Listed Building Consent to convert the outbuilding into an annexe accommodation in connection with the Bed and Breakfast use, internal and external alterations and the installation of an air-source heat pump
Bryn Mair, Dolgellau. LL40 1SR
All consultations completeReference: NP5/57/LB406AEryri National Park
Last published check: 3 Oct 2026, 07:32. Check the council record for more recent changes.
Application location
Bryn Mair, Dolgellau. LL40 1SR
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Listed Building Consent
Received
18 Aug 2025
Validated
18 Aug 2025
Determination deadline
12 Oct 2025
Local authority
Eryri National Park
Application overview
Listed Building Consent to convert the outbuilding into an annexe accommodation in connection with the Bed and Breakfast use, internal and external alterations and the installation of an air-source heat pump
Proposal details
Reference
NP5/57/LB406A
Alternative references
PP-13649253
Development type
Minor
Ward
De Dolgellau ED
Parish
Dolgellau
Agent
Catrin James
UPRN
200003200731
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans and details contained within the application form, and in any other documents accompanying the application, unless condition(s) to amend them is/are included on this planning decision notice: Site Location Plan D950.01 Rev F Existing Site Plan D950.02 Rev B Existing Floor Plans D950.03 Rev A Existing Elevations D950.04 Rev A Proposed Site Plan D950.12 Rev D Proposed Floor Plans D950.05 Rev C Proposed Elevations D950.06 Rev D Window Detail to Existing Opening D950.09 Proposed New Opening Window Detail D950.11 Bat Mitigation Strategy D950.07 Proposed Ecological Enhancements D950.14 (02/07/26) Bat Emergence Survey 21st May & 25th June 2024 Cartmel Ecology Ltd Heritage Impact Statement P07
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod a’r manylion a gynhwysir yn y ffurflen gais, ac mewn unrhyw ddogfennau eraill sy'n cyd-fynd â'r cais, oni bai bod amod(au) i'w diwygio wedi'u cynnwys ar yr hysbysiad penderfyniad cynllunio hwn: Site Location Plan D950.01 Rev F Existing Site Plan D950.02 Rev B Existing Floor Plans D950.03 Rev A Existing Elevations D950.04 Rev A Proposed Site Plan D950.12 Rev D Proposed Floor Plans D950.05 Rev C Proposed Elevations D950.06 Rev D Window Detail to Existing Opening D950.09 Proposed New Opening Window Detail D950.11 Bat Mitigation Strategy D950.07 Proposed Ecological Enhancements D950.14 (02/07/26) Bat Emergence Survey 21st May & 25th June 2024 Cartmel Ecology Ltd Heritage Impact Statement P07
Before the commencement of the internal works, hereby approved, a photographic survey of the interior of the building shall be submitted to and approved in writing by the Local Planning Authority by way of a formal application
Cyn dechrau'r gwaith mewnol a gymeradwyir drwy hyn, rhaid cyflwyno arolwg ffotograffig o du mewn yr adeilad i'r Awdurdod Cynllunio Lleol, a rhaid iddo gael ei gymeradwyo ganddo yn ysgrifenedig drwy gyfrwng cais ffurfiol
Before the operational use of the Air Source Heat Pump (ASHP), hereby approved, the timber screen shown on the Heritage Impact Assessment P07 (May 2006) (HIA) shall be completed. The timber screen shown on the HIA shall thereafter be retained for the lifetime of the ASHP hereby approved, and any replacements shall be completed in accordance with the HIA
Cyn defnyddio'r pwmp gwres ffynhonnell aer (ASHP) a gymeradwyir drwy hyn at ddibenion gweithredol, rhaid cwblhau'r sgrin bren a ddangosir yn yr Asesiad o'r Effaith ar Dreftadaeth P07 (Mai 2006) (HIA). Rhaid cadw'r sgrin bren a ddangosir yn yr HIA wedi hynny cyhyd ag y bydd y pwmp gwres ffynhonnell aer a gymeradwyir drwy hyn yn cael ei ddefnyddio, a rhaid cwblhau unrhyw waith amnewid yn unol â'r HIA.
To Comply with the Historic Environment (Wales) Act 2023.
I gydymffurfio â Deddf yr Amgylchedd Hanesyddol (Cymru) 2023.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To provide a record of the existing layout of the listed building having regard to the requirements of policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031
Darparu cofnod o gynllun presennol yr adeilad rhestredig, gan ystyried gofynion polisïau A, Ff, 1, 6 a 7 Cynllun Datblygu Lleol Eryri 2016-2031
To safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031
I ddiogelu cymeriad ac ymddangosiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.