The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: Existing Location & Block Plans L01 Existing Floor Plans & Elevations S 01(received 10.06.26) Proposed Floor Plans & Elevations P1E (received 10.06.26) Existing Elevation & Section S 02 (received 10.06.26) Bat & Protected Species Survey Report (06th November 2025) Cambrian Ecology Ltd
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: Existing Location & Block Plans L01 Existing Floor Plans & Elevations S 01(received 10.06.26) Proposed Floor Plans & Elevations P1E (received 10.06.26) Existing Elevation & Section S 02 (received 10.06.26) Bat & Protected Species Survey Report (06th November 2025) Cambrian Ecology Ltd
3) Before the first use of the development hereby approved, the following biodiversity enhancement shall be installed in accordance with the plans hereby approved: 2 SP Schwegler Sparrow Terrace Box The biodiversity enhancement shall thereafter be maintained in accordance with the manufacturer’s instructions and shall be retained for the lifetime of the development; any replacements shall be of an equivalent specification.
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system.
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To provide biodiversity enhancements in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and Planning Policy Wales.
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
Advisory Note: 1. Please find enclosed a copy of the Welsh Water comments dated 28.04.26, which lists requirements, including the need for a Build Over Sewer Agreement.
I ddarparu gwelliannau bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a Pholisi Cynllunio Cymru a fabwysiadwyd.
Er mwyn atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, er mwyn amddiffyn iechyd a diogelwch trigolion presennol a sicrhau nad oes unrhyw lygredd na niwed i'r amgylchedd.
Nodyn Cynghori: Gweler copi o sylwadau D"{r Cymru dyddiedig 28.04.26, sy'n rhestru gofynion, gan gynnwys yr angen am Gytundeb Adeiladu Dros Garthffos, wedi'i amgáu.
Cyn y defnydd cyntaf o'r datblygiad a gymeradwyir drwy hyn, rhaid gosod y gwelliant bioamrywiaeth canlynol yn unol â'r cynlluniau a gymeradwyir drwy hyn: 2 SP Schwegler Sparrow Terrace Box Rhaid cynnal y gwelliant bioamrywiaeth wedi hynny yn unol â chyfarwyddiadau'r gwneuthurwr a'i gadw am oes y datblygiad; rhaid i unrhyw rai newydd fod o fanyleb gyfatebol.
Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol nac yn anuniongyrchol i'r system garthffosiaeth gyhoeddus. Open in Google Tra
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.