Improvements to pedestrian access including creating a new path and a 160 metres long zig zag formation to enable access for all terrain mobility scooters, wheelchairs and push chairs
Coed Gors y Gedol, Dyffryn Ardudwy. LL44 2RJ
All consultations completeReference: NP5/58/658Eryri National Park
Last published check: 2 Oct 2026, 04:58. Check the council record for more recent changes.
Application location
Coed Gors y Gedol, Dyffryn Ardudwy. LL44 2RJ
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Full
Received
14 Jan 2025
Validated
Not published
Determination deadline
10 Mar 2025
Local authority
Eryri National Park
Application overview
Improvements to pedestrian access including creating a new path and a 160 metres long zig zag formation to enable access for all terrain mobility scooters, wheelchairs and push chairs
Proposal details
Reference
NP5/58/658
Alternative references
PP-12279730
Ward
Dyffryn Ardudwy ED
Parish
Dyffryn Ardudwy
Agent
Ms. Jodie Pritchard
UPRN
200001702782
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing No GG/13/02 – Location Plan • Drawing No GYGFIP – Footpath Plan • Drawing No GYGFIELD – Elevation Drawing • Drawing No GYGFICSP – Cross Section Drawing • Drawing No GYGFIP – Tree Constraints Plan • Drawing No GYGFIP – Tree Protection Plan • Preliminary Ecological Assessment by Cambrian Ecology – dated 21st November 2024 • Construction Environmental Management Plan by Cambrian Ecology – dated 18th March 2025 • Heritage Impact and Assessment by Baileys & Partners dated May 2025 • E-mail from Jodie Pritchard dated 22nd May 2025 detailing planting.
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Drawing No GG/13/02 – Location Plan • Drawing No GYGFIP – Footpath Plan • Drawing No GYGFIELD – Elevation Drawing • Drawing No GYGFICSP – Cross Section Drawing • Drawing No GYGFIP – Tree Constraints Plan • Drawing No GYGFIP – Tree Protection Plan • Preliminary Ecological Assessment by Cambrian Ecology – dated 21st November 2024 • Construction Environmental Management Plan by Cambrian Ecology – dated 18th March 2025 • Heritage Impact and Assessment by Baileys & Partners dated May 2025 • E-mail from Jodie Pritchard dated 22nd May 2025 detailing planting.
The applicant/developer shall ensure that mitigation for the site as detailed in section 9, pages 18 & 19, of the Preliminary Ecological Assessment by Cambrian Ecology Ltd – dated 21st November 2024 are followed and implemented in full.
Rhaid i'r ymgeisydd/datblygwr sicrhau bod y mesurau lliniaru ar gyfer y safle fel y manylir yn adran 9, tudalennau 18 a 19, o'r Asesiad Ecolegol Rhagarweiniol gan Cambrian Ecology Ltd – dyddiedig 21 Tachwedd 2024 yn cael ei ddilyn a'i weithredu'n llawn.
The biodiversity enhancement measures listed in section 10 of the Preliminary Ecological Assessment by Cambrian Ecology Ltd – dated 21st November 2024 shall be implemented within 3 months following the substantial completion of the development hereby permitted and retained thereafter.
Rhaid gweithredu'r mesurau gwella bioamrywiaeth a restrir yn adran 10 o'r Asesiad Ecolegol Rhagarweiniol gan Cambrian Ecology Ltd – dyddiedig 21 Tachwedd 2024 o fewn 3 mis yn dilyn cwblhad sylweddol y datblygiad a ganiateir drwy hyn a rhaid ei gadw felly wedi hynny.
All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is sooner; and any trees or plants which within the period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Rhaid cynnal yr holl waith plannu, hadu neu osod tywirch sydd wedi'i gynnwys yn y manylion tirlunio cymeradwy yn y tymhorau plannu a hadu cyntaf wedi i'r adeiladau gael eu meddiannu neu wedi cwblhad y datblygiad, pa un bynnag sydd gyntaf; a rhaid disodli unrhyw goed neu blanhigion sydd o fewn y cyfnod o 5 mlynedd o gwblhau'r datblygiad, yn marw, yn cael eu symud ymaith neu'n cael eu difrodi'n ddifrifol neu'n heintus, a hynny yn y tymor plannu nesaf, a dylid eu disodli gydag eraill o faint a rhywogaeth debyg.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales.
I sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales.
I sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru.
To preserve and enhance the visual amenities of the area, in accordance with Eryri Local Development Plan Policies and in particular Policy 1.
Er mwyn sicrhau bod y datblygiad yn edrych yn foddhaol yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn enwedig Polisi 1.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.