The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: OS Sitemap (23.02.2010) Existing Block Plan Existing Retaining Wall (Plan Elevation) Existing Retaining Wall (Elevation – Looking East) Existing Retaining Wall (Elevation – Looking North) Existing Retaining Wall (Elevation – Looking South) New Retaining Wall, Walkway and Canopy (Front Elevation – Plan Elevation) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking East) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking North) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking South) Proposed Block Plan Existing Plan And Section Through N2577-01 D Proposed Section Through R. Wall N2577-02 G Proposed Foundation Location Plan N2577-03 F Proposed Plan of Stem and Drainage N2577-04 D Construction Environmental Management Plan Preliminary Ecological Assessment (V2) 11.07.2024
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: OS Sitemap (23.02.2010) Existing Block Plan Existing Retaining Wall (Plan Elevation) Existing Retaining Wall (Elevation – Looking East) Existing Retaining Wall (Elevation – Looking North) Existing Retaining Wall (Elevation – Looking South) New Retaining Wall, Walkway and Canopy (Front Elevation – Plan Elevation) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking East) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking North) New Retaining Wall, Walkway and Canopy (Front Elevation – Looking South) Proposed Block Plan Existing Plan And Section Through N2577-01 D Proposed Section Through R. Wall N2577-02 G Proposed Foundation Location Plan N2577-03 F Proposed Plan of Stem and Drainage N2577-04 D Construction Environmental Management Plan Preliminary Ecological Assessment (V2) 11.07.2024
The approved Construction Method Statement shall be adhered to throughout the demolition, excavation and construction of the development hereby approved
Rhaid cadw at y Datganiad Dull Adeiladu a gymeradwywyd drwy gydol y gwaith dymchwel, cloddio ac adeiladu'r datblygiad a ganiateir drwy hyn
The mitigation measures recommended in Section 7.1 of the ‘Preliminary Ecological Assessment (V2) 11.07.2024’ shall be adhered to throughout the demolition, excavation and construction of the development hereby approved
Glynir at y mesurau lliniaru a argymhellir yn Adran 7.1 o’r ‘Preliminary Ecological Assessment (V2) 11.07.2024’ drwy gydol y gwaith o ddymchwel, cloddio ac adeiladu’r datblygiad a ganiateir drwy hyn
The eradication measures in Section 7.3 of the ‘Preliminary Ecological Assessment (V2) 11.07.2024’ for the eradication of Non-Native Species on the application site (Montbretia) must be carried out between March and May in the same calendar year following the commencement of the development
Rhaid cyflawni’r mesurau dileu yn Adran 7.3 o’r ‘Preliminary Ecological Assessment (V2) 11.07.2024’ ar gyfer dileu Rhywogaethau Estron ar safle’r cais (Montbretia) rhwng mis Mawrth a mis Mai yn yr un flwyddyn galendr yn dilyn dechrau’r datblygiad
Before the first use of the development hereby approved the following biodiversity enhancements shall be installed in the positions shown on the plans hereby approved: - 2 bat box - 5 bee bricks The biodiversity enhancements shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development, any replacements shall be of an equivalent specification.
Cyn defnydd cyntaf y datblygiad a ganiateir drwy hyn rhaid gosod y gwelliannau bioamrywiaeth a ganlyn yn y mannau a ddangosir ar y cynlluniau a ganiateir yma: - blwch 2 ystlumod - 5 o frics gwenyn Wedi hynny, rhaid cynnal a chadw’r gwelliannau i fioamrywiaeth yn unol â chyfarwyddiadau’r gwneuthurwr a’u cadw am oes y datblygiad, a rhaid i unrhyw rai a amnewidir fod o fanyleb gyfatebol
Notwithstanding the details hereby approved and prior to the erection of any external lighting on the site, a Lighting Plan which provides specifications of all lights to be installed shall be submitted to and approved in writing by means of a formal application to the Local Planning Authority. The Lighting Plan shall demonstrate that the proposed lighting will not impact ecological networks and/or sensitive features including adjacent residential properties. The Lighting Plan shall be designed to take into account the advice on lighting set out in the Bat Conservation Trust’s Guidance Note 08/18 Bats and artificial lighting in the UK. The development shall be carried out strictly in accordance with the approved details and thereafter retained for the lifetime of the development
Er gwaethaf y manylion a ganiateir drwy hyn a chyn codi unrhyw oleuadau allanol ar y safle, rhaid cyflwyno i'r Awdurdod Cynllunio Lleol a'i gymeradwyo'n ysgrifenedig Cynllun Goleuo sy'n darparu manylion yr holl oleuadau sydd i'w gosod. Bydd y Cynllun Goleuo yn dangos na fydd y goleuadau arfaethedig yn effeithio ar rwydweithiau ecolegol a/neu nodweddion sensitif gan gynnwys eiddo preswyl cyfagos. Bydd y Cynllun Goleuo’n cael ei ddylunio i ystyried y cyngor ar oleuadau a nodir yn y 'Bat Conservation Trust’s Guidance Note 08/18 Bats and artificial lighting in the UK'. Bydd y datblygiad yn cael ei wneud yn gwbl unol â'r manylion a gymeradwywyd ac wedi hynny yn cael ei gadw am oes y datblygiad
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To safeguard the amenities of adjoining residences and to protect the general environment in accordance with Eryri Local Development Plan Policies and particularly Policy 1 of the Eryri Local Development Plan.
Diogelu mwynderau preswylfeydd cyfagos a gwarchod yr amgylchedd cyffredinol yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn arbennig Polisi 1 Cynllun Datblygu Lleol Eryri
To protect any protected species, present in the construction of the development in accordance with Strategic Policy D of the adopted Eryri Local Development Plan.
Er mwyn gwarchod unrhyw rywogaethau a warchodir sy'n bresennol yn y gwaith o adeiladu'r datblygiad yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig
To prevent the spread of an invasive species and provide biodiversity enhancement in accordance with SP D of the adopted Eryri Local Development Plan and Planning Policy Wales
Rhwystro lledaeniad rhywogaeth ymledol a gwella bioamrywiaeth yn unol â SP D Cynllun Datblygu Lleol Eryri mabwysiedig a Pholisi Cynllunio Cymru
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan
Sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D Cynllun Datblygu Lleol Eryri mabwysiedig
To minimise disturbance to bats, which are European Protected Species in accordance with SP D of the adopted Eryri Local Development Plan and safeguard amenities in accordance with policy DP 1 of the adopted Eryri Local Development Plan
Er mwyn tarfu cyn lleied â phosibl ar ystlumod, sy'n Rhywogaethau a Warchodir gan Ewrop yn unol â SP D o Gynllun Datblygu Lleol Eryri mabwysiedig a diogelu mwynderau yn unol â pholisi DP 1 Cynllun Datblygu Lleol Eryri (wedi'i fabwysiadu)
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.