Demolition of rear conservatory and erection of extension. Replace existing roof of garage with new seamed metal roof and installation of external cladding
Nantglas, 64 Llwyn Ynn, Talybont, LL43 2AL
All consultations completeReference: NP5/58/681Eryri National Park
Last published check: 4 Oct 2026, 00:35. Check the council record for more recent changes.
Application location
Nantglas, 64 Llwyn Ynn, Talybont, LL43 2AL
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Full
Received
6 Mar 2026
Validated
Not published
Determination deadline
30 Apr 2026
Local authority
Eryri National Park
Application overview
Demolition of rear conservatory and erection of extension. Replace existing roof of garage with new seamed metal roof and installation of external cladding
Proposal details
Reference
NP5/58/681
Alternative references
PP-14756517
Development type
Householder
Ward
Dyffryn Ardudwy ED
Parish
Dyffryn Ardudwy
Agent
Mr Mark Bathgate
UPRN
100100023616
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing no 3 – Location and Block plans • Drawing no 2 – Proposed Floor Plans and Elevations including biodiversity enhancement measures • Bat Survey Report - I&G Ecological Consulting Ltd • Ref – A174 – GS – 1 - Green Infrastructure Statement dated March 2026
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Drawing no 3 – Location and Block plans • Drawing no 2 – Proposed Floor Plans and Elevations including biodiversity enhancement measures • Bat Survey Report - I&G Ecological Consulting Ltd • Ref – A174 – GS – 1 - Green Infrastructure Statement dated March 2026
The applicant/developer shall ensure that the Biodiversity Enhancement measures detailed on Drawing no 2 – Proposed Floor Plans and Elevations and in the Green Infrastructure Statement dated March 2026 shall be followed and implemented in full within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
The bird box shall be installed on the north-east elevation and shall be of woodstone/woodcrete construction and shall be installed within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D. D.
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D.
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D.
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D.
Er mwyn atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, er mwyn amddiffyn iechyd a diogelwch trigolion presennol a sicrhau nad oes unrhyw lygredd na niwed i'r amgylchedd.
Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau Gwella Bioamrywiaeth a nodir ar Luniad rhif 2 – Cynlluniau Llawr ac Esgyniad Arfaethedig ac yn y Datganiad Seilwaith Gwyrdd dyddiedig Mawrth 2026 yn cael eu dilyn a'u gweithredu'n llawn o fewn 3 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'i gadw wedi hynny.
Rhaid gosod y blwch adar ar y drychiad gogledd-ddwyreiniol a rhaid iddo fod o adeiladwaith carreg bren/concrit pren a rhaid ei osod o fewn 3 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'i gadw wedi hynny.
Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol nac yn anuniongyrchol i'r system garthffosiaeth gyhoeddus.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.