The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plans 0062-nmb-xx-xx-dr-a-1000 Proposed Drawings 0062-NMB-XX-XX-DR-A-1101 Rev 01 Green Infrastructure Proposed ASHP Enclosure Drawings 0062-NMB-XX-XX-DR-A-4101 Statement & Biodiversity Enhancement Scheme (05/11/25) Design & Access Statement Inc. Heritage Statement Abacus EnergySolutions – NAP29953
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Site Location Plans 0062-nmb-xx-xx-dr-a-1000 Proposed Drawings 0062-NMB-XX-XX-DR-A-1101 Rev 01 Green Infrastructure Proposed ASHP Enclosure Drawings 0062-NMB-XX-XX-DR-A-4101 Statement & Biodiversity Enhancement Scheme (05/11/25) Design & Access Statement Inc. Heritage Statement Abacus EnergySolutions – NAP29953
Within 4 months of the planning permission hereby approved, the timber screen shown on drawing 0062-NMB-XX-XX-DR-A-4101 shall be completed. The timber screen shall thereafter be retained for the lifetime of the works hereby approved, and any replacements shall be completed in accordance with drawing 0062-NMB-XX-XX-DR-A-4101.2. Within 4 months of the planning permission hereby approved, the timber screen shown on drawing 0062-NMB-XX-XX-DR-A-4101 shall be completed. The timber screen shall thereafter be retained for the lifetime of the works hereby approved, and any replacements shall be completed in accordance with drawing 0062-NMB-XX-XX-DR-A-4101.
Within 4 months of the planning permission hereby approved, the following biodiversity enhancements shall be installed in accordance with the plans hereby approved. The biodiversity enhancements shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development; any replacements shall be of an equivalent specification.
If the development hereby approved becomes redundant or obsolete, then solar pannels and all associated external equipment and fixtures must be removed within six months of the development ceasing to operate.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To safeguard the character and appearance of the listed building in accordance with policies A, Ff, 1, 6 and 7 of the Eryri Local Development Plan 2016-2031.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
To safeguard the amenities of the area in accordance with Eryri Local Development Plan Policies and, in particular, Development Policy 1.
O fewn 4 mis i'r caniatâd cynllunio a gymeradwywyd drwy hyn, rhaid cwblhau'r sgrin bren a ddangosir ar gynllun 0062-NMB-XX-XX-DR-A-4101. Rhaid cadw'r sgrin bren wedi hynny am oes y gwaith a gymeradwywyd drwy hyn, a rhaid cwblhau unrhyw rai newydd yn unol â chynllun 0062-NMB-XX-XX-DR-A-4101.
O fewn 4 mis i'r caniatâd cynllunio a gymeradwyir drwy hyn, rhaid gosod y gwelliannau bioamrywiaeth canlynol yn unol â'r cynlluniau a gymeradwyir drwy hyn. Wedi hynny, rhaid cynnal y gwelliannau bioamrywiaeth yn unol â chyfarwyddiadau'r gwneuthurwr a'u cadw am oes y datblygiad; rhaid i unrhyw rai newydd fod o fanyleb gyfwerth.
Os bydd y datblygiad a gymeradwyir drwy hyn yn dod yn ddiangen neu'n hen ffasiwn, yna rhaid cael gwared ar baneli solar a'r holl offer a gosodiadau allanol cysylltiedig o fewn chwe mis i'r datblygiad roi'r gorau i weithredu.
Er mwyn diogelu cymeriad ac ymddangosiad yr adeilad rhestredig yn unol â pholisïau A, Ff, 1, 6 a 7 o Gynllun Datblygu Lleol Eryri 2016-2031.
I sicrhau gwelliant mewn bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd.
I ddiogelu amwynderau'r ardal yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac, yn benodol, Polisi Datblygu 1.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.