Conversion of outbuilding into annexe accommodation in connection with the Bed and Breakfast use, internal and external alterations and the installation of an air source heat pump, engineering works to the vehicular access, including resurfacing.
Bryn Mair, Dolgellau. LL40 1SR
All consultations completeReference: NP5/57/LB406BEryri National Park
Last published check: 3 Oct 2026, 02:58. Check the council record for more recent changes.
Application location
Bryn Mair, Dolgellau. LL40 1SR
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Full
Received
23 Dec 2025
Validated
Not published
Determination deadline
16 Feb 2026
Local authority
Eryri National Park
Application overview
Conversion of outbuilding into annexe accommodation in connection with the Bed and Breakfast use, internal and external alterations and the installation of an air source heat pump, engineering works to the vehicular access, including resurfacing.
Proposal details
Reference
NP5/57/LB406B
Alternative references
PP-13649253_C
Ward
De Dolgellau ED
Parish
Dolgellau
Agent
Catrin James
UPRN
200003200731
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans and details contained within the application form, and in any other documents accompanying the application, unless condition(s) to amend them is/are included on this planning decision notice: Site Location Plan D950.01 Rev F Existing Site Plan D950.02 Rev B Existing Floor Plans D950.03 Rev A Existing Elevations D950.04 Rev A Proposed Site Plan D950.12 Rev D Proposed Floor Plans D950.05 Rev C Proposed Elevations D950.06 Rev D Window Detail to Existing Opening D950.09 Proposed New Opening Window Detail D950.11 Bat Mitigation Strategy D950.07 Proposed Ecological Enhancements D950.14 (02/07/26) Bat Emergence Survey 21st May & 25th June 2024 Cartmel Ecology Ltd Green Infrastructure Statement November 2024 Arboricultural Method Statement and Tree Survey Schedule - May 2026 Still Green Tree Protection Plan 03.06.26 Still Green Heritage Impact Statement P07
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod a’r manylion a gynhwysir yn y ffurflen gais, ac mewn unrhyw ddogfennau eraill sy'n cyd-fynd â'r cais, oni bai bod amod(au) i'w diwygio wedi'u cynnwys ar yr hysbysiad penderfyniad cynllunio hwn: Site Location Plan D950.01 Rev F Existing Site Plan D950.02 Rev B Existing Floor Plans D950.03 Rev A Existing Elevations D950.04 Rev A Proposed Site Plan D950.12 Rev D Proposed Floor Plans D950.05 Rev C Proposed Elevations D950.06 Rev D Window Detail to Existing Opening D950.09 Proposed New Opening Window Detail D950.11 Bat Mitigation Strategy D950.07 Proposed Ecological Enhancements D950.14 (02/07/26) Bat Emergence Survey 21st May & 25th June 2024 Cartmel Ecology Ltd Green Infrastructure Statement November 2024 Arboricultural Method Statement and Tree Survey Schedule - May 2026 Still Green Tree Protection Plan 03.06.26 Still Green Heritage Impact Statement P07
Before the first use of the development hereby approved, the bat roost and shown on drawing ‘Bat Mitigation Strategy D950.07’ shall be completed, and it shall be maintained and retained for the lifetime of the development hereby approved; any repairs shall be of an equivalent specification
Cyn defnyddio'r datblygiad a gymeradwyir drwy hyn am y tro cyntaf, rhaid cwblhau'r man gorffwys i ystlumod a ddangosir ar y gynllun ‘Bat Mitigation Strategy D950.07’, a rhaid ei gynnal a'i gadw drwy gydol oes y datblygiad a gymeradwyir drwy hyn; rhaid i unrhyw waith atgyweirio fod o fanyleb gyfatebol.
Before the first use of the development hereby approved, the biodiversity enhancement(s) shown on drawing(s) ‘Proposed Ecological Enhancements D950.14 (02/07/26)’, ‘Bat Mitigation Strategy D950.07’ and ‘Proposed Elevations D950.06 Rev D’ shall be installed. The biodiversity enhancement(s) shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development; any replacements shall be of an equivalent specification
Cyn defnyddio'r datblygiad a gymeradwyir drwy hyn am y tro cyntaf, rhaid gosod y gwelliannau bioamrywiaeth a ddangosir ar y lluniadau ‘Proposed Ecological Enhancements D950.14 (02/07/26)’, ‘Bat Mitigation Strategy D950.07’ a ‘Proposed Elevations D950.06 Rev D’. Wedi hynny, rhaid cynnal y gwelliannau bioamrywiaeth yn unol â chyfarwyddiadau'r gwneuthurwr a'u cadw drwy gydol oes y datblygiad; rhaid i unrhyw eitemau a ddefnyddir i'w disodli fod â manyleb gyfatebol
The roof of the development shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter
Rhaid gorchuddio to'r datblygiad â llechi mwynol naturiol o Gymru, neu â llechi sydd â lliw, gwead a nodweddion hindreulio cyfatebol i'r llechi ar brif do'r annedd, a rhaid eu cynnal a'u cadw wedi hynny
The development hereby approved shall not commence until a photographic survey of the buildings has been undertaken in accordance with the Heneb Requirements for General Photographic Surveys of Buildings, and the survey submitted to and approved in writing by the Local Planning Authority by way of a formal application
Ni chaiff y datblygiad a gymeradwyir drwy hyn ddechrau nes bod arolwg ffotograffig o'r adeiladau wedi'i gynnal yn unol â 'Heneb Requirements for General Photographic Surveys of Buildings', a bod yr arolwg wedi'i gyflwyno i'r Awdurdod Cynllunio Lleol a'i gymeradwyo ganddo yn ysgrifenedig drwy gyfrwng cais ffurfiol
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system
Ni chaniateir i unrhyw dd"{r wyneb sy'n deillio o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtilás ddraenio'n uniongyrchol neu'n anuniongyrchol i'r system garthffosiaeth gyhoeddus
The use of the external light(s) in connection with the use of the development hereby approved shall not commence until the external light(s) have been installed in accordance with drawing(s) ‘Proposed Elevations D950.06 Rev D’ and ‘Bat Mitigation Strategy D950.07’. No additional external lighting shall be installed in the development hereby approved
Ni chaiff y defnydd o'r golau/golauiau allanol mewn cysylltiad â defnyddio'r datblygiad a gymeradwyir drwy hyn ddechrau nes bod y golau/golauiau allanol wedi'u gosod yn unol â'r gynllun(iau) ‘Proposed Elevations D950.06 Rev D’ a ‘Bat Mitigation Strategy D950.07’. Ni chaiff unrhyw oleuadau allanol ychwanegol eu gosod yn y datblygiad a gymeradwyir drwy hyn
Before the operational use of the Air Source Heat Pump (ASHP), hereby approved, the timber screen shown on the ‘Heritage Impact Assessment P07 (May 2006)’ (HIA) shall be completed. The timber screen shown on the HIA shall thereafter be retained for the lifetime of the ASHP hereby approved, and any replacements shall be completed in accordance with the HIA
Cyn defnyddio'r Pwmp Gwres o Ffynhonnell Awyr (ASHP) a gymeradwyir drwy hyn, rhaid cwblhau'r sgrin bren a ddangosir yn yr ‘Heritage Impact Assessment P07 (May 2006)’ (HIA). Rhaid cadw'r sgrin bren a ddangosir yn yr HIA wedi hynny drwy gydol oes yr ASHP a gymeradwyir drwy hyn, a rhaid cwblhau unrhyw waith amnewid yn unol â'r HIA
Before the commencement of excavation(s) and the construction of the development hereby approved, the Tree Protection Fence shall be installed in accordance with drawing ‘Tree Protection Plan 03.06.26 Still Green’. The Tree Protection Fence shall thereafter be retained and maintained in position for the duration of excavation(s) and the construction of the development hereby approved
Cyn dechrau ar y gwaith cloddio ac adeiladu'r datblygiad a gymeradwyir drwy hyn, rhaid gosod y ffens amddiffyn coed yn unol â'r gynllun ‘Tree Protection Plan 03.06.26 Still Green’. Wedi hynny, rhaid cadw'r ffens amddiffyn coed yn ei lle a'i chynnal a'i chadw drwy gydol y gwaith cloddio ac adeiladu'r datblygiad a gymeradwyir drwy hyn
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To minimise disturbance to bats, which are European Protected Species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn lleihau'r aflonyddwch i ystlumod, sy'n Rhywogaethau Gwarchodedig Ewropeaidd yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
To provide biodiversity enhancements in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales
Darparu gwelliannau i fioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a Pholisi Cynllunio Cymru
To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies and in particular policies 1, 6 and A
Er mwyn sicrhau safon foddhaol o ran ymddangosiad y datblygiad a defnydd o ddeunyddiau adeiladu lleol priodol, yn unol â pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol polisïau 1, 6 ac A
To ensure that an adequate record is made of all structures affected by the proposals and that the record is held within the public domain for future reference and research in accordance with Eryri Local Development Plan Policies and in particular policies 1, 6 and A.
Sicrhau bod cofnod digonol yn cael ei wneud o'r holl strwythurau yr effeithir arnynt gan y cynigion, a bod y cofnod yn cael ei gadw yn y parth cyhoeddus at ddibenion cyfeirio ac ymchwil yn y dyfodol, yn unol â pholisïau Cynllun Datblygu Lleol Eryri, ac yn benodol polisïau 1, 6 ac A
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment
Er mwyn atal gorlwytho hydrolig ar y system garthffosiaeth gyhoeddus, diogelu iechyd a diogelwch preswylwyr presennol, a sicrhau nad oes llygredd na niwed i'r amgylchedd
To minimise disturbance to bats, which are European Protected Species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn lleihau'r aflonyddwch i ystlumod, sy'n Rhywogaethau a Warchodir gan Ewrop yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
To safeguard the character and the appearance of the listed buildings in accordance with policies SP Ff and DP 7 of the adopted Eryri Local Development Plan
I ddiogelu cymeriad ac ymddangosiad yr adeiladau rhestredig yn unol â pholisïau SP Ff a DP 7 o Gynllun Datblygu Lleol Eryri a fabwysiadwyd
In order to ensure that damage does not occur to the trees during the construction of the development in accordance with Eryri Local Development Plan Policies and in particular policy 1
Er mwyn sicrhau nad yw'r coed yn cael eu difrodi yn ystod adeiladu'r datblygiad yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol polisi 1
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.