Council planning record

Relocation and re-siting of 9 static holiday caravans (no increase in overall number of units) within the existing site boundary, together with a relocated play area and environmental improvements

Sarnfaen Holiday Park, Talybont. LL43 2AZ

All consultations completeReference: NP5/58/19MEryri National Park

Last published check: 4 Oct 2026, 04:10. Check the council record for more recent changes.

Application location

Sarnfaen Holiday Park, Talybont. LL43 2AZ

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
Not published
Validated
Not published
Determination deadline
17 May 2026
Local authority
Eryri National Park

Application overview

Relocation and re-siting of 9 static holiday caravans (no increase in overall number of units) within the existing site boundary, together with a relocated play area and environmental improvements

Proposal details

Reference
NP5/58/19M
Alternative references
PP-14796899
Ward
Dyffryn Ardudwy ED
Parish
Dyffryn Ardudwy
Agent
Mr. David Middleton
UPRN
10070347587

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 17 of 17

DocumentPublishedAction
ApplicationFormRedacted.pdf27 Mar 2026View
1.2500_Location_Plan_-_Sarnfaen_Caravan_Park_(February_2026).pdf27 Mar 2026View
561-LST-XX-XX-DR-D-0100_Drainage_Strategy_Layout_Plan_P01.pdf27 Mar 2026View
561-LST-XX-XX-RP-D-0001-Drainage_Strategy_P02_-March_2026.pdf27 Mar 2026View
ECO_1406_-_Sarnfaen_Holiday_Park_-_Preliminary_Ecological_Appraisal_C.pdf27 Mar 2026View
ECO_1406_Sarnfaen_Holiday_Park_-_Green_Infrastructure_Statement_FINAL_04.03.26.pdf27 Mar 2026View
Sarnfaen_Planning_Design_and_Access_Statement_(March_2026).pdf27 Mar 2026View
W2899_1001_A__1.200_Detailed_Landscape_Proposals.pdf27 Mar 2026View
W2899_1002_1.50_Indicative_Cross_Sections.pdf27 Mar 2026View
W2899_SK02_B_1.500_Design_Concept.pdf27 Mar 2026View
W2899_SK03_B__1.1000_Units_Removed_Landscape_Enhancements.pdf27 Mar 2026View
W2949_Landscape_and_Visual_Impact_Assessment_V1.pdf27 Mar 2026View
S - Trwyddedu / Licensing2 Apr 2026View
S - CNC / NRW9 Apr 2026View
S - Cyngor Cymuned / Community Council9 Apr 2026View
S - Dwr Cymru / Welsh Water17 Apr 2026View
Rh.P9 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Registration date

    Published milestoneCouncil source
  2. Site notice date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan Detailed Landscape Proposals Ref: W2899 1001_A (1:200 @ A0) (February 2026) Indicative Cross Sections Ref: W2899 1002 (1:50 @ A0) (February 2026) Design Concept Ref: W2899 SK02_B (1:500 @ A3) (October 2025) Landscape and Visual Impact Assessment V1 Ref: W2949 (February 2026) Units Removed / Landscape Enhancements Ref: W2899 SK03_B (1:1000 @ A3) (October 2025) Prelminary Ecological Appraisal Ref: ECO_1406_C (February 2026) Green Infrastructure Statement FINAL Ref: ECO_1406 (March 2026) Drainage Strategy P02 Ref: 561-LST-XX-XX-RP-D-0001 (March 2026) Drainage Strategy Layout Plan P01 Ref: 561-LST-XX-XX-RP-D-0100 (March 2026)
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan Detailed Landscape Proposals Ref: W2899 1001_A (1:200 @ A0) (February 2026) Indicative Cross Sections Ref: W2899 1002 (1:50 @ A0) (February 2026) Design Concept Ref: W2899 SK02_B (1:500 @ A3) (October 2025) Landscape and Visual Impact Assessment V1 Ref: W2949 (February 2026) Units Removed / Landscape Enhancements Ref: W2899 SK03_B (1:1000 @ A3) (October 2025) Prelminary Ecological Appraisal Ref: ECO_1406_C (February 2026) Green Infrastructure Statement FINAL Ref: ECO_1406 (March 2026) Drainage Strategy P02 Ref: 561-LST-XX-XX-RP-D-0001 (March 2026) Drainage Strategy Layout Plan P01 Ref: 561-LST-XX-XX-RP-D-0100 (March 2026)
  5. The re-located static units shall not be occupied between 7th January and 1st March in the following year.
  6. The units shall be occupied as holiday accommodation only and shall not be occupied as a person’s sole or main place of residence.
  7. No development shall take place until samples of the materials by the submission of an external finishes palette to be used on the external walls of the Static Caravan Units have been submitted to and approved by the Local Planning Authority by means of a formal application. Development shall be carried out in accordance with the approved details.
  8. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is sooner; and any trees or plants which within the period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
  9. The applicant/developer shall ensure that the enhancement measure detailed in section 5.7 in Preliminary Ecological Appraisal by Eco-Scope dated 19/02/26 and Green Infrastructure Statement by Eco-Scope dated 04/03/26 are followed and implemented in full.
  10. Any habitat removal should not be undertaken during the bird breeding period (1st March –31st August, inclusive), or, an ecologist should survey the habitat immediately prior to removal to determine the presence of breeding birds and mitigate accordingly.
  11. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  12. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  13. To define the permission and for the avoidance of doubt.
  14. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  15. To ensure that the site does not become a permanent residential site and to safeguard the landscape character of the area in accordance with Policy 22 of the Eryri Local Development Plan.
  16. To ensure that the site does not become a permanent residential site in accordance with Policy 22 of the Eryri Local Development Plan.
  17. To ensure a satisfactory standard of appearance of the development and the use of appropriate materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1 and 6.
  18. To preserve and enhance the visual amenities of the area, in accordance with Eryri Local Development Plan Policies and in particular Policy 1.
  19. To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D.
  20. To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D.
  21. Advisory Notes: 1. FLOOD AND WATER MANAGEMENT ACT (FWMA) 2010 THE SUSTAINABLE DRAINAGE (APPROVAL AND ADOPTION PROCEDURE)(WALES) REGULATIONS 2018 Following the introduction of the above legislation on 7th January 2019, sustainable drainage systems have become a mandatory requirement on new development of more than 1 dwelling house or where the construction area is 100m2 or more. It is considered that this development, as it appears, exceeds the above identified threshold and may require Sustainable Drainage Systems (SuDS) consent from the relevant Sustainable Drainage Systems Approval Body (SAB). Consequently, you are advised to contact the relevant Sustainable Drainage Systems Approval Body (SAB) at Gwynedd Council ( https://www.gwynedd.llyw.cymru/en/Residents/Planning-and-building-control/Planning/Sustainable-Drainage-Systems.aspx) for advice and guidance on this matter. PLEASE NOTE: If SUDS consent is required this will need approval from the SAB prior to the commencement of any works on site. 2. The developer should adhere to pollution prevention guidelines during the construction phase, you should take any precaution to prevent contamination of surface water drains and local watercourses. Oils and chemicals should be stored in bunded areas and spill kits should be readily available in case of accidental spillages. For further guidance please refer to GPP 5 at the following link: Guidance for Pollution Prevention (GPP) documents | NetRegs | Environmental guidance for your business in Northern Ireland & Scotland
  22. Ni chaniateir meddiannu'r unedau sefydlog sydd wedi'u hadleoli rhwng 7 Ionawr a 1 Mawrth yn y flwyddyn ganlynol.
  23. Dim ond fel llety gwyliau y bydd yr unedau'n cael eu meddiannu ac ni chaniateir eu meddiannu fel unig neu brif breswylfa person.
  24. Ni fydd unrhyw ddatblygiad yn digwydd nes bod samplau o'r deunyddiau, trwy gyflwyno palet gorffeniadau allanol i'w defnyddio ar waliau allanol yr Unedau Carafanau Statig, wedi'u cyflwyno i'r Awdurdod Cynllunio Lleol a'u cymeradwyo ganddo trwy gais ffurfiol. Rhaid cyflawni'r datblygiad yn unol â'r manylion cymeradwy.
  25. Rhaid cynnal yr holl blannu, hau neu dywarchen sydd wedi'u cynnwys yn y manylion tirlunio cymeradwy yn ystod y tymhorau plannu a hau cyntaf yn dilyn meddiannu'r adeiladau neu gwblhau'r datblygiad, pa un bynnag sydd gyntaf; a rhaid disodli unrhyw goed neu blanhigion sydd, o fewn y cyfnod o 5 mlynedd o gwblhau'r datblygiad, yn y tymor plannu nesaf gydag eraill o faint a rhywogaeth debyg.
  26. The applicant/developer shall ensure that the enhancement measure detailed in section 5.7 in Preliminary Ecological Appraisal by Eco-Scope dated 19/02/26 and Green Infrastructure Statement by Eco-Scope dated 04/03/26 are followed and implemented in full.
  27. Ni ddylid tynnu unrhyw gynefin yn ystod cyfnod bridio adar (1 Mawrth – 31 Awst, gan gynnwys y cyfnod), neu, dylai ecolegydd arolygu'r cynefin yn syth cyn ei dynnu i benderfynu ar bresenoldeb adar sy'n bridio a lliniaru yn unol â hynny.
  28. Er mwyn sicrhau nad yw'r safle'n dod yn safle preswyl parhaol ac i ddiogelu cymeriad tirwedd yr ardal yn unol â Pholisi 22 o Gynllun Datblygu Lleol Eryri.
  29. Er mwyn sicrhau nad yw'r safle'n dod yn safle preswyl parhaol yn unol â Pholisi 22 o Gynllun Datblygu Lleol Eryri.
  30. Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnyddio deunyddiau priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn benodol polisïau 1 a 6.
  31. Er mwyn gwarchod a gwella amwynderau gweledol yr ardal, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi 1.
  32. Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D.
  33. Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D.
  34. Nodiadau Cynghori: 1. DEDDF RHEOLI LLIFOGYDD A D"[R (RhDD) 2010 RHEOLIADAU DRAENIO CYNALIADWY (GWEITHDREFN CYMERADWYO A MABWYSIADU) (CYMRU) 2018 Yn dilyn cyflwyno'r ddeddfwriaeth uchod ar 7 Ionawr 2019, mae systemau draenio cynaliadwy wedi dod yn ofyniad gorfodol ar ddatblygiad newydd o fwy nag 1 t"} annedd neu lle mae'r ardal adeiladu yn 100m2 neu fwy. Ystyrir bod y datblygiad hwn, fel y mae'n ymddangos, yn rhagori ar y trothwy a nodwyd uchod ac efallai y bydd angen caniatâd Systemau Draenio Cynaliadwy (SDCau) gan y Corff Cymeradwyo Systemau Draenio Cynaliadwy (SAB) perthnasol. O ganlyniad, cynghorir chi i gysylltu â'r Corff Cymeradwyo Systemau Draenio Cynaliadwy (SAB) perthnasol yng Nghyngor Gwynedd ( https://www.gwynedd.llyw.cymru/cy/Preswylwyr/Cynllunio-a-rheoli-adeiladu/Cynllunio/Systemau-Draenio-Cynaliadwy.aspx) i gael cyngor ac arweiniad ar y mater hwn. NODER: Os oes angen caniatâd SUDS bydd angen cymeradwyaeth y SAB cyn dechrau unrhyw waith ar y safle. 2. Dylai'r datblygwr lynu wrth ganllawiau atal llygredd yn ystod y cyfnod adeiladu, dylech gymryd unrhyw ragofalon i atal halogi draeniau d"{r wyneb a chyrsiau d"{r lleol. Dylid storio olewau a chemegau mewn ardaloedd wedi'u bwndio a dylai citiau gollyngiadau fod ar gael yn rhwydd rhag ofn gollyngiadau damweiniol. Am ragor o ganllawiau, cyfeiriwch at GPP 5 yn y ddolen ganlynol: Guidance for Pollution Prevention (GPP) documents | NetRegs | Environmental guidance for your business in Northern Ireland & Scotland
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.