Council planning record

Demolition of the existing store, alterations to the garage, installation of gate and resurface the yard area

Meirion House, Finsbury Square, Dolgellau. LL40 1RE

All consultations completeReference: NP5/57/LB361KEryri National Park

Last published check: 2 Oct 2026, 02:43. Check the council record for more recent changes.

Application location

Meirion House, Finsbury Square, Dolgellau. LL40 1RE

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
10 Jan 2025
Validated
Not published
Determination deadline
6 Mar 2025
Local authority
Eryri National Park

Application overview

Demolition of the existing store, alterations to the garage, installation of gate and resurface the yard area

Proposal details

Reference
NP5/57/LB361K
Alternative references
PP-13664259
Ward
Gogledd Dolgellau ED
Parish
Dolgellau
Agent
Mr. Derec Jones
UPRN
200003181652

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
AENot publishedView
DDMNot publishedView
C1Not publishedView
ENot publishedView
C2Not publishedView
C3Not publishedView
LLNot publishedView
FFNot publishedView
S - CNC / NRW5 Feb 2025View
S -YGC12 Feb 2025View
S - Cyngor Tref / Town Council14 Feb 2025View
S - Dwr Cymru Sewer Plan PLA 008509824 Feb 2025View
S - Dwr Cymru24 Feb 2025View
S - Ecoleg / Ecology 26.02.2513 Mar 2025View
RhP18 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Lleoliad/Location Yard L1+02 00 Safle Presennol/Site Existing SP1+01 00 Existing Garage Elevations P1+07 00 Yard Gate Details B1+09 00 Safle Bwriad/Proposed Site SB1+01 06 Proposed Garage Elevations TB1+07 00 Proposed Elevations B1+05 03 Green Infrastructure Statement & Biodiversity Enhancement Scheme (Parc Cenedlaethol Eryri) Green Infrastructure SB1+02 00 Design and Access Statement (09.02.25) Derec H Jones Preliminary Protected Species Survey Report (16.10.24) Alison Johnston
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Lleoliad/Location Yard L1+02 00 Safle Presennol/Site Existing SP1+01 00 Existing Garage Elevations P1+07 00 Yard Gate Details B1+09 00 Safle Bwriad/Proposed Site SB1+01 06 Proposed Garage Elevations TB1+07 00 Proposed Elevations B1+05 03 Green Infrastructure Statement & Biodiversity Enhancement Scheme (Parc Cenedlaethol Eryri) Green Infrastructure SB1+02 00 Design and Access Statement (09.02.25) Derec H Jones Preliminary Protected Species Survey Report (16.10.24) Alison Johnston
  5. The roof of the building shall be covered in natural Welsh mineral slate or slates of the equivalent colour, texture and weathering characteristics as the slates on the main roof of the dwelling house and maintained thereafter
  6. Gorchuddir to'r adeilad â llechi mwynol naturiol Cymreig neu lechi o'r un lliw, gwead a nodweddion hindreulio â'r llechi ar brif do'r t"} annedd a'u cynnal wedi hynny
  7. The removal of the garage roof shall not be carried out between the 1st of April and the 30th of September inclusive in any calendar year unless subject to an ecological watching brief whereby an onsite ecologist oversees the work is undertaken in accordance with the recommendations of the ‘Preliminary Protected Species Survey Report (16.10.24) Alison Johnston’.
  8. Ni cheir tynnu to’r garej rhwng 1af Ebrill a 30ain o Fedi yn gynwysedig mewn unrhyw flwyddyn galendr oni bai ei fod yn amodol ar friff gwylio ecolegol lle mae ecolegydd ar y safle yn goruchwylio’r gwaith yn cael ei wneud yn unol ag argymhellion 'Preliminary Protected Species Survey Report (16.10.24) Alison Johnston’.
  9. Before the first use of the development hereby approved the biodiversity enhancements specified in the plans hereby approved, 'Green Infrastructure Statement & Biodiversity Enhancement Scheme (Parc Cenedlaethol Eryri)', 'Green Infrastructure SB1+02 00 and the Preliminary Protected Species Survey Report (16.10.24) Alison Johnston' shall be installed. The biodiversity enhancements shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development, any replacements shall be of an equivalent specification
  10. Cyn defnydd cyntaf y datblygiad a ganiateir drwy hyn gosodir y gwelliannau bioamrywiaeth a nodir yn y cynlluniau a ganiateir drwy hyn, 'Green Infrastructure Statement & Biodiversity Enhancement Scheme (Parc Cenedlaethol Eryri)', 'Green Infrastructure SB1+02 00 and the Preliminary Protected Species Survey Report (16.10.24) Alison Johnston'. Wedi hynny, rhaid cynnal a chadw’r gwelliannau bioamrywiaeth yn unol â chyfarwyddiadau’r gwneuthurwr a’u cadw am oes y datblygiad, a rhaid i unrhyw rai a amnewidir fod o fanyleb gyfatebol
  11. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  12. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  13. To define the permission and for the avoidance of doubt.
  14. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  15. To ensure a satisfactory standard of appearance of the development and the use of appropriate local building materials, in accordance with Eryri Local Development Plan Policies 2016-2031 and in particular policies 1, 6 and A
  16. Er mwyn sicrhau edrychiad boddhaol i'r datblygiad a'r defnydd o ddeunyddiau adeiladu lleol priodol, yn unol â Pholisïau Cynllun Datblygu Lleol Eryri 2016-2031 ac yn arbennig polisïau 1, 6 ac A
  17. To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with policies A, D and 1 of the Eryri Local Development Plan Policies
  18. Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau a warchodir yn unol â pholisïau A, D ac 1 o Bolisïau Cynllun Datblygu Lleol Eryri
  19. To provide biodiversity enhancements in accord with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales
  20. Darparu gwelliannau bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig a Pholisi Cynllunio Cymru
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.