish
Llanfair
UPRN
10070345936

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
Application_Form_-_Redacted.pdf16 Jul 2026View
3D_Plan.pdf16 Jul 2026View
Description_of_Proposal.pdf16 Jul 2026View
Elevations.pdf16 Jul 2026View
Location_Plan_-_08.07.26.pdf16 Jul 2026View
Photos.pdf16 Jul 2026View
Site_Plan.pdf16 Jul 2026View
Specification.pdf16 Jul 2026View
Green_infrastructure_statement_&_biodiversity_enhancement_scheme.pdf26 Aug 2026View
Rh.P18 Sept 2026View
S - Cyngor Cymuned 21.09.202621 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans and details contained within the application form, and in any other documents accompanying the application, unless condition(s) to amend them is/are included on this planning decision notice:
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod a’r manylion a gynhwysir yn y ffurflen gais, ac mewn unrhyw ddogfennau eraill sy'n cyd-fynd â'r cais, oni bai bod amod(au) i'w diwygio wedi'u cynnwys ar yr hysbysiad penderfyniad cynllunio hwn: • Location & Site plan – received 17/08/26 • Block Plan – received 17/08/26 • Porch elevations - – received 17/08/26 • Design / Specification - – received 17/08/26 • Green Infrastructure Statement dated 11th August 2026
  5. The roof of the porch shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter.
  6. The materials to be used in the construction of the external walls of the porch shall be constructed with materials of the same type, texture and colour as the external walls of the existing dwelling.
  7. The applicant/developer shall ensure that the Biodiversity Enhancement measures detailed in the Green Infrastructure Statement dated 11th August 2026 shall be followed and implemented in full within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
  8. No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
  9. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  10. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  11. To define the permission and for the avoidance of doubt.
  12. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  13. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan policies, and in particular Development Policies 1, 6 and Strategic Policy A.
  14. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials in ccordance with Eryri Local Development Plan Policies and in particular Policies 1, 6.
  15. To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D.
  16. To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
  17. Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau adeiladu lleol priodol, yn unol â pholisïau Cynllun Datblygu Lleol Eryri, ac yn benodol Polisïau Datblygu 1 a 6 a Pholisi Strategol A.
  18. Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri, ac yn benodol Polisïau 1 a 6.
  19. Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig, yn unol â pholisïau Cynllun Datblygu Lleol Eryri, ac yn benodol Polisi D.
  20. To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
  21. Rhaid gorchuddio to'r cyntedd â llechi mwynol naturiol o Gymru, neu â llechi sydd â lliw, gwead a nodweddion hindreulio cyfatebol i'r llechi ar brif do'r annedd, a rhaid eu cynnal a'u cadw wedi hynny.
  22. Rhaid defnyddio deunyddiau o'r un math, gwead a lliw â waliau allanol y t"} presennol ar gyfer waliau allanol y cyntedd.
  23. Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau gwella bioamrywiaeth, a nodir yn y Datganiad Seilwaith Gwyrdd dyddiedig 11 Awst 2026, yn cael eu dilyn a'u gweithredu'n llawn o fewn 3 mis i gwblhau'n sylweddol y datblygiad a ganiateir drwy hyn, a'u bod yn cael eu cadw wedi hynny.
  24. Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau gwella bioamrywiaeth, a nodir yn y Adroddiad Gwyrdd dyddiol 11 Awst 2026, yn cael eu gweithredu'n llawn o fewn 3 mis i'r graddau y mae'n dilyn, a'u bod yn cael eu cadw wedi hynny.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.