Refurbishment of existing building to include new roof, PV panels on roof, replacement fascias and rainwater goods, new windows and doors, new external wall insulation, and chimneys to be refurbished with new beaded post and ventilator caps.
1-6 Rhandai Tegid, Berwyn Street, Bala, LL23 7AA
All consultations completeReference: NP5/53/545AEryri National Park
Last published check: 3 Oct 2026, 10:34. Check the council record for more recent changes.
Application location
1-6 Rhandai Tegid, Berwyn Street, Bala, LL23 7AA
This record has no verified map location.
Application summary
Status
All consultations complete
Application type
Full
Received
11 Nov 2025
Validated
Not published
Determination deadline
5 Jan 2026
Local authority
Eryri National Park
Application overview
Refurbishment of existing building to include new roof, PV panels on roof, replacement fascias and rainwater goods, new windows and doors, new external wall insulation, and chimneys to be refurbished with new beaded post and ventilator caps.
Proposal details
Reference
NP5/53/545A
Development type
Minor
Ward
Y Bala ED
Parish
Bala
Agent
Mr Kevin Shipton
UPRN
200003185132
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Location and Block Plan (Drawing No. AL01-01) - dated May 2025 • Existing Ground & First Floor Plans (Drawing No. AL03-01) – dated May 2025 • Existing Second Floor & Roof Plans (Drawing No. AL03-02) – dated May 2025 • Proposed Ground & First Floor Plans (Drawing No. AL03-03) – dated May 2025 • Proposed Second Floor & Roof Plans (Drawing No. AL03-04) – dated May 2025 • Existing Elevations (Drawing No. AL04-01) – dated May 2025 • Proposed Elevations (Drawing No. AL04-02) – dated May 2025 • Green Infrastructure Statement (GIS) – received the 20th of November 2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Location and Block Plan (Drawing No. AL01-01) - dated May 2025 • Existing Ground & First Floor Plans (Drawing No. AL03-01) – dated May 2025 • Existing Second Floor & Roof Plans (Drawing No. AL03-02) – dated May 2025 • Proposed Ground & First Floor Plans (Drawing No. AL03-03) – dated May 2025 • Proposed Second Floor & Roof Plans (Drawing No. AL03-04) – dated May 2025 • Existing Elevations (Drawing No. AL04-01) – dated May 2025 • Proposed Elevations (Drawing No. AL04-02) – dated May 2025 • Green Infrastructure Statement (GIS) – received the 20th of November 2025
Within three months of the commencement of the development, the biodiversity enhancements specified in the Green Infrastructure Statement (received 20.11.25) hereby approved shall be installed on the southeast facing gable end wall below the roof line of the property, and remain free from artificial illumination at all times. These biodiversity enhancements shall thereafter be retained for the lifetime of the development and any subsequent replacements shall be of an equivalent specification
If the development hereby approved becomes redundant or obsolete, then the photovoltaic panels on the roof and all associated external equipment and fixtures must be removed within six months of the development ceasing to operate.
O fewn tri mis i ddechrau'r datblygiad, rhaid gosod y gwelliannau bioamrywiaeth a bennir yn y Datganiad Seilwaith Gwyrdd (a dderbyniwyd 20.11.25) a gymeradwywyd drwy hyn ar wal talcen y t"} sy'n wynebu'r de-ddwyrain o dan linell do'r eiddo, a rhaid iddynt aros yn rhydd o oleuadau artiffisial bob amser. Rhaid cadw'r gwelliannau bioamrywiaeth hyn wedi hynny am oes y datblygiad a rhaid i unrhyw rai a ailosodir wedyn fod o fanyleb gyfatebol.
Os daw'r datblygiad a gymeradwyir drwy hyn yn ddiangen neu'n hen ffasiwn, yna rhaid cael gwared ar y paneli ffotofoltäig ar y to a'r holl offer a gosodiadau allanol cysylltiedig o fewn chwe mis i'r datblygiad roi'r gorau i weithredu.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
3To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
To safeguard the amenities of the area.
I sicrhau gwelliant mewn bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.