Council planning record

Listed Building Consent for alterations to include replacement of porch, replace canopy with new glazed extension, reinstating openings in external walls, new opening between kitchen and dining area, new internal timber stud partitions, and new block paving to external area.

Cors y Gedol, Dyffryn Ardudwy. LL44 2RJ

All consultations completeReference: NP5/58/LB95BEryri National Park

Last published check: 2 Oct 2026, 13:34. Check the council record for more recent changes.

Application location

Cors y Gedol, Dyffryn Ardudwy. LL44 2RJ

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Listed Building Consent
Received
15 Nov 2024
Validated
Not published
Determination deadline
9 Jan 2025
Local authority
Eryri National Park

Application overview

Listed Building Consent for alterations to include replacement of porch, replace canopy with new glazed extension, reinstating openings in external walls, new opening between kitchen and dining area, new internal timber stud partitions, and new block paving to external area.

Proposal details

Reference
NP5/58/LB95B
Alternative references
PP-13468475_C
Agent
Mr. Rhys Davies
UPRN
200003204966

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 25 of 25

DocumentPublishedAction
C4Not publishedView
C3Not publishedView
C2Not publishedView
C1Not publishedView
E1Not publishedView
E3Not publishedView
E2Not publishedView
C16Not publishedView
C15Not publishedView
C14Not publishedView
C13Not publishedView
C11Not publishedView
C10Not publishedView
C9Not publishedView
CSNot publishedView
LLNot publishedView
FFNot publishedView
S - Cyngor Cymuned / Community Council5 Dec 2024View
419(3)03A-Proposed_ground_floor_plan_(1_100_overview).pdf13 Mar 2025View
419(3)04A-Proposed_ground_floor_plan_(1_50).pdf13 Mar 2025View
419(3)05A-Proposed_elevations_(sheet_1).pdf13 Mar 2025View
419(3)06B-Proposed_elevations_(sheet_2).pdf13 Mar 2025View
419(3)11A-Reinstated_opening_in_north_elevation.pdf13 Mar 2025View
419(3)13-Replacement_porch.pdf13 Mar 2025View
Rh.p21 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: • 419(1)03 – existing basement plan (dated 14/10/22) • 419(1)04_A – existing ground floor plan (dated 14/10/22) • 419(1)06 – existing elevations (dated 21/10/22) • 419(1)07 – existing elevations (dated 21/10/22) • 419(3)01 – site location plan (dated 07/10/24) • 419(3)02 – site layout plan (dated 07/10/24) • 419(3)03A – proposed ground floor plan (1_100 overview) – (received 14/02/25) • 419(3)04A – proposed ground floor plan (1_50 overview) – (received 14/02/25) • 419(3)05A – proposed elevations (received 14/02/25) • 419(3)06B - proposed elevations (received 14/02/25) • 419(3)07_A – Section a (dated 07/10/24) • 419(3)08 – Section b (dated 07/10/24) • 419(3)09 – proposed glazed extension (dated 07/10/24) • 419(3)11A – reinstated opening in north elevation (received 14/02/25) • 419(3)012 – reinstated opening between hall and new dining room (dated 07/10/24) • 419(03)13 – Replacement porch • 419(3)A01 – New ground floor (limecrete) (dated 08/10/24) • 419(3)A02 – New internal partitions (dated 08/10/24) • 419(3)adr – HIA – f1 • 419adr_ENPA extra sheet • 419adr_ENPA Green Infrastructure Statement • Details received via email on the 21st of January 2025. • SolarLux Ecoline S Highline S brochure (received 21/01/25)
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 419(1)03 – existing basement plan (dated 14/10/22) • 419(1)04_A – existing ground floor plan (dated 14/10/22) • 419(1)06 – existing elevations (dated 21/10/22) • 419(1)07 – existing elevations (dated 21/10/22) • 419(3)01 – site location plan (dated 07/10/24) • 419(3)02 – site layout plan (dated 07/10/24) • 419(3)03A – proposed ground floor plan (1_100 overview) – (received 14/02/25) • 419(3)04A – proposed ground floor plan (1_50 overview) – (received 14/02/25) • 419(3)05A – proposed elevations (received 14/02/25) • 419(3)06B - proposed elevations (received 14/02/25) • 419(3)07_A – Section a (dated 07/10/24) • 419(3)08 – Section b (dated 07/10/24) • 419(3)09 – proposed glazed extension (dated 07/10/24) • 419(3)11A – reinstated opening in north elevation (received 14/02/25) • 419(3)012 – reinstated opening between hall and new dining room (dated 07/10/24) • 419(03)13 – Replacement porch • 419(3)A01 – New ground floor (limecrete) (dated 08/10/24) • 419(3)A02 – New internal partitions (dated 08/10/24) • 419(3)adr – HIA – f1 • 419adr_ENPA extra sheet • 419adr_ENPA Green Infrastructure Statement • Details received via email on the 21st of January 2025. • SolarLux Ecoline S Highline S brochure (received 21/01/25)
  5. 3) The limestone of the hereby approved porch shall match that of the existing limestone at Cors y Gedol Farmhouse.
  6. 4) Before the new doors are installed, details of the colour/finish and any door furniture in the form of scale drawings, shall be submitted to and agreed in writing by the Local Planning Authority by means of a formal application. The works shall be carried out only in accordance with the agreed details.
  7. 5) Details of any services required for the hereby approved shower room and WC shall be submitted to and agreed in writing by the Local Planning Authority by means of a formal application. The works shall be carried out only in accordance with the agreed details.
  8. 6) No surface works to the rear yard shall take place until samples of the paving blocks have been submitted to and agreed in writing by the Local Planning Authority by means of a formal application. The works shall be carried out only in accordance with the agreed details.
  9. Rhaid i galchfaen y porth a ganiateir drwy hyn gydweddu â'r calchfaen presennol yn Ffermdy Cors y Gedol.
  10. Cyn gosod y drysau newydd rhaid cyflwyno i'r Awdurdod Cynllunio Lleol a chytuno arno'n ysgrifenedig drwy gais ffurfiol am fanylion y lliw/gorffeniad ac unrhyw ddodrefn drws ar ffurf lluniadau wrth raddfa. Bydd y gwaith yn cael ei wneud yn unol â'r manylion y cytunwyd arnynt yn unig.
  11. Bydd manylion unrhyw wasanaethau sydd eu hangen ar gyfer yr ystafell gawod a'r toiled a ganiateir yma yn cael eu cyflwyno i'r Awdurdod Cynllunio Lleol a'u cytuno'n ysgrifenedig ganddo drwy gais ffurfiol. Bydd y gwaith yn cael ei wneud yn unol â'r manylion y cytunwyd arnynt yn unig.
  12. No surface works to the rear yard shall take place until samples of the paving blocks have been submitted to and agreed in writing by the Local Planning Authority by means of a formal application. The works shall be carried out only in accordance with the agreed details.
  13. To Comply with the Historic Environment (Wales) Act 2023.
  14. I gydymffurfio a Deddf yr Amgylchedd Hanesyddol (Cymru) 2023.
  15. To define the permission and for the avoidance of doubt.
  16. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  17. 3) To safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
  18. 4 To safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
  19. 5) To safeguard the character and appearance of the listed building and to ensure a satisfactory standard of development in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
  20. 5) To safeguard the character and appearance of the listed building and to ensure a satisfactory standard of development in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
  21. I ddiogelu cymeriad ac edrychiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
  22. I ddiogelu cymeriad ac edrychiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
  23. I ddiogelu cymeriad ac edrychiad yr adeilad rhestredig a sicrhau safon foddhaol o ddatblygiad yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
  24. I ddiogelu cymeriad ac edrychiad yr adeilad rhestredig a sicrhau safon foddhaol o ddatblygiad yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.