The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing A000 - Location Plan • Drawing A002 – Proposed Site Plan • Drawing A003 - Proposed Dark Sky Strategy • Drawing A200- Proposed Ground and First Floor • Drawing A300- Proposed Elevations • Drawing A310 – Proposed Materials Mood Board • Drawing A405 – Proposed Visuals • Caereinion Design Statement • Green Infrastructure Statement, dated 10/11/2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Drawing A000 - Location Plan • Drawing A002 – Proposed Site Plan • Drawing A003 - Proposed Dark Sky Strategy • Drawing A200- Proposed Ground and First Floor • Drawing A300- Proposed Elevations • Drawing A310 – Proposed Materials Mood Board • Drawing A405 – Proposed Visuals • Caereinion Design Statement • Green Infrastructure Statement, dyddiedig 10/11/2025
The biodiversity enhancement measures detailed in the submitted Green Infrastructure Statement and plan dated 10/11/2025 shall be implemented within 6 months following the substantial completion of the development hereby permitted and retained thereafter
Rhaid gweithredu'r mesurau gwella bioamrywiaeth a nodir yn y Datganiad Seilwaith Gwyrdd a'r cynllun a gyflwynwyd dyddiedig 10/11/2025 o fewn 6 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'u cadw wedi hynny
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system
Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol nac yn anuniongyrchol i'r system garthffosiaeth gyhoeddus
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment
Er mwyn atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, er mwyn amddiffyn iechyd a diogelwch trigolion presennol a sicrhau nad oes unrhyw lygredd na niwed i'r amgylchedd
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.