Council planning record

Installation of air-source heat pump within residential curtilage

5 Glasfryn Terrace, Arthog. LL39 1AZ

All consultations completeReference: NP5/52/394Eryri National Park

Last published check: 3 Oct 2026, 02:30. Check the council record for more recent changes.

Application location

5 Glasfryn Terrace, Arthog. LL39 1AZ

This record has no verified map location.

Application summary

Status
All consultations complete
Application type
Full
Received
9 Aug 2024
Validated
Not published
Determination deadline
3 Oct 2024
Local authority
Eryri National Park

Application overview

Installation of air-source heat pump within residential curtilage

Proposal details

Reference
NP5/52/394
Alternative references
PP-13147293
Ward
Arthog a Llangelynnin ED
Parish
Arthog
Agent
Mr. Matthew Edwards
UPRN
10070352619

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
E4Not publishedView
E2Not publishedView
E5Not publishedView
E1Not publishedView
CSNot publishedView
E3Not publishedView
FFNot publishedView
LL7 Aug 2024View
C17 Aug 2024View
C29 Aug 2024View
RH.P23 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted with conditions
Planning conditions
  1. The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
  2. Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (25 June 2024) Block Plan (13 June 2024) (received 06.08.24) Heat Pumps NXHM 004-016 ASP – Sound Power Level Rello NXHM 006 – 6KW Big Foot System Fix-it Foot Green Infrastructure Statement 3397 Bee Boxes Menai Heating Existing Elevation (A4 1:100) Proposed Elevation (A4 1:100)
  4. Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Location Plan (25 June 2024) Block Plan (13 June 2024) (received 06.08.24) Heat Pumps NXHM 004-016 ASP – Sound Power Level Rello NXHM 006 – 6KW Big Foot System Fix-it Foot Green Infrastructure Statement 3397 Bee Boxes Menai Heating Existing Elevation (A4 1:100) Proposed Elevation (A4 1:100)
  5. Within 1 month of the first operation of the development hereby approved a Beepot shall be positioned in accordance with the manufacturer’s instructions within the residential curtilage of the dwellinghouse subject to this planning permission. The Beepot shall be retained within the residential curtilage of the dwellinghouse and maintained in accord with the manufacturer’s instructions for the lifetime of the development hereby approved, any replacement Beepot shall be of the same specification.
  6. O fewn 1 mis o weithrediad cyntaf y datblygiad a ganiateir drwy hyn rhaid gosod Llety Gwenyn ('Beepot') yn unol â chyfarwyddiadau’r gwneuthurwr o fewn cwrtil preswyl y t"} annedd sy’n destun y caniatâd cynllunio hwn. Rhaid cadw’r Llety Gwenyn o fewn cwrtil preswyl y t"} annedd a’i gynnal yn unol â chyfarwyddiadau’r gwneuthurwr am oes y datblygiad a ganiateir drwy hyn, rhaid i unrhyw Llety Gwenyn newydd fod o’r un fanyleb.
  7. If the development hereby approved becomes redundant or obsolete, then the air source heat pump and all associated external equipment and fixtures must be removed within six months of the development ceasing to operate.
  8. Os daw'r datblygiad a ganiateir drwy hyn yn ddiangen neu'n anarferedig, yna rhaid symud y pwmp gwres ffynhonnell aer a'r holl offer a gosodiadau allanol cysylltiedig o fewn chwe mis i'r dyddiad y daw'r datblygiad i ben.
  9. To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
  10. I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
  11. To define the permission and for the avoidance of doubt.
  12. Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
  13. To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
  14. I sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig.
  15. To safeguard the amenities of the area in accordance with Eryri Local Development Plan Policies and in particular Development Policy 1.
  16. Er mwyn diogelu mwynderau’r ardal yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi Datblygu 1.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.