Listed Building Consent to install photovoltaic panels on kitchen roof, to renew the oak beam in the lobby, and to retain unauthorised works, including the rebuilding of two chimneys, renewing an oak beam above the main staircase, removal of areas of internal plaster, alterations to previously approved bathroom and shower room layouts, and installing an additional paved area to the north side garden (Re-Submission)
Taltreuddyn Fawr, Dyffryn Ardudwy. LL44 2RQ
All consultations completeReference: NP5/58/LB443QEryri National Park
Last published check: 3 Oct 2026, 06:27. Check the council record for more recent changes.
Application location
Taltreuddyn Fawr, Dyffryn Ardudwy. LL44 2RQ
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Listed Building Consent
Received
16 Jun 2025
Validated
Not published
Determination deadline
10 Aug 2025
Local authority
Eryri National Park
Application overview
Listed Building Consent to install photovoltaic panels on kitchen roof, to renew the oak beam in the lobby, and to retain unauthorised works, including the rebuilding of two chimneys, renewing an oak beam above the main staircase, removal of areas of internal plaster, alterations to previously approved bathroom and shower room layouts, and installing an additional paved area to the north side garden (Re-Submission)
Proposal details
Reference
NP5/58/LB443Q
Alternative references
PP-14029400_C
Ward
Dyffryn Ardudwy ED
Parish
Dyffryn Ardudwy
Agent
Mr. Gruffydd Price RIBA
UPRN
10070368768
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be carried out in accordance with the following approved plans: • 1849H – 01 – Ground Floor Plan As Existing – received 02.06.2025 • 1849H – 02 – Upper Floor Plans & Sections As Existing – received 16.06.2025 • 1849H – 03 – Elevations As Existing – dated 25.03.22 • 1849H – 04F – Ground Floor Plan As Proposed – received 21.08.2025 • 1849H – 05D – Upper Floor Plans & Sections As Proposed – dated 15.05.25 • 1849H – 06G – Elevations As Proposed – received 21.08.2025 • Johnston, A. (2022). Protected Species Survey Report – for Taltreuddyn Fawr, Dyffryn Ardudwy, Gwynedd, LL44 2RQ – undertaken by A.L. Johnston – dated 6th September 2022. • Johnston, A. (2025). Addendum to the Protected Species Survey Report for Taltreuddyn Fawr, Dyffryn Ardudwy, Gwynedd, LL44 2RQ – undertaken by A.L. Johnston Ecology – dated 31st July 2025. • 1849HGPV020625 - Heritage Impact Statement – for proposed photovoltaic installation, etc – at Taltreuddyn Fawr, Dyffryn Ardudwy, LL44 2RQ – received 02.06.2025 • 1849HGPrev150525 – Design and Access Statement – for Photovoltaic Panels, etc – received 19.05.2025 • Green Infrastructure Statement and Biodiversity Enhancement Scheme – dated 2 August 2025. • Taltreuddyn Fawr, Dyffryn Ardudwy - Location Plan – dated 02.12.2021.
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • 1849H – 01 – Ground Floor Plan As Existing – received 02.06.2025 • 1849H – 02 – Upper Floor Plans & Sections As Existing – received 16.06.2025 • 1849H – 03 – Elevations As Existing – dated 25.03.22 • 1849H – 04F – Ground Floor Plan As Proposed – received 21.08.2025 • 1849H – 05D – Upper Floor Plans & Sections As Proposed – dated 15.05.25 • 1849H – 06G – Elevations As Proposed – received 21.08.2025 • Johnston, A. (2022). Protected Species Survey Report – for Taltreuddyn Fawr, Dyffryn Ardudwy, Gwynedd, LL44 2RQ – undertaken by A.L. Johnston – dated 6th September 2022. • Johnston, A. (2025). Addendum to the Protected Species Survey Report for Taltreuddyn Fawr, Dyffryn Ardudwy, Gwynedd, LL44 2RQ – undertaken by A.L. Johnston Ecology – dated 31st July 2025. • 1849HGPV020625 - Heritage Impact Statement – for proposed photovoltaic installation, etc – at Taltreuddyn Fawr, Dyffryn Ardudwy, LL44 2RQ – received 02.06.2025 • 1849HGPrev150525 – Design and Access Statement – for Photovoltaic Panels, etc – received 19.05.2025 • Green Infrastructure Statement and Biodiversity Enhancement Scheme – dated 2 August 2025. • Taltreuddyn Fawr, Dyffryn Ardudwy - Location Plan – dated 02.12.2021.
If the hereby approved photovoltaic panels and associated equipment become redundant or obsolete, then the photovoltaic panels and all associated equipment must be removed within six months of the development ceasing to operate and the site restored to its former condition.
Os bydd y paneli ffotofoltäig a'r offer cysylltiedig a gymeradwywyd drwy hyn yn dod yn ddiangen neu'n hen ffasiwn, yna rhaid cael gwared ar y paneli ffotofoltäig a'r holl offer cysylltiedig o fewn chwe mis i'r datblygiad beidio â gweithredu ac adfer y safle i'w gyflwr blaenorol.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To safeguard the amenities of the area in accordance with Eryri Local Development Plan Policies and in particular Development Policy 1.
I ddiogelu amwynderau'r ardal yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi Datblygu 1.
No works to which this permission relates shall take place between the 1st of April and the 30th of September inclusive in any calendar year.
Ni chaiff unrhyw waith y mae’r caniatâd hwn yn ymwneud ag ef ddigwydd rhwng 1af Ebrill a 30ain Medi yn gymhwysol mewn unrhyw flwyddyn galendr.
Notwithstanding Condition 2 above, only four photovoltaic panels shall be installed on the northern end of the wesatern elevation of the kitchen roof as shown in the hereby approved drawings ‘1849H – 06G – Elevations as Proposed – Received 21/08/2025’ and ‘1849H-04F- Ground Floor Plan As Proposed – Received 21/08/2025’. No works shall be undertaken inside the roof void.
Er gwaethaf Amod 2 uchod, dim ond pedwar panel ffotofoltäig a osodir ar ben gogleddol drychiad gorllewinol to'r gegin fel y dangosir yn y lluniadau a gymeradwywyd drwy hyn '1849H – 06G – Elevations as Proposed – Derbyniwyd 21/08/2025' a '1849H-04F- Ground Floor Plan As Proposed – Derbyniwyd 21/08/2025'. Ni ddylid ymgymryd ag unrhyw waith y tu mewn i wagle'r to.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with policies A, D an d 1 of the Eryri Local Development Plan Policies.
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â pholisïau A, D ac 1 o Bolisïau Cynllun Datblygu Lleol Eryri.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with policies A, D an d 1 of the Eryri Local Development Plan Policies.
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â pholisïau A, D ac 1 o Bolisïau Cynllun Datblygu Lleol Eryri.
Advisory You are advised that there is an undischarged condition for an archaeological building record from the original consent pair (Condition 20 on NP5/58/LB443D, dated to 02/11/2023, and Condition 07 on NP5/58/LB443E, dated 07/12/2023). The condition states that the report should be submitted within 6 months of the completion of the fieldwork, which Heneb understand has concluded. As such, there is currently a breach of condition, and you are reminded to submit the relevant report to the Local Planning Authority for approval through the submission of a formal application.
Cynghorol Fe'ch cynghorir bod amod heb ei ryddhau ar gyfer cofnod adeiladu archaeolegol o'r pâr caniatâd gwreiddiol (Amod 20 ar NP5/58/LB443D, dyddiedig 02/11/2023, ac Amod 07 ar NP5/58/LB443E, dyddiedig 07/12/2023). Mae'r amod yn nodi y dylid cyflwyno'r adroddiad o fewn 6 mis i gwblhau'r gwaith maes, y mae Heneb yn deall ei fod wedi'i gwblhau. Felly, mae tor-amod ar hyn o bryd, ac fe'ch atgoffir i gyflwyno'r adroddiad perthnasol i'r Awdurdod Cynllunio Lleol i'w gymeradwyo trwy gyflwyno cais ffurfiol.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.