Council planning record

Listed Building Consent to replace storm damaged windows and doors with new double-glazed aluminium windows and doors to match existing.

Coleg Harlech, Harlech. LL46 2PU

All consultations completeReference: NP5/61/LB3ZEryri National Park

Last published check: 3 Oct 2026, 19:46. Check the council record for more recent changes.

Application location

Coleg Harlech, Harlech. LL46 2PU

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Listed Building Consent
Received
28 Oct 2025
Validated
Not published
Determination deadline
22 Dec 2025
Local authority
Eryri National Park

Application overview

Listed Building Consent to replace storm damaged windows and doors with new double-glazed aluminium windows and doors to match existing.

Proposal details

Reference
NP5/61/LB3Z
Alternative references
PP-14432881
Ward
Harlech a Llanbedr ED
Parish
Harlech
Agent
Mr. Rhys Davies
UPRN
10070345958

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
E1Not publishedView
C2Not publishedView
C1Not publishedView
LLNot publishedView
FFNot publishedView
S - Cyngor Cymuned / Community Council 04.11.255 Nov 2025View
S - Adfer Conservation 06.11.257 Nov 2025View
S - Twenteeth Century Society18 Nov 2025View
CD18 Dec 2025View
CD28 Dec 2025View
CD38 Dec 2025View
CD48 Dec 2025View
CD58 Dec 2025View
CD68 Dec 2025View
CD78 Dec 2025View
CD88 Dec 2025View
CD98 Dec 2025View
S - Cyngor Cymuned / Community Council 13.01.2614 Jan 2026View
RhP15 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: • 405[4] – S101 – Site Location Plan – Dated 08/07/2025 • 405[3]adr – HIA – Glazing – F1 – Dated 21/11/2024 • 405[4] – L111 – General arrangement: lower basement floor plan – theatre – Dated 08/07/2025 • 405[4] – L112 – General arrangement: basement floor plan – theatre – Dated 08/07/2025 • 405[4] – L113A – General arrangement: ground floor plan – theatre – Dated 23/10/2025 • 405[4] – L114A - General arrangement: Existing east facing elevation – Dated 23/10/2025 • 405[4] – L115A - General arrangement: Existing south facing elevation – Dated 23/10/2025 • 405[4] – L116A - General arrangement: Existing west facing elevation – Dated 23/10/2025 • 405[4] – L117A - General arrangement: Existing north facing elevation – Dated 23/10/2025 • 405[4] – L118 - General arrangement: Proposed east facing elevation – Dated 08/07/2025 • 405[4] – L119A - General arrangement: Proposed south facing elevation – Dated 23/10/2025 • 405[4] – L120 - General arrangement: Proposed west facing elevation – Dated 08/07/2025 • 405[4] – L121 - General arrangement: Proposed north facing elevation – Dated 08/07/2025 • Option 2 – SCW curtain wall system – Rev A – Received 05/12/2025 • 405[4] – C01A – component detail: external openings 01 – Dated 05/12/2025 • 405[4] – C02A – component detail: external openings 02 – Dated 05/12/2025 • 405[4] – C03A – component detail: external openings 03 – Dated 05/12/2025 • 405[4] – C04A – component detail: external openings 04 – Dated 05/12/2025 • 405[4] – C05A – component detail: external openings 05 – Dated 05/12/2025 • 405[4] – C06A – component detail: external openings 06 – Dated 05/12/2025 • 405[4] – C07A – component detail: external openings 07 – Dated 05/12/2025 • 405[4] – C08 - component detail: external openings 08 – Dated 22/10/2025 • 405[4] – C09A – component detail: external openings 09 – Dated 05/12/2025
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 405[4] – S101 – Site Location Plan – Dyddiedig 08/07/2025 • 405[3]adr – HIA – Glazing – F1 – Dyddiedig 21/11/2024 • 405[4] – L111 – General arrangement: lower basement floor plan – theatre – Dyddiedig 08/07/2025 • 405[4] – L112 – General arrangement: basement floor plan – theatre – Dyddiedig 08/07/2025 • 405[4] – L113A – General arrangement: ground floor plan – theatre – Dyddiedig 23/10/2025 • 405[4] – L114A - General arrangement: Existing east facing elevation – Dyddiedig 23/10/2025 • 405[4] – L115A - General arrangement: Existing south facing elevation – Dyddiedig 23/10/2025 • 405[4] – L116A - General arrangement: Existing west facing elevation – Dyddiedig 23/10/2025 • 405[4] – L117A - General arrangement: Existing north facing elevation – Dyddiedig 23/10/2025 • 405[4] – L118 - General arrangement: Proposed east facing elevation – Dyddiedig 08/07/2025 • 405[4] – L119A - General arrangement: Proposed south facing elevation – Dyddiedig 23/10/2025 • 405[4] – L120 - General arrangement: Proposed west facing elevation – Dyddiedig 08/07/2025 • 405[4] – L121 - General arrangement: Proposed north facing elevation – Dyddiedig 08/07/2025 • Option 2 – SCW curtain wall system – Rev A – Derbynwyd 05/12/2025 • 405[4] – C01A – component detail: external openings 01 – Dyddiedig 05/12/2025 • 405[4] – C02A – component detail: external openings 02 – Dyddiedig 05/12/2025 • 405[4] – C03A – component detail: external openings 03 – Dyddiedig 05/12/2025 • 405[4] – C04A – component detail: external openings 04 – Dyddiedig 05/12/2025 • 405[4] – C05A – component detail: external openings 05 – Dyddiedig 05/12/2025 • 405[4] – C06A – component detail: external openings 06 – Dyddiedig 05/12/2025 • 405[4] – C07A – component detail: external openings 07 – Dyddiedig 05/12/2025 • 405[4] – C08 - component detail: external openings 08 – Dyddiedig 22/10/2025 • 405[4] – C09A – component detail: external openings 09 – Dyddiedig 05/12/2025
  5. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  6. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  7. To define the permission and for the avoidance of doubt.
  8. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.