The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Details as Existing & Proposed KJ3601/01 Rev I (18/11/24) Heritage Statement Rev C Lacy & Owen Green Infrastructure Statement Lacey & Owen
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Details as Existing & Proposed KJ3601/01 Rev I (18/11/24) Heritage Statement Rev C Lacy & Owen Green Infrastructure Statement Lacey & Owen
3) Prior to the first use of the development hereby approved the following biodiversity enhancements shall be installed in the positions shown on the plans hereby approved: - bat access panel - sparrow terrace - House martin cups The biodiversity enhancements shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development, any replacements shall be of an equivalent specification.
The window at ground floor level in the rear elevation (west) of the development hereby approved shall be obscurely glazed (obscurity level 5) and non-opening and this specification shall be retained for the lifetime of the development hereby approved. Any replacements shall be obscurely glazed (obscurity level 5) and non-opening.
Cyn defnydd cyntaf y datblygiad a ganiateir drwy hyn rhaid gosod y gwelliannau bioamrywiaeth a ganlyn yn y mannau a ddangosir ar y cynlluniau a ganiateir drwy hyn: - panel mynediad ystlumod - teras adar y to - Cwpanau Gwennol y Bondo Wedi hynny, rhaid cynnal a chadw’r gwelliannau i fioamrywiaeth yn unol â chyfarwyddiadau’r gwneuthurwr a’u cadw am oes y datblygiad, a rhaid i unrhyw rai a amnewidir fod o fanyleb gyfatebol.
The window at ground floor level in the rear elevation (west) of the development hereby approved shall be obscurely glazed (obscurity level 5) and non-opening and this specification shall be retained for the lifetime of the development hereby approved. Any replacements shall be obscurely glazed (obscurity level 5) and non-opening.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To provide biodiversity enhancements in accord with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales.
I ddarparu gwelliannau bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig a Pholisi Cynllunio Cymru.
I warchod amwynder preswyl a phreifatrwydd eiddo cyfagos yn unol â Pholisïau Cynllun Datblygu Lleol Eryri, yn enwedig Polisi 1.
To protect the residential amenity and privacy of neighbouring properties in accordance with Eryri Local Development Plan Policies, particularly Policy 1.
Informative The planning permission relates solely to the provisions of the Town and Country Planning Act 1990 (as amended). You should ensure that any other separate statutory (such as the Building Regulations) or civil consents necessary are also obtained.
Nodyn Cynghori Mae'r caniatâd cynllunio yn ymwneud â darpariaethau Deddf Cynllunio Gwlad a Thref 1990 (fel y'i diwygiwyd) yn unig. Dylech sicrhau hefyd eich bod yn cael unrhyw gydsyniad statudol arall (fel y Rheoliadau Adeiladu) neu ganiatâd sifil sydd ei angen.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.