The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing no 1637-02-01-01 Location Plan Drawing no 1637-02-02-01 Site Layout Plan - received 12/05/26 Drawing no 1637-02-03-02 – Proposed Floor Plans - received 12/05/26 Drawing no 1637-02-04-02 – Proposed Elevations - received 12/05/26 Green Infrastructure Statement dated 13/03/26
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Drawing no 1637-02-01-01 Location Plan Drawing no 1637-02-02-01 Site Layout Plan - received 12/05/26 Drawing no 1637-02-03-02 – Proposed Floor Plans - received 12/05/26 Drawing no 1637-02-04-02 – Proposed Elevations - received 12/05/26 Green Infrastructure Statement dated 13/03/26
The applicant/developer shall ensure that the Biodiversity Enhancement measures detailed in Green Infrastructure Statement dated 13/03/26 shall be followed and implemented in full within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau Gwella Bioamrywiaeth a nodir yn y Datganiad Seilwaith Gwyrdd dyddiedig 13/03/26 yn cael eu dilyn a'u gweithredu'n llawn o fewn 3 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'i gadw wedi hynny.
Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol nac yn anuniongyrchol i'r system garthffosiaeth gyhoeddus.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D.
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D.
Er mwyn atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, er mwyn amddiffyn iechyd a diogelwch trigolion presennol a sicrhau nad oes unrhyw lygredd na niwed i'r amgylchedd.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.